FY27 Districtwide Flex Base
6511-33-001 · let Nov 5, 2026 · Lubbock, Lubbock · Material Maintenance Project
$141,000Low bid: TOUCHSTONE RESOURCES, LLC-38.7% vs estimate $230,000
$70,580Left on the table50.1% gap to the second bid
2BiddersSpread 50% low to high
3Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TOUCHSTONE RESOURCES, LLC | $141,000 | -38.7% | $70,580 | 0 | 0 | |
| 2 | DIGG COMMERCIAL, LLC | $211,580 | +50.1% | -8.0% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
TOUCHSTONE RESOURCES, LLC vs DIGG COMMERCIAL, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8010-7078 FL BS(TY A GR 4)(DEL)(ST1) | 1,000 CY | $70.00 | $117.17 | $70.00 | $47,170 |
| 8010-7080 FL BS(TY A GR 4)(DEL)(ST3) | 1,000 CY | $50.00 | $62.79 | $50.00 | $12,790 |
| 8010-7079 FL BS(TY A GR 4)(DEL)(ST2) | 300 CY | $70.00 | $105.40 | $70.00 | $10,620 |
Positive: the low bidder was cheaper on that item. These 3 items account for $70,580 of the $70,580 gap.