BU 82 H Overlay/ONYX
0045-09-113 · let Nov 3, 2026 · Lamar, Paris · Overlay
$3,510,998Low bid: DRAKE COMPANIES LLC-4.7% vs estimate $3,685,991
$129,411Left on the table3.7% gap to the second bid
5BiddersSpread 23% low to high
52Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | DRAKE COMPANIES LLC | $3,510,998 | -4.7% | $129,411 | 0 | 3-$2,087,178 | |
| 2 | HIGHWAY 19 CONSTRUCTION LLC | $3,640,409 | +3.7% | -1.2% | $9,105 | 0 | 3-$1,804,733 |
| 3 | OVERLAND CORPORATION | $3,649,514 | +3.9% | -1.0% | $205,995 | 0 | 1-$1,855,892 |
| 4 | RK HALL, LLC | $3,855,508 | +9.8% | 4.6% | $465,737 | 2+$160,666 | 3-$2,135,299 |
| 5 | EAST TEXAS BRIDGE, INC. | $4,321,245 | +23.1% | 17.2% | 1+$33,655 | 1-$1,702,672 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
DRAKE COMPANIES LLC vs HIGHWAY 19 CONSTRUCTION LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $125,000.00 | $350,000.00 | $523,850.32 | $225,000 |
| 344-7041 SP MIXES SP-D PG64-22 | 17,650 TON | $118.00 | $127.00 | $134.97 | $158,850 |
| 100-7002 PREPARING ROW | 326 STA | $995.00 | $730.00 | $6,072.92 | -$86,390 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 1,000 SY | $110.00 | $81.00 | $98.88 | -$29,000 |
| 354-7039 PLANE ASPH CONC PAV(2" TO 4") | 160,422 SY | $3.18 | $3.00 | $4.39 | -$28,876 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $10,000.00 | $3,000.00 | $9,253.78 | -$28,000 |
| 662-7017 WK ZN PAV MRK NON-REMOV (W)24"(SLD) | 4,561 LF | $4.62 | $2.00 | $3.95 | -$11,950 |
| 3006-7001 UNDERSEAL COURSE | 11,232 GAL | $5.50 | $4.50 | $3.65 | -$11,232 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 4,561 LF | $8.00 | $6.40 | $7.19 | -$7,298 |
| 505-7001 TMA (STATIONARY) | 40 DAY | $125.00 | $250.00 | $217.57 | $5,000 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $5,000.00 | $4,000.00 | $11,585.04 | -$5,000 |
| 662-7018 WK ZN PAV MRK NON-REMOV (W)(ARROW) | 66 EA | $110.00 | $39.00 | $82.55 | -$4,686 |
| 505-7003 TMA (MOBILE OPERATION) | 60 DAY | $125.00 | $50.00 | $229.60 | -$4,500 |
| 662-7030 WK ZN PAV MRK NON-REMOV(W)(WORD) | 43 EA | $138.00 | $39.00 | $93.60 | -$4,257 |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 31,164 LF | $0.6700 | $0.5400 | $0.4986 | -$4,051 |
| 666-7042 REFL PAV MRK TY I (W)(ARROW)(100MIL) | 66 EA | $200.00 | $140.00 | $156.95 | -$3,960 |
| 666-7066 REFL PAV MRK TY I (W)(WORD)(100MIL) | 43 EA | $242.00 | $150.00 | $184.78 | -$3,956 |
| 3011-7002 REINFORMT GRID FOR ASPH PVMT (TY II) | 1,050 LF | $8.50 | $5.50 | $7.54 | -$3,150 |
| 662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) | 31,164 LF | $0.4000 | $0.3000 | $0.2770 | -$3,116 |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 19,518 LF | $0.6700 | $0.5400 | $0.4757 | -$2,537 |
Positive: the low bidder was cheaper on that item. These 20 items account for $146,891 of the $129,411 gap.
DRAKE COMPANIES LLC: unbalanced items
Placed 1HIGHWAY 19 CONSTRUCTION LLC: unbalanced items
Placed 2OVERLAND CORPORATION: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 100-7002 PREPARING ROW | 326 STA | $380.00 | $6,072.92 | 0.06x | -$1,855,892 |
RK HALL, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $36,183.41 | $11,585.04 | 3.12x | $122,992 |
| 3006-7001 UNDERSEAL COURSE | 11,232 GAL | $7.00 | $3.65 | 1.92x | $37,674 |
| 100-7002 PREPARING ROW | 326 STA | $751.90 | $6,072.92 | 0.12x | -$1,734,653 |
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $523,850.32 | 0.29x | -$373,850 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $2,554.83 | $9,253.78 | 0.28x | -$26,796 |