CapEx-C - UT Advanced Construction UTAC
0015-13-432 · let Nov 3, 2026 · Travis, Austin · Widen Freeway
$412,233,374Low bid: AUSTIN BRIDGE & ROAD SERVICES, LP+0.6% vs estimate $409,816,599
$3,506,193Left on the table0.9% gap to the second bid
6BiddersSpread 19% low to high
1,471Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | AUSTIN BRIDGE & ROAD SERVICES, LP | $412,233,374 | 0.6% | $3,506,193 | 5+$88,072,650 | 1-$6,187,156 | |
| 2 | PULICE CONSTRUCTION, INC. | $415,739,567 | +0.9% | 1.4% | $57,613,766 | 6+$94,117,765 | 3-$9,576,202 |
| 3 | FLUOR ENTERPRISES, INC. | $473,353,333 | +14.8% | 15.5% | $4,197,220 | 8+$114,265,671 | 2-$6,035,896 |
| 4 | HARPER BROTHERS CONSTRUCTION LLC | $477,550,553 | +15.8% | 16.5% | $13,514 | 11+$92,787,504 | 2-$9,355,835 |
| 5 | WEBBER, LLC | $477,564,067 | +15.8% | 16.5% | $14,570,756 | 7+$145,486,113 | 2-$8,998,236 |
| 6 | BALFOUR BEATTY INFRASTRUCTURE, INC. | $492,134,823 | +19.4% | 20.1% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
AUSTIN BRIDGE & ROAD SERVICES, LP vs PULICE CONSTRUCTION, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 442-7008 STR STEEL (MISCELLANEOUS BRIDGE) | 413,390 LB | $4.97 | $22.00 | $6.21 | $7,040,032 |
| 401-7001 FLOWABLE BACKFILL | 31,149.83 CY | $362.08 | $208.00 | $298.77 | -$4,799,566 |
| 4002-7001 MICROPILING | 240 EA | $9,622.63 | $23,250.00 | $9,622.63 | $3,270,569 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 61 MO | $100,000.00 | $150,000.00 | $11,585.04 | $3,050,000 |
| 6151-7151 CNDT(HDPE)(SDR 11)(1-30" W/10-4")(BORE) | 773 LF | $4,300.00 | $643.82 | $4,300.00 | -$2,826,227 |
| 110-7001 EXCAV (ROADWAY) | 186,501 CY | $30.00 | $15.00 | $11.68 | -$2,797,515 |
| 5100-7003 CONTAMINATED GROUNDWATER REMOVAL | 4,284,030 GAL | $0.0100 | $0.6400 | $0.0100 | $2,698,939 |
| 100-7002 PREPARING ROW | 206.05 STA | $175,000.00 | $162,000.00 | $6,072.92 | -$2,678,650 |
| 341-7056 D-GR HMA TY-D PG76-22 | 13,659 TON | $326.60 | $158.19 | $123.11 | -$2,300,312 |
| 423-7018 RETAINING WALL (SOLDIER PILE) (FASCIA) | 51,443 SF | $0.0100 | $41.00 | $12.88 | $2,108,649 |
| 4006-7001 TEMP CONSTRUCTION ACCESS | 14 LS | $5,266.61 | $150,000.00 | $447,206.31 | $2,026,267 |
| 416-7008 DRILL SHAFT (48 IN) | 15,061 LF | $387.23 | $505.00 | $400.14 | $1,773,734 |
| 512-7089 PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1 | 45,210 LF | $32.34 | $71.25 | $32.87 | $1,759,121 |
| 132-7007 EMBANK (FNL)(OC)(TY C1) | 78,586 CY | $40.00 | $18.00 | $50.95 | -$1,728,892 |
| 462-7022 CONC BOX CULV (8 FT X 5 FT) | 3,996 LF | $1,096.82 | $675.00 | $1,005.26 | -$1,685,593 |
| 450-7028 RAIL (TY T80SS) | 3,987 LF | $103.08 | $483.98 | $108.47 | $1,518,648 |
| 420-7052 CL C CONC (RAIL FOUNDATION) | 6,159 CY | $637.92 | $400.00 | $552.17 | -$1,465,349 |
| 505-7001 TMA (STATIONARY) | 2,345 DAY | $240.96 | $855.28 | $217.57 | $1,440,580 |
| 5111-7003 TUNNEL SHAFT EXCAVATION (ROCK) | 188 VF | $18,199.58 | $10,682.75 | $18,199.58 | -$1,413,164 |
| 422-7003 REINF CONC SLAB (EXTEND SLAB) | 27,803 SF | $81.12 | $32.00 | $27.30 | -$1,365,683 |
Positive: the low bidder was cheaper on that item. These 20 items account for $3,625,588 of the $3,506,193 gap.
AUSTIN BRIDGE & ROAD SERVICES, LP: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $42,200,000.00 | $523,850.32 | 80.56x | $41,676,150 |
| 100-7002 PREPARING ROW | 206.05 STA | $175,000.00 | $6,072.92 | 28.82x | $34,807,425 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 61 MO | $100,000.00 | $11,585.04 | 8.63x | $5,393,312 |
| 110-7001 EXCAV (ROADWAY) | 186,501 CY | $30.00 | $11.68 | 2.57x | $3,416,288 |
| 341-7056 D-GR HMA TY-D PG76-22 | 13,659 TON | $326.60 | $123.11 | 2.65x | $2,779,475 |
| 4006-7001 TEMP CONSTRUCTION ACCESS | 14 LS | $5,266.61 | $447,206.31 | 0.01x | -$6,187,156 |
PULICE CONSTRUCTION, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $41,573,956.70 | $523,850.32 | 79.36x | $41,050,106 |
| 100-7002 PREPARING ROW | 206.05 STA | $162,000.00 | $6,072.92 | 26.68x | $32,128,775 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 61 MO | $150,000.00 | $11,585.04 | 12.95x | $8,443,312 |
| 442-7008 STR STEEL (MISCELLANEOUS BRIDGE) | 413,390 LB | $22.00 | $6.21 | 3.54x | $6,526,064 |
| 4002-7001 MICROPILING | 240 EA | $23,250.00 | $9,622.63 | 2.42x | $3,270,569 |
| 5100-7003 CONTAMINATED GROUNDWATER REMOVAL | 4,284,030 GAL | $0.6400 | $0.0100 | 64.00x | $2,698,939 |
| 4006-7001 TEMP CONSTRUCTION ACCESS | 14 LS | $150,000.00 | $447,206.31 | 0.34x | -$4,160,888 |
| 6151-7151 CNDT(HDPE)(SDR 11)(1-30" W/10-4")(BORE) | 773 LF | $643.82 | $4,300.00 | 0.15x | -$2,826,227 |
| 132-7007 EMBANK (FNL)(OC)(TY C1) | 78,586 CY | $18.00 | $50.95 | 0.35x | -$2,589,086 |
FLUOR ENTERPRISES, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $47,335,333.30 | $523,850.32 | 90.36x | $46,811,483 |
| 100-7002 PREPARING ROW | 206.05 STA | $229,727.41 | $6,072.92 | 37.83x | $46,084,007 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 61 MO | $84,857.31 | $11,585.04 | 7.32x | $4,469,608 |
| 403-7001 TEMPORARY SPL SHORING | 70,152 SF | $87.70 | $25.56 | 3.43x | $4,359,203 |
| 5100-7003 CONTAMINATED GROUNDWATER REMOVAL | 4,284,030 GAL | $0.8200 | $0.0100 | 82.00x | $3,470,064 |
| 105-7020 RMV (20"-24") TRT/UNTRT BASE & ASPH PAV | 229,778 SY | $29.63 | $14.76 | 2.01x | $3,417,350 |
| 110-7001 EXCAV (ROADWAY) | 186,501 CY | $28.32 | $11.68 | 2.42x | $3,102,966 |
| 508-7003 CONSTRUCTING DETOURS (TY1) | 19,413 SY | $233.15 | $101.74 | 2.29x | $2,550,989 |
| 4006-7001 TEMP CONSTRUCTION ACCESS | 14 LS | $198,830.20 | $447,206.31 | 0.44x | -$3,477,266 |
| 6151-7151 CNDT(HDPE)(SDR 11)(1-30" W/10-4")(BORE) | 773 LF | $990.00 | $4,300.00 | 0.23x | -$2,558,630 |
HARPER BROTHERS CONSTRUCTION LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $40,000,000.00 | $523,850.32 | 76.36x | $39,476,150 |
| 100-7002 PREPARING ROW | 206.05 STA | $66,505.00 | $6,072.92 | 10.95x | $12,452,030 |
| 5100-7003 CONTAMINATED GROUNDWATER REMOVAL | 4,284,030 GAL | $1.95 | $0.0100 | 195.00x | $8,311,018 |
| 110-7001 EXCAV (ROADWAY) | 186,501 CY | $40.00 | $11.68 | 3.42x | $5,281,298 |
| 420-7164 CL K CONC (COLUMN ENCASEMENT) | 1,255.3 CY | $5,750.00 | $1,783.53 | 3.22x | $4,979,110 |
| 410-7001 SOIL NAIL ANCHORS | 60,854 LF | $109.39 | $30.07 | 3.64x | $4,827,225 |
| 416-7009 DRILL SHAFT (54 IN) | 6,617 LF | $1,300.00 | $583.44 | 2.23x | $4,741,504 |
| 416-7010 DRILL SHAFT (60 IN) | 6,095 LF | $1,400.00 | $699.76 | 2.00x | $4,267,951 |
| 4002-7001 MICROPILING | 240 EA | $21,900.00 | $9,622.63 | 2.28x | $2,946,569 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 61 MO | $57,870.00 | $11,585.04 | 5.00x | $2,823,382 |
| 4006-7001 TEMP CONSTRUCTION ACCESS | 14 LS | $20,000.00 | $447,206.31 | 0.04x | -$5,980,888 |
| 132-7007 EMBANK (FNL)(OC)(TY C1) | 78,586 CY | $8.00 | $50.95 | 0.16x | -$3,374,946 |
WEBBER, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $46,950,000.00 | $523,850.32 | 89.62x | $46,426,150 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 61 MO | $750,000.00 | $11,585.04 | 64.74x | $45,043,312 |
| 100-7002 PREPARING ROW | 206.05 STA | $206,161.49 | $6,072.92 | 33.95x | $41,228,250 |
| 496-7009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 4 EA | $1,000,000.00 | $28,021.15 | 35.69x | $3,887,915 |
| 416-7009 DRILL SHAFT (54 IN) | 6,617 LF | $1,153.25 | $583.44 | 1.98x | $3,770,459 |
| 4002-7001 MICROPILING | 240 EA | $20,501.00 | $9,622.63 | 2.13x | $2,610,809 |
| 110-7001 EXCAV (ROADWAY) | 186,501 CY | $25.19 | $11.68 | 2.16x | $2,519,218 |
| 4006-7001 TEMP CONSTRUCTION ACCESS | 14 LS | $7,387.68 | $447,206.31 | 0.02x | -$6,157,461 |
| 6151-7151 CNDT(HDPE)(SDR 11)(1-30" W/10-4")(BORE) | 773 LF | $625.00 | $4,300.00 | 0.15x | -$2,840,775 |