2026 ROW Mowing Fisher County
6499-51-001 · let Apr 29, 2026 · Fisher, Abilene · Routine Maintenance Project - Sealed
$270,892Low bid: TEXAS BLACKTOPS LLC+13.3% vs estimate $239,112
$38,522Left on the table14.2% gap to the second bid
2BiddersSpread 14% low to high
3Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS BLACKTOPS LLC | $270,892 | 13.3% | $38,522 | 0 | 0 | |
| 2 | TRIPLE T MAINTENANCE INC. | $309,414 | +14.2% | 29.4% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
TEXAS BLACKTOPS LLC vs TRIPLE T MAINTENANCE INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 730-7022 FULL - WIDTH MOWING | 4,652 AC | $43.00 | $49.00 | $38.53 | $27,912 |
| 730-7020 STRIP MOWING | 1,076 AC | $40.00 | $48.50 | $32.12 | $9,146 |
| 734-7001 LITTER REMOVAL | 1,464 AC | $19.00 | $20.00 | $15.14 | $1,464 |
Positive: the low bidder was cheaper on that item. These 3 items account for $38,522 of the $38,522 gap.