Bid Tab X-ray: 6509-64-001

Oct 13, 2026 · Ector Sign up free
Set your company to personalize scores

6509-64-001 ASPPM

6509-64-001 · let Oct 13, 2026 · Ector, Odessa · Material Maintenance Project

$159,798Low bid: VULCAN CONSTRUCTION MATERIALS, LLC-4.9% vs estimate $168,000
$36,716Left on the table23.0% gap to the second bid
2BiddersSpread 23% low to high
4Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1VULCAN CONSTRUCTION MATERIALS, LLC $159,798-4.9% $36,716 0 0
2HALL BROTHERS, INC. $196,514+23.0%17.0% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

VULCAN CONSTRUCTION MATERIALS, LLC vs HALL BROTHERS, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8012-7040 ASPH CONC PATCH MAT (DEL)(ST1)200 TON $194.63$246.22$158.39 $10,318
8012-7042 ASPH CONC PATCH MAT (DEL)(ST3)200 TON $198.08$248.53$195.54 $10,090
8012-7041 ASPH CONC PATCH MAT (DEL)(ST2)200 TON $203.83$252.49$175.27 $9,732
8012-7043 ASPH CONC PATCH MAT (DEL)(ST4)200 TON $202.45$235.33$197.37 $6,576

Positive: the low bidder was cheaper on that item. These 4 items account for $36,716 of the $36,716 gap.