6509-64-001 ASPPM
6509-64-001 · let Oct 13, 2026 · Ector, Odessa · Material Maintenance Project
$159,798Low bid: VULCAN CONSTRUCTION MATERIALS, LLC-4.9% vs estimate $168,000
$36,716Left on the table23.0% gap to the second bid
2BiddersSpread 23% low to high
4Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | VULCAN CONSTRUCTION MATERIALS, LLC | $159,798 | -4.9% | $36,716 | 0 | 0 | |
| 2 | HALL BROTHERS, INC. | $196,514 | +23.0% | 17.0% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
VULCAN CONSTRUCTION MATERIALS, LLC vs HALL BROTHERS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8012-7040 ASPH CONC PATCH MAT (DEL)(ST1) | 200 TON | $194.63 | $246.22 | $158.39 | $10,318 |
| 8012-7042 ASPH CONC PATCH MAT (DEL)(ST3) | 200 TON | $198.08 | $248.53 | $195.54 | $10,090 |
| 8012-7041 ASPH CONC PATCH MAT (DEL)(ST2) | 200 TON | $203.83 | $252.49 | $175.27 | $9,732 |
| 8012-7043 ASPH CONC PATCH MAT (DEL)(ST4) | 200 TON | $202.45 | $235.33 | $197.37 | $6,576 |
Positive: the low bidder was cheaper on that item. These 4 items account for $36,716 of the $36,716 gap.