Debris Removal (South) FY 2027
6509-70-001 · let Oct 22, 2026 · Harrison, Atlanta · Routine Maintenance Project
$297,000Low bid: HOLMES AND HOLMES CONTRACTING+22.5% vs estimate $242,535
$21,800Left on the table7.3% gap to the second bid
3BiddersSpread 206% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | HOLMES AND HOLMES CONTRACTING | $297,000 | 22.5% | $21,800 | 1+$147,812 | 1-$522,850 | |
| 2 | ADVANCED BARRICADES OF AMERICA, LLC | $318,800 | +7.3% | 31.4% | $589,195 | 1+$162,612 | 1-$515,850 |
| 3 | SWEEPING CORPORATION OF AMERICA, LLC | $907,995 | +205.7% | 274.4% | 1+$744,807 | 1-$508,850 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
HOLMES AND HOLMES CONTRACTING vs ADVANCED BARRICADES OF AMERICA, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 735-7014 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES) | 74 CYC | $4,000.00 | $4,200.00 | $2,002.54 | $14,800 |
| 500-7001 MOBILIZATION | 1 LS | $1,000.00 | $8,000.00 | $523,850.32 | $7,000 |
Positive: the low bidder was cheaper on that item. These 2 items account for $21,800 of the $21,800 gap.