Bid Tab X-ray: 6501-52-001

Oct 14, 2026 · Ellis Sign up free
Set your company to personalize scores

Tree Trimming and Brush Removal 09 10/26

6501-52-001 · let Oct 14, 2026 · Ellis, Dallas · Routine Maintenance Project - Sealed

$160,931Low bid: GV LANDSCAPE AND CONSTRUCTION LLC-7.0% vs estimate $172,975
-$2,217Left on the table-1.4% gap to the second bid
8BiddersSpread 121% low to high
14Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1GV LANDSCAPE AND CONSTRUCTION LLC $160,931-7.0% -$2,217 1+$4,205 2-$534,020
2VM WEST, LLC $158,714+-1.4%-8.2% $5,655 0 1-$517,722
3WESTERN CERTIFIED ARBORISTS $164,369+2.1%-5.0% $3,839 1+$19,803 2-$539,020
4JACKSON EXCAVATION, LLC $168,208+4.5%-2.8% $13,797 0 3-$553,058
5LOOKS GREAT SERVICES OF MS, INC. $182,005+13.1%5.2% $84,571 3+$10,443 2-$542,520
6S FOWLER SERVICES LLC $266,575+65.6%54.1% $9,715
7MARLANE CONSTRUCTION, LLC $276,290+71.7%59.7% $74,987
8ABESCAPE LANDSCAPING, LLC $351,277+118.3%103.1%

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

GV LANDSCAPE AND CONSTRUCTION LLC vs VM WEST, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING2 MO $1,500.00$7,419.64$11,585.04 $11,839
752-7001 TREE TRIMMING / BRUSH REMOVAL36.03 MI $1,700.00$1,561.58$1,716.86 -$4,987
500-7001 MOBILIZATION1 LS $10,000.00$6,128.32$523,850.32 -$3,872
752-7005 TREE REMOVAL (4" - 12" DIA)71 EA $120.00$71.98$60.77 -$3,409
752-7012 TREE REMOVAL (48" - 60" DIA)3 EA $1,000.00$515.82$450.06 -$1,453
752-7013 TREE REMOVAL (60" - 72" DIA)1 EA $1,700.00$517.44$529.99 -$1,183
752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS)34 AC $1,700.00$1,726.32$1,602.83 $895
505-7001 TMA (STATIONARY)34 DAY $150.00$174.66$217.57 $838
752-7011 TREE REMOVAL (42" - 48" DIA)2 EA $800.00$475.63$436.67 -$649
752-7006 TREE REMOVAL (12" - 18" DIA)24 EA $160.00$152.99$100.44 -$168
752-7010 TREE REMOVAL (36" - 42" DIA)2 EA $500.00$425.53$334.81 -$149
752-7009 TREE REMOVAL (30" - 36" DIA)2 EA $340.00$381.91$293.05 $84
752-7007 TREE REMOVAL (18" - 24" DIA)12 EA $200.00$193.81$141.37 -$74
752-7008 TREE REMOVAL (24" - 30" DIA)4 EA $260.00$277.63$208.61 $71

Positive: the low bidder was cheaper on that item. These 14 items account for -$2,217 of the -$2,217 gap.

GV LANDSCAPE AND CONSTRUCTION LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
752-7005 TREE REMOVAL (4" - 12" DIA)71 EA $120.00$60.771.97x$4,205
500-7001 MOBILIZATION1 LS $10,000.00$523,850.320.02x-$513,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING2 MO $1,500.00$11,585.040.13x-$20,170

VM WEST, LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $6,128.32$523,850.320.01x-$517,722

WESTERN CERTIFIED ARBORISTS: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
505-7001 TMA (STATIONARY)34 DAY $800.00$217.573.68x$19,803
500-7001 MOBILIZATION1 LS $1,000.00$523,850.320.00x-$522,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING2 MO $3,500.00$11,585.040.30x-$16,170

JACKSON EXCAVATION, LLC: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $1,000.00$523,850.320.00x-$522,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING2 MO $10.00$11,585.040.00x-$23,150
505-7001 TMA (STATIONARY)34 DAY $10.00$217.570.05x-$7,057

LOOKS GREAT SERVICES OF MS, INC.: unbalanced items

Placed 5
ItemQtyTheir priceMarketx market$ vs market
752-7007 TREE REMOVAL (18" - 24" DIA)12 EA $450.00$141.373.18x$3,704
752-7006 TREE REMOVAL (12" - 18" DIA)24 EA $250.00$100.442.49x$3,589
752-7012 TREE REMOVAL (48" - 60" DIA)3 EA $1,500.00$450.063.33x$3,150
500-7001 MOBILIZATION1 LS $500.00$523,850.320.00x-$523,350
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING2 MO $2,000.00$11,585.040.17x-$19,170