Bid Tab X-ray: 6509-69-001

Oct 22, 2026 · Bowie Sign up free
Set your company to personalize scores

Debris Removal (North) FY 2027

6509-69-001 · let Oct 22, 2026 · Bowie, Atlanta · Routine Maintenance Project

$204,500Low bid: HOLMES AND HOLMES CONTRACTING-8.6% vs estimate $223,850
$98,500Left on the table48.2% gap to the second bid
3BiddersSpread 223% low to high
2Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1HOLMES AND HOLMES CONTRACTING $204,500-8.6% $98,500 0 1-$522,850
2ADVANCED BARRICADES OF AMERICA, LLC $303,000+48.2%35.4% $358,464 1+$147,812 1-$516,850
3SWEEPING CORPORATION OF AMERICA, LLC $661,464+223.5%195.5% 1+$498,276 1-$508,850

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.

Where the job was won

HOLMES AND HOLMES CONTRACTING vs ADVANCED BARRICADES OF AMERICA, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
735-7014 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)74 CYC $2,750.00$4,000.00$2,002.54 $92,500
500-7001 MOBILIZATION1 LS $1,000.00$7,000.00$523,850.32 $6,000

Positive: the low bidder was cheaper on that item. These 2 items account for $98,500 of the $98,500 gap.

HOLMES AND HOLMES CONTRACTING: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $1,000.00$523,850.320.00x-$522,850

ADVANCED BARRICADES OF AMERICA, LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
735-7014 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)74 CYC $4,000.00$2,002.542.00x$147,812
500-7001 MOBILIZATION1 LS $7,000.00$523,850.320.01x-$516,850

SWEEPING CORPORATION OF AMERICA, LLC: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
735-7014 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)74 CYC $8,736.00$2,002.544.36x$498,276
500-7001 MOBILIZATION1 LS $15,000.00$523,850.320.03x-$508,850