MISC. BRIDGE REPAIR (BPM 2027)

6503-72-001 · let Oct 7, 2026 · Lampasas, Brownwood · Bridge Preventative Maintenance

$719,494Low bid: TAYLOR BRIDGE LLC-20.2% vs estimate $902,155
$170,395Left on the table23.7% gap to the second bid
9BiddersSpread 98% low to high
28Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TAYLOR BRIDGE LLC $719,494-20.2% $170,395 6+$116,174 5-$624,854
2THE TRUESDELL CORPORATION $889,889+23.7%-1.4% $47,909 10+$216,558 6-$500,539
3MPB, INC. $937,798+30.3%4.0% $16,515 5+$185,127 4-$527,593
4SCOTT TUCKER CONSTRUCTION COMPANY, LLC $954,313+32.6%5.8% $40,441 7+$151,529 4-$465,545
5STRUCTURAL INTEGRITY GROUP LLC $994,754+38.3%10.3% $18,745 6+$220,248 6-$533,767
6ICOS MANAGEMENT, LLC $1,013,499+40.9%12.3% $65,201
7ROAD DOCTORS LLC $1,078,700+49.9%19.6% $149,320
8BLACKSMITH VENTURES LLC $1,228,020+70.7%36.1% $198,586
9THK CONSTRUCTION LLC $1,426,606+98.3%58.1%

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

TAYLOR BRIDGE LLC vs THE TRUESDELL CORPORATION, biggest item swings
ItemQtyLow2ndMarket2nd minus low
500-7001 MOBILIZATION1 LS $30,000.00$168,564.00$523,850.32 $138,564
429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)97 SF $750.00$155.00$150.68 -$57,715
401-7001 FLOWABLE BACKFILL217 CY $325.00$550.00$298.77 $48,825
432-7043 RIPRAP (STONE PROTECTION)(18 IN)810 CY $200.00$155.00$184.74 -$36,450
432-7048 RIPRAP (STONE PROTECTION)(36 IN)314 CY $300.00$188.00$174.48 -$35,168
776-7024 REPLACE(STEEL RAIL)25 LF $100.00$1,250.00$193.52 $28,750
787-7001 REPLACING ELASTOMERIC BEARING PADS10 EA $5,500.00$8,000.00$2,783.49 $25,000
110-7002 EXCAV (CHANNEL)243 CY $25.00$110.00$16.69 $20,655
752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS)5.1 AC $1,000.00$4,000.00$1,602.83 $15,300
785-7002 BRIDGE JOINT REPAIR (HEADER)43 LF $200.00$500.00$199.12 $12,900
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING6 MO $1.00$2,000.00$11,585.04 $11,994
780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT)23 LF $575.00$150.00$76.83 -$9,775
735-7060 DRIFTWOOD REMOVAL739 CY $100.00$90.00$72.46 -$7,390
752-7007 TREE REMOVAL (18" - 24" DIA)8 EA $500.00$1,350.00$141.37 $6,800
420-7067 CL C CONC (MISC)10 CY $1,000.00$1,600.00$1,569.38 $6,000
506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")6,500 LF $1.00$0.1000$5.23 -$5,850
432-7045 RIPRAP (STONE PROTECTION)(24 IN)100 CY $275.00$225.00$190.61 -$5,000
403-7001 TEMPORARY SPL SHORING135 SF $1.00$35.00$25.56 $4,590
480-7002 CLEAN EXIST CULVERTS90 CY $100.00$150.00$42.86 $4,500
432-7003 RIPRAP (CONC)(6 IN)35 CY $650.00$750.00$580.25 $3,500

Positive: the low bidder was cheaper on that item. These 20 items account for $170,030 of the $170,395 gap.

TAYLOR BRIDGE LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)97 SF $750.00$150.684.98x$58,134
787-7001 REPLACING ELASTOMERIC BEARING PADS10 EA $5,500.00$2,783.491.98x$27,165
780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT)23 LF $575.00$76.837.48x$11,458
438-7004 CLEANING AND SEALING EXIST JOINTS (CL3)278 LF $50.00$19.192.61x$8,564
752-7005 TREE REMOVAL (4" - 12" DIA)13 EA $500.00$60.778.23x$5,710
480-7002 CLEAN EXIST CULVERTS90 CY $100.00$42.862.33x$5,143
500-7001 MOBILIZATION1 LS $30,000.00$523,850.320.06x-$493,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING6 MO $1.00$11,585.040.00x-$69,504
506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")6,500 LF $1.00$5.230.19x-$27,474
505-7001 TMA (STATIONARY)120 DAY $1.00$217.570.00x-$25,989
506-7046 BIODEG EROSN CONT LOGS (REMOVE)6,500 LF $0.0500$1.290.04x-$8,037

THE TRUESDELL CORPORATION: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
401-7001 FLOWABLE BACKFILL217 CY $550.00$298.771.84x$54,518
787-7001 REPLACING ELASTOMERIC BEARING PADS10 EA $8,000.00$2,783.492.87x$52,165
776-7024 REPLACE(STEEL RAIL)25 LF $1,250.00$193.526.46x$26,412
110-7002 EXCAV (CHANNEL)243 CY $110.00$16.696.59x$22,673
785-7002 BRIDGE JOINT REPAIR (HEADER)43 LF $500.00$199.122.51x$12,938
752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS)5.1 AC $4,000.00$1,602.832.50x$12,226
438-7004 CLEANING AND SEALING EXIST JOINTS (CL3)278 LF $55.00$19.192.87x$9,954
752-7007 TREE REMOVAL (18" - 24" DIA)8 EA $1,350.00$141.379.55x$9,669
480-7002 CLEAN EXIST CULVERTS90 CY $150.00$42.863.50x$9,643
752-7005 TREE REMOVAL (4" - 12" DIA)13 EA $550.00$60.779.05x$6,360
500-7001 MOBILIZATION1 LS $168,564.00$523,850.320.32x-$355,286
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING6 MO $2,000.00$11,585.040.17x-$57,510
506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")6,500 LF $0.1000$5.230.02x-$33,324
505-7001 TMA (STATIONARY)120 DAY $1.00$217.570.00x-$25,989
420-7064 CL C CONC (COLUMN ENCASEMENT)20 CY $900.00$1,935.900.46x-$20,718
506-7046 BIODEG EROSN CONT LOGS (REMOVE)6,500 LF $0.1000$1.290.08x-$7,712

MPB, INC.: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
432-7048 RIPRAP (STONE PROTECTION)(36 IN)314 CY $485.79$174.482.78x$97,751
787-7001 REPLACING ELASTOMERIC BEARING PADS10 EA $6,825.00$2,783.492.45x$40,415
438-7004 CLEANING AND SEALING EXIST JOINTS (CL3)278 LF $106.84$19.195.57x$24,366
432-7045 RIPRAP (STONE PROTECTION)(24 IN)100 CY $353.30$190.611.85x$16,269
480-7002 CLEAN EXIST CULVERTS90 CY $113.14$42.862.64x$6,325
500-7001 MOBILIZATION1 LS $114,550.60$523,850.320.22x-$409,300
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING6 MO $625.00$11,585.040.05x-$65,760
420-7064 CL C CONC (COLUMN ENCASEMENT)20 CY $608.67$1,935.900.31x-$26,545
505-7001 TMA (STATIONARY)120 DAY $1.00$217.570.00x-$25,989

SCOTT TUCKER CONSTRUCTION COMPANY, LLC: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
787-7001 REPLACING ELASTOMERIC BEARING PADS10 EA $8,278.00$2,783.492.97x$54,945
735-7060 DRIFTWOOD REMOVAL739 CY $137.00$72.461.89x$47,696
110-7002 EXCAV (CHANNEL)243 CY $97.00$16.695.81x$19,514
438-7004 CLEANING AND SEALING EXIST JOINTS (CL3)278 LF $54.00$19.192.81x$9,676
480-7002 CLEAN EXIST CULVERTS90 CY $133.00$42.863.10x$8,113
752-7007 TREE REMOVAL (18" - 24" DIA)8 EA $931.00$141.376.59x$6,317
752-7005 TREE REMOVAL (4" - 12" DIA)13 EA $466.00$60.777.67x$5,268
500-7001 MOBILIZATION1 LS $95,000.00$523,850.320.18x-$428,850
506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")6,500 LF $1.50$5.230.29x-$24,224
752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS)5.1 AC $160.00$1,602.830.10x-$7,358
506-7046 BIODEG EROSN CONT LOGS (REMOVE)6,500 LF $0.5000$1.290.39x-$5,112

STRUCTURAL INTEGRITY GROUP LLC: unbalanced items

Placed 5
ItemQtyTheir priceMarketx market$ vs market
735-7060 DRIFTWOOD REMOVAL739 CY $240.00$72.463.31x$123,813
787-7001 REPLACING ELASTOMERIC BEARING PADS10 EA $6,500.00$2,783.492.34x$37,165
110-7002 EXCAV (CHANNEL)243 CY $125.00$16.697.49x$26,318
480-7002 CLEAN EXIST CULVERTS90 CY $197.00$42.864.60x$13,873
752-7005 TREE REMOVAL (4" - 12" DIA)13 EA $1,000.00$60.7716.45x$12,210
752-7007 TREE REMOVAL (18" - 24" DIA)8 EA $1,000.00$141.377.07x$6,869
500-7001 MOBILIZATION1 LS $103,000.00$523,850.320.20x-$420,850
420-7064 CL C CONC (COLUMN ENCASEMENT)20 CY $50.00$1,935.900.03x-$37,718
506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")6,500 LF $0.1000$5.230.02x-$33,324
505-7001 TMA (STATIONARY)120 DAY $1.00$217.570.00x-$25,989
752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS)5.1 AC $0.1000$1,602.830.00x-$8,174
506-7046 BIODEG EROSN CONT LOGS (REMOVE)6,500 LF $0.1000$1.290.08x-$7,712