UA 90 SEAL COAT 2711
0027-03-077 · let Nov 4, 2026 · Colorado, Yoakum · Seal Coat
$17,597,090Low bid: RONALD R. WAGNER & CO., LP+3.1% vs estimate $17,072,172
$20,400Left on the table0.1% gap to the second bid
4BiddersSpread 13% low to high
615Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | RONALD R. WAGNER & CO., LP | $17,597,090 | 3.1% | $20,400 | 1+$1,945,756 | 0 | |
| 2 | CLARK CONSTRUCTION OF TEXAS, INC. | $17,617,490 | +0.1% | 3.2% | $1,600,884 | 1+$943,150 | 0 |
| 3 | CK NEWBERRY, LLC | $19,218,375 | +9.2% | 12.6% | $719,447 | 1+$1,226,150 | 0 |
| 4 | HAYDEN PAVING, INC. | $19,937,821 | +13.3% | 16.8% | 2+$2,978,224 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
RONALD R. WAGNER & CO., LP vs CLARK CONSTRUCTION OF TEXAS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $2,469,606.44 | $1,467,000.00 | $523,850.32 | -$1,002,606 |
| 316-7229 AGGR (TY-PE, GR-3)(SAC-B) | 45,307 CY | $97.18 | $112.60 | $100.41 | $698,634 |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 15,838 CY | $96.43 | $115.60 | $111.76 | $303,614 |
| 316-7265 ASPH(AC-20-5TR, AC-20-XP OR SPG 79-13) | 2,877,034 GAL | $2.74 | $2.66 | $2.63 | -$235,917 |
| 666-7533 RE PM TY II (W)6"(SLD)(020 MIL) | 3,507,143 LF | $0.1500 | $0.1800 | $0.1704 | $105,214 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $0.0100 | $10,000.00 | $11,585.04 | $50,000 |
| 666-7537 RE PM TY II (Y)6"(SLD)(020 MIL) | 1,884,596 LF | $0.1600 | $0.1800 | $0.1711 | $37,692 |
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 7,599 LF | $10.00 | $12.00 | $13.72 | $15,198 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $0.0100 | $7,500.00 | $9,253.78 | $15,000 |
| 668-7088 PREFAB PM TY C (W)(18")(SLD) | 3,808 LF | $9.00 | $11.00 | $14.51 | $7,616 |
| 668-7110 PREFAB PM TY C (W)(18")(YLD TRI) | 587 EA | $9.00 | $20.00 | $25.92 | $6,457 |
| 672-7008 TRAFFIC BUTTON TY Y | 2,918 EA | $0.4000 | $2.50 | $2.19 | $6,128 |
| 666-7535 RE PM TY II (Y)6"(BRK)(020 MIL) | 289,252 LF | $0.1600 | $0.1800 | $0.1833 | $5,785 |
| 668-7108 PREFAB PM TY C (W)(RR XING) | 22 EA | $400.00 | $650.00 | $602.94 | $5,500 |
| 666-7179 RE PM TY II (W) 8" (SLD) | 45,587 LF | $0.3000 | $0.2200 | $0.4127 | -$3,647 |
| 668-7127 PREFAB PM TY C (Y)(24")(SLD) | 2,393 LF | $11.00 | $12.00 | $11.82 | $2,393 |
| 668-7087 PREFAB PM TY C (W)(12")(SLD) | 1,269 LF | $8.00 | $9.00 | $8.49 | $1,269 |
| 666-7210 RE PM TY II (Y) 4" (SLD) | 1,430 LF | $0.1500 | $1.00 | $0.1822 | $1,216 |
| 666-7531 RE PM TY II (W)6"(BRK)(020 MIL) | 98,441 LF | $0.1600 | $0.1700 | $0.1864 | $984 |
| 668-7091 PREFAB PM TY C (W)(ARROW) | 94 EA | $200.00 | $190.00 | $201.69 | -$940 |
Positive: the low bidder was cheaper on that item. These 20 items account for $19,590 of the $20,400 gap.
RONALD R. WAGNER & CO., LP: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $2,469,606.44 | $523,850.32 | 4.71x | $1,945,756 |
CLARK CONSTRUCTION OF TEXAS, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,467,000.00 | $523,850.32 | 2.80x | $943,150 |
CK NEWBERRY, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,750,000.00 | $523,850.32 | 3.34x | $1,226,150 |