Bid Tab X-ray: 6508-71-001

Oct 14, 2026 · Palo Pinto Sign up free
Set your company to personalize scores

FY '27 Palo Pinto MMC Flexible Base

6508-71-001 · let Oct 14, 2026 · Palo Pinto, Fort Worth · Material Maintenance Project

$101,350Low bid: GREEN DREAM INTERNATIONAL LLC-35.3% vs estimate $156,750
$18,875Left on the table18.6% gap to the second bid
4BiddersSpread 41% low to high
3Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1GREEN DREAM INTERNATIONAL LLC $101,350-35.3% $18,875 0 0
2TRADERS INN LLC $120,225+18.6%-23.3% $16,025 0 0
3TOUCHSTONE RESOURCES, LLC $136,250+34.4%-13.1% $6,250 0 0
4NORTHEASTERN PAVERS, LLC $142,500+40.6%-9.1% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

GREEN DREAM INTERNATIONAL LLC vs TRADERS INN LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8010-7059 FL BS(TY A GR 3)(DEL)(ST1)1,250 TON $25.88$32.06$28.96 $7,725
8010-7060 FL BS(TY A GR 3)(DEL)(ST2)1,250 TON $26.45$32.06$28.57 $7,013
8010-7061 FL BS(TY A GR 3)(DEL)(ST3)1,250 TON $28.75$32.06$30.58 $4,138

Positive: the low bidder was cheaper on that item. These 3 items account for $18,875 of the $18,875 gap.