Bid Tab X-ray: 6508-81-001

Oct 14, 2026 · Palo Pinto Sign up free
Set your company to personalize scores

FY '27 Palo Pinto MMC Hydraulic Cement

6508-81-001 · let Oct 14, 2026 · Palo Pinto, Fort Worth · Material Maintenance Project

$390,000Low bid: TOUCHSTONE RESOURCES, LLC-16.1% vs estimate $465,000
$31,350Left on the table8.0% gap to the second bid
5BiddersSpread 46% low to high
3Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TOUCHSTONE RESOURCES, LLC $390,000-16.1% $31,350 0 0
2SOUTHERN SOURCING SOLUTIONS, LLC $421,350+8.0%-9.4% $36,150 0 0
3FALCON CONSTRUCTION SUPPLIES LLC $457,500+17.3%-1.6% $21,000 0 0
4TRADERS INN LLC $478,500+22.7%2.9% $91,500 0 0
5AKA-MATERIALS $570,000+46.2%22.6% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.

Where the job was won

TOUCHSTONE RESOURCES, LLC vs SOUTHERN SOURCING SOLUTIONS, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8009-7073 HYDRAULIC CEMENT(TY II)(DEL)(ST 1)500 TON $260.00$280.90$289.29 $10,450
8009-7074 HYDRAULIC CEMENT(TY II)(DEL)(ST 2)500 TON $260.00$280.90$285.00 $10,450
8009-7075 HYDRAULIC CEMENT(TY II)(DEL)(ST 3)500 TON $260.00$280.90$260.00 $10,450

Positive: the low bidder was cheaper on that item. These 3 items account for $31,350 of the $31,350 gap.