SH 114 at Alliance Blvd
0353-01-031 · let Nov 4, 2026 · Wise, Fort Worth · Intersection & Operational Imprv
$482,224Low bid: XIT PAVING AND CONSTRUCTION INC.-22.3% vs estimate $620,363
$101,735Left on the table21.1% gap to the second bid
7BiddersSpread 60% low to high
45Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | XIT PAVING AND CONSTRUCTION INC. | $482,224 | -22.3% | $101,735 | 8+$105,669 | 3-$572,418 | |
| 2 | ED BELL CONSTRUCTION COMPANY | $583,959 | +21.1% | -5.9% | $10,697 | 8+$171,942 | 5-$540,205 |
| 3 | O. TREVINO CONSTRUCTION, LLC | $594,655 | +23.3% | -4.1% | $13,321 | 12+$167,164 | 1-$468,850 |
| 4 | JAY MILLS CONTRACTING, INCORPORATED | $607,976 | +26.1% | -2.0% | $41,084 | 8+$146,550 | 2-$510,298 |
| 5 | SILVER CREEK CONSTRUCTION, INC. | $649,060 | +34.6% | 4.6% | $52,886 | 13+$269,073 | 2-$512,298 |
| 6 | JAGOE-PUBLIC COMPANY | $701,946 | +45.6% | 13.2% | $69,465 | ||
| 7 | OVERLAND CORPORATION | $771,411 | +60.0% | 24.3% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
XIT PAVING AND CONSTRUCTION INC. vs ED BELL CONSTRUCTION COMPANY, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $4,945.00 | $31,500.00 | $11,585.04 | $79,665 |
| 500-7001 MOBILIZATION | 1 LS | $23,000.00 | $57,500.00 | $523,850.32 | $34,500 |
| 164-7017 HYDRO MULCH SEED (PERM_RURAL_SANDY) | 3,612 SY | $0.7500 | $6.30 | $0.5289 | $20,047 |
| 360-7005 CONC PVMT (CRCP) (11") | 960 SY | $130.00 | $150.00 | $94.72 | $19,200 |
| 464-7034 RC PIPE (CL V)(24 IN) | 191 LF | $183.00 | $85.00 | $156.72 | -$18,718 |
| 168-7001 VEGETATIVE WATERING | 127 TGL | $130.00 | $10.00 | $8.43 | -$15,240 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 176 DAY | $100.00 | $25.00 | $87.82 | -$13,200 |
| 505-7001 TMA (STATIONARY) | 92 DAY | $140.00 | $1.00 | $217.57 | -$12,788 |
| 100-7002 PREPARING ROW | 13 STA | $2,100.00 | $3,000.00 | $6,072.92 | $11,700 |
| 110-7001 EXCAV (ROADWAY) | 455 CY | $30.00 | $5.25 | $11.68 | -$11,261 |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 1,260 CY | $35.00 | $42.00 | $12.93 | $8,820 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 1,300 LF | $6.00 | $0.0100 | $0.2040 | -$7,787 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,470 SY | $14.00 | $10.00 | $3.93 | -$5,880 |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 286 TON | $200.00 | $220.00 | $109.80 | $5,720 |
| 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) | 3 EA | $2,386.00 | $3,500.00 | $1,883.43 | $3,342 |
| 760-7001 DITCH CLEANING AND RESHAPING (FOOT) | 400 LF | $10.00 | $18.00 | $1.96 | $3,200 |
| 506-7041 TEMP SEDMT CONT FENCE (REMOVE) | 2,060 LF | $0.5000 | $1.82 | $1.02 | $2,719 |
| 464-7032 RC PIPE (CL V)(18 IN) | 25 LF | $180.00 | $80.00 | $105.53 | -$2,500 |
| 310-7013 PRIME COAT(MC-30 OR AE-P) | 184 GAL | $6.00 | $18.00 | $4.73 | $2,208 |
| 360-7047 CONC PVMT (CRCP)(HES) (8") | 17 SY | $200.00 | $300.00 | $123.34 | $1,700 |
Positive: the low bidder was cheaper on that item. These 20 items account for $105,447 of the $101,735 gap.
XIT PAVING AND CONSTRUCTION INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 132-7004 EMBANK (FNL)(DC)(TY B) | 1,260 CY | $35.00 | $12.93 | 2.71x | $27,813 |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 286 TON | $200.00 | $109.80 | 1.82x | $25,798 |
| 168-7001 VEGETATIVE WATERING | 127 TGL | $130.00 | $8.43 | 15.41x | $15,439 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,470 SY | $14.00 | $3.93 | 3.57x | $14,810 |
| 110-7001 EXCAV (ROADWAY) | 455 CY | $30.00 | $11.68 | 2.57x | $8,335 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 1,300 LF | $6.00 | $0.2040 | 29.41x | $7,535 |
| 760-7001 DITCH CLEANING AND RESHAPING (FOOT) | 400 LF | $10.00 | $1.96 | 5.11x | $3,217 |
| 666-7239 RE PM TY III (W)(8")(SLD) | 1,400 LF | $3.00 | $1.06 | 2.84x | $2,722 |
| 500-7001 MOBILIZATION | 1 LS | $23,000.00 | $523,850.32 | 0.04x | -$500,850 |
| 100-7002 PREPARING ROW | 13 STA | $2,100.00 | $6,072.92 | 0.35x | -$51,648 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $4,945.00 | $11,585.04 | 0.43x | -$19,920 |
ED BELL CONSTRUCTION COMPANY: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $31,500.00 | $11,585.04 | 2.72x | $59,745 |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 1,260 CY | $42.00 | $12.93 | 3.25x | $36,633 |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 286 TON | $220.00 | $109.80 | 2.00x | $31,518 |
| 164-7017 HYDRO MULCH SEED (PERM_RURAL_SANDY) | 3,612 SY | $6.30 | $0.5289 | 11.91x | $20,845 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,470 SY | $10.00 | $3.93 | 2.55x | $8,930 |
| 760-7001 DITCH CLEANING AND RESHAPING (FOOT) | 400 LF | $18.00 | $1.96 | 9.20x | $6,417 |
| 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) | 3 EA | $3,500.00 | $1,883.43 | 1.86x | $4,850 |
| 360-7047 CONC PVMT (CRCP)(HES) (8") | 17 SY | $300.00 | $123.34 | 2.43x | $3,003 |
| 500-7001 MOBILIZATION | 1 LS | $57,500.00 | $523,850.32 | 0.11x | -$466,350 |
| 100-7002 PREPARING ROW | 13 STA | $3,000.00 | $6,072.92 | 0.49x | -$39,948 |
| 505-7001 TMA (STATIONARY) | 92 DAY | $1.00 | $217.57 | 0.00x | -$19,925 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 176 DAY | $25.00 | $87.82 | 0.28x | -$11,056 |
| 110-7001 EXCAV (ROADWAY) | 455 CY | $5.25 | $11.68 | 0.45x | -$2,927 |
O. TREVINO CONSTRUCTION, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 132-7004 EMBANK (FNL)(DC)(TY B) | 1,260 CY | $50.00 | $12.93 | 3.87x | $46,713 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,470 SY | $26.50 | $3.93 | 6.75x | $33,185 |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 286 TON | $205.00 | $109.80 | 1.87x | $27,228 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 176 DAY | $159.00 | $87.82 | 1.81x | $12,528 |
| 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) | 3 EA | $5,000.00 | $1,883.43 | 2.65x | $9,350 |
| 110-7001 EXCAV (ROADWAY) | 455 CY | $32.00 | $11.68 | 2.74x | $9,245 |
| 360-7047 CONC PVMT (CRCP)(HES) (8") | 17 SY | $525.00 | $123.34 | 4.26x | $6,828 |
| 400-7006 CUT & RESTORING PAV | 17 SY | $525.00 | $171.81 | 3.06x | $6,004 |
| 168-7001 VEGETATIVE WATERING | 127 TGL | $44.00 | $8.43 | 5.22x | $4,517 |
| 464-7032 RC PIPE (CL V)(18 IN) | 25 LF | $265.00 | $105.53 | 2.51x | $3,987 |
| 500-7001 MOBILIZATION | 1 LS | $55,000.00 | $523,850.32 | 0.10x | -$468,850 |
JAY MILLS CONTRACTING, INCORPORATED: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 132-7004 EMBANK (FNL)(DC)(TY B) | 1,260 CY | $45.00 | $12.93 | 3.48x | $40,413 |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 286 TON | $250.00 | $109.80 | 2.28x | $40,098 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $21,000.00 | $11,585.04 | 1.81x | $28,245 |
| 110-7001 EXCAV (ROADWAY) | 455 CY | $40.00 | $11.68 | 3.42x | $12,885 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,470 SY | $10.00 | $3.93 | 2.55x | $8,930 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 1,300 LF | $6.45 | $0.2040 | 31.62x | $8,120 |
| 760-7001 DITCH CLEANING AND RESHAPING (FOOT) | 400 LF | $12.00 | $1.96 | 6.13x | $4,017 |
| 666-7239 RE PM TY III (W)(8")(SLD) | 1,400 LF | $3.80 | $1.06 | 3.60x | $3,842 |
| 500-7001 MOBILIZATION | 1 LS | $60,000.00 | $523,850.32 | 0.11x | -$463,850 |
| 100-7002 PREPARING ROW | 13 STA | $2,500.00 | $6,072.92 | 0.41x | -$46,448 |
SILVER CREEK CONSTRUCTION, INC.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 360-7005 CONC PVMT (CRCP) (11") | 960 SY | $175.00 | $94.72 | 1.85x | $77,073 |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 1,260 CY | $50.00 | $12.93 | 3.87x | $46,713 |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 286 TON | $230.00 | $109.80 | 2.09x | $34,378 |
| 260-7020 LIME TRT (SUBGRADE) (8") | 1,470 SY | $25.00 | $3.93 | 6.37x | $30,980 |
| 505-7001 TMA (STATIONARY) | 92 DAY | $400.00 | $217.57 | 1.84x | $16,783 |
| 360-7047 CONC PVMT (CRCP)(HES) (8") | 17 SY | $1,000.00 | $123.34 | 8.11x | $14,903 |
| 110-7001 EXCAV (ROADWAY) | 455 CY | $40.00 | $11.68 | 3.42x | $12,885 |
| 168-7001 VEGETATIVE WATERING | 127 TGL | $100.00 | $8.43 | 11.86x | $11,629 |
| 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) | 3 EA | $3,750.00 | $1,883.43 | 1.99x | $5,600 |
| 310-7013 PRIME COAT(MC-30 OR AE-P) | 184 GAL | $35.00 | $4.73 | 7.40x | $5,569 |
| 500-7001 MOBILIZATION | 1 LS | $64,500.00 | $523,850.32 | 0.12x | -$459,350 |
| 100-7002 PREPARING ROW | 13 STA | $2,000.00 | $6,072.92 | 0.33x | -$52,948 |