Bid Tab X-ray: 6497-65-001

May 12, 2026 · Culberson Sign up free
Set your company to personalize scores

Mowing Highway Right of Way - Van Horn

6497-65-001 · let May 12, 2026 · Culberson, El Paso · Routine Maintenance Project

$188,044Low bid: L&L COMPANY-3.4% vs estimate $194,620
$11,709Left on the table6.2% gap to the second bid
2BiddersSpread 6% low to high
2Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1L&L COMPANY $188,044-3.4% $11,709 0 1-$44,097
2GROUNDCOVER HOLDINGS, LLC $199,753+6.2%2.6% 0 1-$44,097

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

L&L COMPANY vs GROUNDCOVER HOLDINGS, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
730-7022 FULL - WIDTH MOWING3,903 AC $48.00$51.00$38.53 $11,709
505-7002 TMA (MOBILE OPERATION)700 HR $1.00$1.00$64.00 $0

Positive: the low bidder was cheaper on that item. These 2 items account for $11,709 of the $11,709 gap.

L&L COMPANY: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
505-7002 TMA (MOBILE OPERATION)700 HR $1.00$64.000.02x-$44,097

GROUNDCOVER HOLDINGS, LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
505-7002 TMA (MOBILE OPERATION)700 HR $1.00$64.000.02x-$44,097