Pavement Repair and Markings 05.26
6489-38-001 · let May 13, 2026 · Collin, Dallas · Routine Maintenance Project - Sealed
$236,151Low bid: PEACHTREE CONSTRUCTION, LTD.+19.6% vs estimate $197,454
—Left on the tableOnly one bidder
1Bidders
29Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | PEACHTREE CONSTRUCTION, LTD. | $236,151 | 19.6% | 7+$110,912 | 4-$698,887 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 1 bidders.
PEACHTREE CONSTRUCTION, LTD.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 289 TON | $296.00 | $130.31 | 2.27x | $47,883 |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 2,382 SY | $15.50 | $1.62 | 9.58x | $33,069 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 5,903 LF | $2.00 | $0.2040 | 9.80x | $10,602 |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 15,776 LF | $0.9500 | $0.4986 | 1.91x | $7,121 |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 8,820 LF | $1.00 | $0.4757 | 2.10x | $4,624 |
| 666-7347 PAVEMENT SLER 6" | 24,596 LF | $0.3500 | $0.1841 | 1.90x | $4,080 |
| 677-7002 ELIM EXT PM & MRKS (6") | 7,444 LF | $0.7500 | $0.2755 | 2.72x | $3,532 |
| 500-7001 MOBILIZATION | 1 LS | $20,000.00 | $523,850.32 | 0.04x | -$503,850 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 20 EA | $200.00 | $9,253.78 | 0.02x | -$181,076 |
| 505-7003 TMA (MOBILE OPERATION) | 40 DAY | $25.00 | $229.60 | 0.11x | -$8,184 |
| 505-7001 TMA (STATIONARY) | 30 DAY | $25.00 | $217.57 | 0.11x | -$5,777 |