IH 30: Weigh Station - Titus County
0610-03-095 · let May 7, 2026 · Titus, Atlanta · Freeway Operational Improvements
$9,498,729Low bid: EAST TEXAS BRIDGE, INC.-16.0% vs estimate $11,312,219
$1,054,697Left on the table11.1% gap to the second bid
6BiddersSpread 30% low to high
138Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | EAST TEXAS BRIDGE, INC. | $9,498,729 | -16.0% | $1,054,697 | 1+$104,105 | 2-$449,063 | |
| 2 | BAKER & COMPANY CONSTRUCTION, LLC | $10,553,425 | +11.1% | -6.7% | $68,939 | 1+$137,617 | 4-$710,418 |
| 3 | LONGVIEW BRIDGE AND ROAD, LTD. | $10,622,365 | +11.8% | -6.1% | $459,342 | 1+$476,150 | 1-$144,901 |
| 4 | CDM HOLDINGS | $11,081,707 | +16.7% | -2.0% | $209,994 | 4+$804,756 | 2-$476,423 |
| 5 | R CONSTRUCTION CIVIL, LLC | $11,291,701 | +18.9% | -0.2% | $1,046,108 | 3+$959,012 | 1-$244,388 |
| 6 | DRAKE COMPANIES LLC | $12,337,809 | +29.9% | 9.1% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
EAST TEXAS BRIDGE, INC. vs BAKER & COMPANY CONSTRUCTION, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 360-7021 CONC PVMT (CPCD) (11") | 31,948 SY | $82.00 | $113.30 | $86.67 | $999,972 |
| 432-7001 RIPRAP (CONC)(4 IN) | 554 CY | $500.00 | $945.00 | $573.24 | $246,530 |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 22,669 CY | $15.00 | $6.15 | $15.82 | -$200,621 |
| 512-7049 PORT CTB (REMOVE)(SGL SLP)(TY 1) | 5,310 LF | $10.00 | $38.00 | $12.08 | $148,680 |
| 512-7001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 5,310 LF | $82.00 | $59.00 | $52.29 | -$122,130 |
| 500-7001 MOBILIZATION | 1 LS | $525,000.00 | $630,000.00 | $523,850.32 | $105,000 |
| 110-7001 EXCAV (ROADWAY) | 31,343 CY | $10.00 | $7.40 | $11.68 | -$81,492 |
| 752-7014 TREE AND BRUSH REMOVAL | 4 AC | $30,000.00 | $10,500.00 | $3,973.65 | -$78,000 |
| 275-7003 CEMENT TRT (EXIST MATL)(8") | 41,359 SY | $3.00 | $4.85 | $3.04 | $76,514 |
| 416-7037 DRILL SHAFT (HIGH MAST POLE) (60 IN) | 96 LF | $1,065.00 | $580.00 | $860.26 | -$46,560 |
| 531-7001 CONC SIDEWALKS (4") | 1,542 SY | $70.00 | $100.00 | $70.57 | $46,260 |
| 613-7005 HI MST IL POLE (150 FT)( 80 MPH) | 3 EA | $61,000.00 | $46,050.00 | $51,496.56 | -$44,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 MO | $2,500.00 | $5,300.00 | $11,585.04 | $42,000 |
| 556-7008 PIPE UNDERDRAINS (TY 8) (6") | 2,585 LF | $42.00 | $29.50 | $32.77 | -$32,313 |
| 100-7002 PREPARING ROW | 68.4 STA | $1,500.00 | $1,050.00 | $6,072.92 | -$30,780 |
| 310-7004 PRIME COAT (MC-30) | 10,342 GAL | $5.50 | $8.40 | $5.35 | $29,992 |
| 529-7018 CONC CURB & GUTTER (ARMOR CURB) | 100 LF | $550.00 | $281.00 | $296.58 | -$26,900 |
| 420-7002 CL A CONC (MISC) | 50 CY | $250.00 | $710.00 | $560.77 | $23,000 |
| 344-7051 SP MIXES SP-D PG70-22 | 7,441 TON | $148.00 | $151.00 | $139.43 | $22,323 |
| 614-7002 LED HI MST IL ASM (6 FIXT) (TY A) | 3 EA | $50,000.00 | $43,075.00 | $37,981.53 | -$20,775 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,055,851 of the $1,054,697 gap.
EAST TEXAS BRIDGE, INC.: unbalanced items
Placed 1BAKER & COMPANY CONSTRUCTION, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 512-7049 PORT CTB (REMOVE)(SGL SLP)(TY 1) | 5,310 LF | $38.00 | $12.08 | 3.14x | $137,617 |
| 100-7002 PREPARING ROW | 68.4 STA | $1,050.00 | $6,072.92 | 0.17x | -$343,568 |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 22,669 CY | $6.15 | $15.82 | 0.39x | -$219,241 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 MO | $5,300.00 | $11,585.04 | 0.46x | -$94,276 |
| 529-7002 CONC CURB (TY II) | 2,397 LF | $4.20 | $26.45 | 0.16x | -$53,334 |
LONGVIEW BRIDGE AND ROAD, LTD.: unbalanced items
Placed 3CDM HOLDINGS: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,000,000.00 | $523,850.32 | 1.91x | $476,150 |
| 512-7049 PORT CTB (REMOVE)(SGL SLP)(TY 1) | 5,310 LF | $36.75 | $12.08 | 3.04x | $130,980 |
| 531-7001 CONC SIDEWALKS (4") | 1,542 SY | $137.70 | $70.57 | 1.95x | $103,521 |
| 752-7014 TREE AND BRUSH REMOVAL | 4 AC | $27,500.00 | $3,973.65 | 6.92x | $94,105 |
| 100-7002 PREPARING ROW | 68.4 STA | $1,100.00 | $6,072.92 | 0.18x | -$340,148 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 MO | $2,500.00 | $11,585.04 | 0.22x | -$136,276 |
R CONSTRUCTION CIVIL, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 168-7001 VEGETATIVE WATERING | 1,970.5 TGL | $200.00 | $8.43 | 23.71x | $377,481 |
| 110-7001 EXCAV (ROADWAY) | 31,343 CY | $23.00 | $11.68 | 1.97x | $354,734 |
| 512-7001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 5,310 LF | $95.00 | $52.29 | 1.82x | $226,796 |
| 100-7002 PREPARING ROW | 68.4 STA | $2,500.00 | $6,072.92 | 0.41x | -$244,388 |