6476-11-001 SH 288 Flexible Asset MNT
6476-11-001 · let Jun 2, 2026 · Harris, Houston · Routine Maintenance Project - Sealed
$21,230,355Low bid: HAZMAT INTERNATIONAL, INC.+20.5% vs estimate $17,617,900
$1,746,405Left on the table8.2% gap to the second bid
4BiddersSpread 62% low to high
33Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | HAZMAT INTERNATIONAL, INC. | $21,230,355 | 20.5% | $1,746,405 | 0 | 0 | |
| 2 | ROY JORGENSEN ASSOCIATES, INC. | $22,976,760 | +8.2% | 30.4% | $9,350,422 | 3+$653,652 | 1-$144,479 |
| 3 | ISI CONTRACTING, INC. | $32,327,182 | +52.3% | 83.5% | $2,071,142 | 1+$439,416 | 0 |
| 4 | WEBBER INFRASTRUCTURE MANAGEMENT, INC. | $34,398,324 | +62.0% | 95.2% | 4+$1,467,773 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
HAZMAT INTERNATIONAL, INC. vs ROY JORGENSEN ASSOCIATES, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 7100-7001 ROUTINE MAINTENANCE SERVICES | 360 MI | $43,000.00 | $49,500.00 | $43,000.00 | $2,340,000 |
| 361-7044 FULL-DEPTH REPAIR CRCP (VAR DEPTH) | 2,000 CY | $1,325.00 | $700.00 | $1,211.78 | -$1,250,000 |
| 500-7002 MOBILIZATION (CALLOUT) | 20 EA | $1,000.00 | $20,000.00 | $600.85 | $380,000 |
| 545-7006 CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 29 EA | $22,400.00 | $35,000.00 | $26,188.60 | $365,400 |
| 3017-7002 SPOT GRINDING - CONCRETE PAVEMENT | 6,000 SY | $40.00 | $5.00 | $29.08 | -$210,000 |
| 7100-7002 SNOW AND ICE CONTROL (SEASONAL) | 12 MO | $10,000.00 | $20,000.00 | $10,000.00 | $120,000 |
| 3017-7004 SPOT GRINDING -ASPHALTIC PAVEMENT | 3,000 SY | $40.00 | $5.00 | $29.00 | -$105,000 |
| 7100-7006 SNOW AND ICE CONTROL (SPRAY RIG) | 800 HR | $150.00 | $45.00 | $150.00 | -$84,000 |
| 7100-7004 SNOW AND ICE CONTROL (SHADOW VEHICLE) | 720 HR | $125.00 | $35.00 | $125.00 | -$64,800 |
| 427-7002 CONCRETE PAINT FINISH | 30,000 SF | $1.10 | $3.00 | $0.9252 | $57,000 |
| 7100-7003 SNOW AND ICE CONTROL (TRUCK) | 1,008 HR | $100.00 | $45.00 | $100.00 | -$55,440 |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 1,500 SY | $100.00 | $133.00 | $35.89 | $49,500 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 500 SY | $125.00 | $224.00 | $98.88 | $49,500 |
| 545-7004 CRASH CUSH ATTEN (REMOVE) | 36 EA | $800.00 | $2,000.00 | $941.31 | $43,200 |
| 351-7014 FLEXIBLE PAVEMENT STRUCTURE REPAIR(15") | 500 SY | $175.00 | $255.00 | $144.20 | $40,000 |
| 361-7068 FULL-DEPTH REP(BR APPR SLAB)(9"-13") | 1,000 SY | $565.00 | $600.00 | $550.34 | $35,000 |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 1,000 LF | $28.93 | $60.00 | $25.60 | $31,070 |
| 545-7008 CRASH CUSH ATTEN (INSTL)(L)(W)(TL3) | 7 EA | $33,200.00 | $30,000.00 | $40,414.54 | -$22,400 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 25 EA | $3,249.75 | $4,000.00 | $3,190.07 | $18,756 |
| 7100-7005 SNOW AND ICE CONTROL (LOADER) | 72 HR | $5.00 | $250.00 | $5.00 | $17,640 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,755,426 of the $1,746,405 gap.
ROY JORGENSEN ASSOCIATES, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7002 MOBILIZATION (CALLOUT) | 20 EA | $20,000.00 | $600.85 | 33.29x | $387,983 |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 1,500 SY | $133.00 | $35.89 | 3.71x | $145,669 |
| 7100-7002 SNOW AND ICE CONTROL (SEASONAL) | 12 MO | $20,000.00 | $10,000.00 | 2.00x | $120,000 |
| 3017-7002 SPOT GRINDING - CONCRETE PAVEMENT | 6,000 SY | $5.00 | $29.08 | 0.17x | -$144,479 |
ISI CONTRACTING, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 7100-7002 SNOW AND ICE CONTROL (SEASONAL) | 12 MO | $46,618.00 | $10,000.00 | 4.66x | $439,416 |
WEBBER INFRASTRUCTURE MANAGEMENT, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 361-7068 FULL-DEPTH REP(BR APPR SLAB)(9"-13") | 1,000 SY | $1,388.09 | $550.34 | 2.52x | $837,749 |
| 540-7002 MTL W-BEAM GD FEN (STEEL POST) | 4,000 LF | $88.26 | $30.74 | 2.87x | $230,065 |
| 7100-7002 SNOW AND ICE CONTROL (SEASONAL) | 12 MO | $27,457.03 | $10,000.00 | 2.75x | $209,484 |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 1,500 SY | $162.87 | $35.89 | 4.54x | $190,474 |