City of Coleman - Pedestrian Protection
0923-08-042 · let Jun 3, 2026 · Coleman, Brownwood · Pedestrian, Sidewalks & Curb Ramps
$2,189,861Low bid: 3LW CIVIL LLC-13.9% vs estimate $2,544,721
$176,064Left on the table8.0% gap to the second bid
4BiddersSpread 39% low to high
97Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | 3LW CIVIL LLC | $2,189,861 | -13.9% | $176,064 | 5+$93,696 | 6-$594,600 | |
| 2 | DELGADO'S CONTRACTORS, LLC | $2,365,925 | +8.0% | -7.0% | $330,376 | 4+$65,536 | 3-$504,939 |
| 3 | TI-ZACK CONCRETE, LLC | $2,696,301 | +23.1% | 6.0% | $344,199 | 6+$207,291 | 7-$478,767 |
| 4 | PROJECT ALLIED RESOURCES, LLC | $3,040,500 | +38.8% | 19.5% | 5+$115,086 | 2-$108,878 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
3LW CIVIL LLC vs DELGADO'S CONTRACTORS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 618-7030 CONDT (PVC) (SCH 40) (2") | 4,980 LF | $11.44 | $22.11 | $13.17 | $53,137 |
| 500-7001 MOBILIZATION | 1 LS | $105,525.00 | $145,000.00 | $523,850.32 | $39,475 |
| 505-7001 TMA (STATIONARY) | 152 DAY | $135.00 | $350.00 | $217.57 | $32,680 |
| 531-7015 CURB RAMPS (TY 1) | 340 SY | $104.49 | $200.00 | $213.28 | $32,473 |
| 529-7002 CONC CURB (TY II) | 2,479 LF | $32.12 | $45.00 | $26.45 | $31,930 |
| 531-7020 CURB RAMPS (TY 7) | 298 SY | $116.97 | $220.00 | $201.04 | $30,703 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 4,850 LF | $0.0100 | $6.00 | $4.63 | $29,052 |
| 531-7001 CONC SIDEWALKS (4") | 4,342 SY | $78.49 | $85.00 | $70.57 | $28,266 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $5,203.13 | $2,900.00 | $11,585.04 | -$27,638 |
| 530-7001 INTERSECTIONS (CONC) | 1,100 SY | $139.59 | $115.00 | $161.58 | -$27,049 |
| 104-7010 REMOV CONC (PAVERS) | 360 SY | $68.41 | $15.00 | $14.49 | -$19,228 |
| 610-7004 RELOCATE RD IL ASM (TRANS-BASE) | 16 EA | $2,436.04 | $1,354.39 | $2,721.12 | -$17,306 |
| 624-7004 GROUND BOX TY B (122322)W/APRON | 27 EA | $1,987.47 | $2,624.60 | $1,871.05 | $17,203 |
| 531-7023 CURB RAMPS (TY 21) | 160 SY | $109.82 | $200.00 | $221.36 | $14,429 |
| 529-7019 CONCRETE C&G (VALLEY GUTTER) | 2,866 LF | $55.00 | $50.00 | $60.15 | -$14,330 |
| 531-7021 CURB RAMPS (TY 10) | 143 SY | $109.58 | $200.00 | $266.68 | $12,930 |
| 416-7005 DRILL SHAFT (30 IN) | 248 LF | $250.00 | $300.00 | $239.74 | $12,400 |
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 1,584 LB | $32.81 | $25.00 | $11.11 | -$12,371 |
| 620-7008 ELEC CONDR (NO.8) INSULATED | 10,870 LF | $2.12 | $3.19 | $2.11 | $11,631 |
| 462-7018 CONC BOX CULV (7 FT X 6 FT) | 16 LF | $1,385.02 | $700.00 | $675.88 | -$10,960 |
Positive: the low bidder was cheaper on that item. These 20 items account for $217,426 of the $176,064 gap.
3LW CIVIL LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 1,584 LB | $32.81 | $11.11 | 2.95x | $34,371 |
| 104-7010 REMOV CONC (PAVERS) | 360 SY | $68.41 | $14.49 | 4.72x | $19,410 |
| 162-7002 BLOCK SODDING | 2,985 SY | $9.20 | $4.39 | 2.10x | $14,365 |
| 104-7017 REMOV CONC (CURB & GUTTER) | 890 LF | $24.00 | $8.04 | 2.98x | $14,204 |
| 462-7018 CONC BOX CULV (7 FT X 6 FT) | 16 LF | $1,385.02 | $675.88 | 2.05x | $11,346 |
| 500-7001 MOBILIZATION | 1 LS | $105,525.00 | $523,850.32 | 0.20x | -$418,325 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $5,203.13 | $11,585.04 | 0.45x | -$76,583 |
| 531-7015 CURB RAMPS (TY 1) | 340 SY | $104.49 | $213.28 | 0.49x | -$36,988 |
| 531-7021 CURB RAMPS (TY 10) | 143 SY | $109.58 | $266.68 | 0.41x | -$22,465 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 4,850 LF | $0.0100 | $4.63 | 0.00x | -$22,393 |
| 531-7023 CURB RAMPS (TY 21) | 160 SY | $109.82 | $221.36 | 0.50x | -$17,846 |
DELGADO'S CONTRACTORS, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 1,584 LB | $25.00 | $11.11 | 2.25x | $22,000 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 2,985 SY | $7.00 | $1.43 | 4.90x | $16,629 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 1,619 LF | $16.23 | $7.19 | 2.26x | $14,633 |
| 162-7002 BLOCK SODDING | 2,985 SY | $8.50 | $4.39 | 1.94x | $12,275 |
| 500-7001 MOBILIZATION | 1 LS | $145,000.00 | $523,850.32 | 0.28x | -$378,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $2,900.00 | $11,585.04 | 0.25x | -$104,221 |
| 610-7004 RELOCATE RD IL ASM (TRANS-BASE) | 16 EA | $1,354.39 | $2,721.12 | 0.50x | -$21,868 |
TI-ZACK CONCRETE, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 529-7002 CONC CURB (TY II) | 2,479 LF | $60.03 | $26.45 | 2.27x | $83,244 |
| 529-7009 CONC CURB & GUTTER (TY II) | 1,653 LF | $60.03 | $32.57 | 1.84x | $45,394 |
| 462-7018 CONC BOX CULV (7 FT X 6 FT) | 16 LF | $2,323.20 | $675.88 | 3.44x | $26,357 |
| 466-7206 WINGWALL (SW - 0) (HW=7 FT) | 1 EA | $33,000.00 | $12,801.11 | 2.58x | $20,199 |
| 462-7020 CONC BOX CULV (8 FT X 3 FT) | 12 LF | $2,153.80 | $699.13 | 3.08x | $17,456 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 1,619 LF | $16.23 | $7.19 | 2.26x | $14,641 |
| 500-7001 MOBILIZATION | 1 LS | $247,288.80 | $523,850.32 | 0.47x | -$276,562 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $3,850.00 | $11,585.04 | 0.33x | -$92,821 |
| 505-7001 TMA (STATIONARY) | 152 DAY | $0.1100 | $217.57 | 0.00x | -$33,054 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 4,850 LF | $0.0100 | $4.63 | 0.00x | -$22,393 |
| 610-7004 RELOCATE RD IL ASM (TRANS-BASE) | 16 EA | $1,354.39 | $2,721.12 | 0.50x | -$21,868 |
| 5061-7001 SUBSURFACE UTIL LOCATE (NON-PAVED AREA) | 20 EA | $110.00 | $920.62 | 0.12x | -$16,212 |
| 442-7007 STR STEEL (MISC NON-BRIDGE) | 1,584 LB | $1.10 | $11.11 | 0.10x | -$15,858 |
PROJECT ALLIED RESOURCES, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 4,850 LF | $10.30 | $4.63 | 2.23x | $27,514 |
| 420-7002 CL A CONC (MISC) | 6 CY | $5,070.00 | $560.77 | 9.04x | $27,055 |
| 100-7013 TREE PROTECTION (INSTALL) | 14 EA | $1,950.00 | $241.94 | 8.06x | $23,913 |
| 162-7002 BLOCK SODDING | 2,985 SY | $11.00 | $4.39 | 2.51x | $19,738 |
| 462-7018 CONC BOX CULV (7 FT X 6 FT) | 16 LF | $1,730.00 | $675.88 | 2.56x | $16,866 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $4,340.00 | $11,585.04 | 0.37x | -$86,941 |
| 610-7004 RELOCATE RD IL ASM (TRANS-BASE) | 16 EA | $1,350.00 | $2,721.12 | 0.50x | -$21,938 |