VA; VAR LOC IN TARRANT CO
0902-90-112 · let Jul 2, 2026 · Tarrant, Fort Worth · Traffic Control Devices
$3,181,301Low bid: SICE, INC.-24.0% vs estimate $4,188,498
$256,699Left on the table8.1% gap to the second bid
6BiddersSpread 65% low to high
61Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | SICE, INC. | $3,181,301 | -24.0% | $256,699 | 0 | 1-$20,713 | |
| 2 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | $3,438,000 | +8.1% | -17.9% | $46,188 | 3+$277,075 | 3-$445,053 |
| 3 | MICA CORPORATION | $3,484,188 | +9.5% | -16.8% | $98,760 | 2+$177,893 | 0 |
| 4 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $3,582,948 | +12.6% | -14.5% | $444,449 | 2+$181,394 | 0 |
| 5 | ELECNOR BELCO ELECTRIC, INC. | $4,027,397 | +26.6% | -3.8% | $1,236,065 | 6+$301,186 | 0 |
| 6 | Lumin8 Transportation Technologies, LLC | $5,263,462 | +65.4% | 25.7% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
SICE, INC. vs FLORIDA TRAFFIC CONTROL DEVICES, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 416-7008 DRILL SHAFT (48 IN) | 448 LF | $522.25 | $788.00 | $400.14 | $119,056 |
| 500-7001 MOBILIZATION | 1 LS | $314,917.04 | $200,000.00 | $523,850.32 | -$114,917 |
| 416-7009 DRILL SHAFT (54 IN) | 179 LF | $529.70 | $1,063.00 | $583.44 | $95,461 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $9,395.87 | $2,290.00 | $11,585.04 | -$71,059 |
| 618-7061 CONDT (PVC) (SCH 80) (3") (BORE) | 3,825 LF | $16.07 | $32.70 | $26.77 | $63,621 |
| 628-7156 ELC SRV TY D 120/240 060(NS)SS(N)SP(O) | 13 EA | $7,378.84 | $12,200.00 | $7,951.51 | $62,675 |
| 6011-7003 ITS POLE (60 FT)(90 MPH) | 20 EA | $28,016.90 | $26,140.00 | $29,054.71 | -$37,538 |
| 623-7008 ITS GND BOX(PCAST) TY 2 (366036)W/APRN | 12 EA | $5,560.03 | $8,390.00 | $6,941.33 | $33,960 |
| 6018-7002 CCTV FIELD EQUIPMENT (DIGITAL) | 20 EA | $7,342.48 | $8,930.00 | $7,625.80 | $31,750 |
| 6010-7001 ITS RVSD (DATA COLLECT & WWA) SYS | 19 EA | $13,559.99 | $11,900.00 | $14,188.20 | -$31,540 |
| 623-7002 ITS GND BOX(PCAST) TY 1 (243636)W/APRN | 14 EA | $3,628.31 | $5,355.00 | $4,315.38 | $24,174 |
| 618-7036 CONDT (PVC) (SCH 40) (3") | 10,234 LF | $15.31 | $17.65 | $15.29 | $23,958 |
| 618-7090 CONDUIT (PREPARE) | 5,515 LF | $0.6180 | $4.50 | $3.08 | $21,409 |
| 505-7001 TMA (STATIONARY) | 141 DAY | $307.68 | $169.00 | $217.57 | -$19,554 |
| 650-7035 INS OH SN SUP(35 FT BAL TEE) | 6 EA | $47,371.97 | $50,565.00 | $51,316.81 | $19,158 |
| 6027-7002 FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER) | 7,895 LF | $2.31 | $4.30 | $2.09 | $15,743 |
| 6004-7001 INSTALL DMS (POLE MTD CABINET) | 6 EA | $10,436.77 | $12,725.00 | $15,439.15 | $13,729 |
| 620-7020 ELEC CONDR (1/0) INSULATED | 6,270 LF | $4.59 | $6.70 | $5.35 | $13,205 |
| 628-7154 ELC SRV TY D 120/240 060(NS)SS(N)PS(U) | 6 EA | $6,202.06 | $8,400.00 | $7,927.86 | $13,188 |
| 6011-7004 ITS POLE MNT CAB (TY 3)(CONF 2) | 18 EA | $6,039.37 | $5,320.00 | $5,688.49 | -$12,949 |
Positive: the low bidder was cheaper on that item. These 20 items account for $263,530 of the $256,699 gap.
SICE, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 15 EA | $792.64 | $2,173.48 | 0.36x | -$20,713 |
FLORIDA TRAFFIC CONTROL DEVICES, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 416-7008 DRILL SHAFT (48 IN) | 448 LF | $788.00 | $400.14 | 1.97x | $173,760 |
| 416-7009 DRILL SHAFT (54 IN) | 179 LF | $1,063.00 | $583.44 | 1.82x | $85,842 |
| 6027-7002 FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER) | 7,895 LF | $4.30 | $2.09 | 2.06x | $17,472 |
| 500-7001 MOBILIZATION | 1 LS | $200,000.00 | $523,850.32 | 0.38x | -$323,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $2,290.00 | $11,585.04 | 0.20x | -$92,950 |
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 15 EA | $290.00 | $2,173.48 | 0.13x | -$28,252 |
MICA CORPORATION: unbalanced items
Placed 3HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC: unbalanced items
Placed 4ELECNOR BELCO ELECTRIC, INC.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 416-7008 DRILL SHAFT (48 IN) | 448 LF | $703.00 | $400.14 | 1.76x | $135,680 |
| 168-7001 VEGETATIVE WATERING | 128 TGL | $398.00 | $8.43 | 47.19x | $49,864 |
| 162-7002 BLOCK SODDING | 3,640 SY | $15.30 | $4.39 | 3.49x | $39,721 |
| 6027-7045 FO CBL (24 SMF)(PIGTAIL) | 1,275 LF | $23.00 | $2.16 | 10.66x | $26,575 |
| 6018-7010 CCTV MOUNT (PEDESTAL) | 20 EA | $2,224.00 | $946.96 | 2.35x | $25,541 |
| 618-7090 CONDUIT (PREPARE) | 5,515 LF | $7.40 | $3.08 | 2.40x | $23,805 |