Bid Tab X-ray: 6503-85-001

Jul 14, 2026 · Washington Sign up free
Set your company to personalize scores

FY26 Brenham AO Riprap - 07

6503-85-001 · let Jul 14, 2026 · Washington, Bryan · Material Maintenance Project

$231,200Low bid: TOUCHSTONE RESOURCES, LLC+2.8% vs estimate $225,000
$35,972Left on the table15.6% gap to the second bid
2BiddersSpread 16% low to high
12Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TOUCHSTONE RESOURCES, LLC $231,2002.8% $35,972 0 0
2SOUTHERN SOURCING SOLUTIONS, LLC $267,172+15.6%18.7% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

TOUCHSTONE RESOURCES, LLC vs SOUTHERN SOURCING SOLUTIONS, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8004-7023 RIPRAP(STONE PROT)(12 IN)(DEL)(ST1)300 CY $95.00$117.04$96.59 $6,612
8004-7034 RIPRAP(STONE PROT)(18 IN)(DEL)(ST1)300 CY $97.00$117.04$88.85 $6,012
8004-7001 RIPRAP(STN CMN DRY)(3"-5")(DEL)(ST 1)200 CY $65.00$86.92$60.08 $4,384
8004-7024 RIPRAP(STONE PROT)(12 IN)(DEL)(ST2)300 CY $85.00$97.02$82.66 $3,606
8004-7003 RIPRAP(STN CMN DRY)(3"-5")(DEL)(ST 3)200 CY $63.00$80.08$64.84 $3,416
8004-7002 RIPRAP(STN CMN DRY)(3"-5")(DEL)(ST 2)200 CY $65.00$80.08$62.44 $3,016
8004-7035 RIPRAP(STONE PROT)(18 IN)(DEL)(ST2)300 CY $87.00$97.02$80.61 $3,006
8004-7045 RIPRAP(STONE PROT)(24 IN)(DEL)(ST1)100 CY $95.00$117.04$101.00 $2,204
8004-7025 RIPRAP(STONE PROT)(12 IN)(DEL)(ST3)300 CY $90.00$97.02$87.70 $2,106
8004-7036 RIPRAP(STONE PROT)(18 IN)(DEL)(ST3)300 CY $94.00$97.02$85.54 $906
8004-7046 RIPRAP(STONE PROT)(24 IN)(DEL)(ST2)100 CY $90.00$97.02$85.85 $702
8004-7047 RIPRAP(STONE PROT)(24 IN)(DEL)(ST3)100 CY $97.00$97.02$96.05 $2

Positive: the low bidder was cheaper on that item. These 12 items account for $35,972 of the $35,972 gap.