FY 27 BPM Site Specific Central
6503-71-001 · let Jul 21, 2026 · Smith, Tyler · Bridge Preventative Maintenance - Sealed
$553,299Low bid: RED BARON BUILDING COMPANY MUNICIPAL PROJECTS DIVISION LLC-11.0% vs estimate $621,455
$111,972Left on the table20.2% gap to the second bid
5BiddersSpread 74% low to high
36Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | RED BARON BUILDING COMPANY MUNICIPAL PROJECTS DIVISION LLC | $553,299 | -11.0% | $111,972 | 7+$75,160 | 5-$642,905 | |
| 2 | ICOS MANAGEMENT, LLC | $665,271 | +20.2% | 7.1% | $59,028 | 8+$88,678 | 3-$573,944 |
| 3 | SHALOM SERVICES CORPORATION | $724,299 | +30.9% | 16.5% | $47,306 | 8+$226,352 | 5-$641,700 |
| 4 | GHB EQUIPMENT COMPANY, L.L.C. | $771,605 | +39.5% | 24.2% | $189,106 | 9+$159,173 | 2-$534,531 |
| 5 | ODUM SERVICES, LLC | $960,711 | +73.6% | 54.6% | 13+$352,542 | 1-$463,850 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
RED BARON BUILDING COMPANY MUNICIPAL PROJECTS DIVISION LLC vs ICOS MANAGEMENT, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 785-7002 BRIDGE JOINT REPAIR (HEADER) | 475 LF | $90.00 | $294.00 | $199.12 | $96,900 |
| 403-7001 TEMPORARY SPL SHORING | 360 SF | $115.00 | $10.50 | $25.56 | -$37,620 |
| 432-7047 RIPRAP (STONE PROTECTION)(30 IN) | 451 CY | $250.00 | $189.00 | $160.54 | -$27,511 |
| 500-7001 MOBILIZATION | 1 LS | $30,000.00 | $48,000.00 | $523,850.32 | $18,000 |
| 100-7017 PREPARING ROW(OPT 1) | 13.5 STA | $800.00 | $2,100.00 | $1,741.72 | $17,550 |
| 420-7060 CL C CONC (PILE ENCASEMENT) | 9 CY | $1,800.00 | $3,675.00 | $827.85 | $16,875 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $1,800.00 | $1.10 | $11,585.04 | -$14,391 |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 232 CY | $250.00 | $189.00 | $190.61 | -$14,152 |
| 438-7008 CLEANING EXISTING JOINTS | 1,050 LF | $19.00 | $29.40 | $16.75 | $10,920 |
| 505-7001 TMA (STATIONARY) | 53 DAY | $100.00 | $262.50 | $217.57 | $8,613 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 56 DAY | $125.00 | $262.50 | $87.82 | $7,700 |
| 540-7002 MTL W-BEAM GD FEN (STEEL POST) | 700 LF | $32.00 | $42.00 | $30.74 | $7,000 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 4 EA | $3,500.00 | $5,250.00 | $3,190.07 | $7,000 |
| 466-7154 WINGWALL (FW - 0) (HW=12 FT) | 1 EA | $20,000.00 | $26,250.00 | $21,725.00 | $6,250 |
| 540-7027 MTL BM GD FEN (LONG SPAN SYSTEM) | 2 EA | $1,400.00 | $4,200.00 | $821.07 | $5,600 |
| 5013-7001 STONE MASONRY REPAIR | 40 SF | $85.00 | $210.00 | $39.63 | $5,000 |
| 480-7001 CLEAN EXIST CULVERTS | 1 EA | $10,000.00 | $6,300.00 | $1,712.97 | -$3,700 |
| 7010-7001 MAINTENANCE SPEED LIMIT SIGNING | 5 EA | $800.00 | $105.00 | $36.55 | -$3,475 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 210 LF | $36.00 | $52.50 | $15.92 | $3,465 |
| 164-7073 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 3,400 SY | $2.00 | $1.10 | $0.5463 | -$3,060 |
Positive: the low bidder was cheaper on that item. These 20 items account for $106,963 of the $111,972 gap.
RED BARON BUILDING COMPANY MUNICIPAL PROJECTS DIVISION LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 403-7001 TEMPORARY SPL SHORING | 360 SF | $115.00 | $25.56 | 4.50x | $32,198 |
| 400-7010 CEM STABIL BKFL | 80 CY | $300.00 | $138.14 | 2.17x | $12,949 |
| 420-7060 CL C CONC (PILE ENCASEMENT) | 9 CY | $1,800.00 | $827.85 | 2.17x | $8,749 |
| 480-7001 CLEAN EXIST CULVERTS | 1 EA | $10,000.00 | $1,712.97 | 5.84x | $8,287 |
| 164-7073 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 3,400 SY | $2.00 | $0.5463 | 3.66x | $4,943 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 210 LF | $36.00 | $15.92 | 2.26x | $4,217 |
| 7010-7001 MAINTENANCE SPEED LIMIT SIGNING | 5 EA | $800.00 | $36.55 | 21.89x | $3,817 |
| 500-7001 MOBILIZATION | 1 LS | $30,000.00 | $523,850.32 | 0.06x | -$493,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $1,800.00 | $11,585.04 | 0.16x | -$78,280 |
| 785-7002 BRIDGE JOINT REPAIR (HEADER) | 475 LF | $90.00 | $199.12 | 0.45x | -$51,830 |
| 100-7017 PREPARING ROW(OPT 1) | 13.5 STA | $800.00 | $1,741.72 | 0.46x | -$12,713 |
| 505-7001 TMA (STATIONARY) | 53 DAY | $100.00 | $217.57 | 0.46x | -$6,231 |
ICOS MANAGEMENT, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 420-7060 CL C CONC (PILE ENCASEMENT) | 9 CY | $3,675.00 | $827.85 | 4.44x | $25,624 |
| 400-7010 CEM STABIL BKFL | 80 CY | $315.00 | $138.14 | 2.28x | $14,149 |
| 438-7008 CLEANING EXISTING JOINTS | 1,050 LF | $29.40 | $16.75 | 1.76x | $13,281 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 56 DAY | $262.50 | $87.82 | 2.99x | $9,782 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 210 LF | $52.50 | $15.92 | 3.30x | $7,682 |
| 5013-7001 STONE MASONRY REPAIR | 40 SF | $210.00 | $39.63 | 5.30x | $6,815 |
| 540-7027 MTL BM GD FEN (LONG SPAN SYSTEM) | 2 EA | $4,200.00 | $821.07 | 5.12x | $6,758 |
| 480-7001 CLEAN EXIST CULVERTS | 1 EA | $6,300.00 | $1,712.97 | 3.68x | $4,587 |
| 500-7001 MOBILIZATION | 1 LS | $48,000.00 | $523,850.32 | 0.09x | -$475,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $1.10 | $11,585.04 | 0.00x | -$92,672 |
| 403-7001 TEMPORARY SPL SHORING | 360 SF | $10.50 | $25.56 | 0.41x | -$5,422 |
SHALOM SERVICES CORPORATION: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 432-7047 RIPRAP (STONE PROTECTION)(30 IN) | 451 CY | $350.00 | $160.54 | 2.18x | $85,446 |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 232 CY | $350.00 | $190.61 | 1.84x | $36,978 |
| 438-7008 CLEANING EXISTING JOINTS | 1,050 LF | $45.00 | $16.75 | 2.69x | $29,661 |
| 400-7010 CEM STABIL BKFL | 80 CY | $500.00 | $138.14 | 3.62x | $28,949 |
| 466-7154 WINGWALL (FW - 0) (HW=12 FT) | 1 EA | $40,000.00 | $21,725.00 | 1.84x | $18,275 |
| 420-7060 CL C CONC (PILE ENCASEMENT) | 9 CY | $2,000.00 | $827.85 | 2.42x | $10,549 |
| 480-7001 CLEAN EXIST CULVERTS | 1 EA | $10,000.00 | $1,712.97 | 5.84x | $8,287 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 210 LF | $55.00 | $15.92 | 3.46x | $8,207 |
| 500-7001 MOBILIZATION | 1 LS | $5.00 | $523,850.32 | 0.00x | -$523,845 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $1.00 | $11,585.04 | 0.00x | -$92,672 |
| 505-7001 TMA (STATIONARY) | 53 DAY | $1.00 | $217.57 | 0.00x | -$11,478 |
| 403-7001 TEMPORARY SPL SHORING | 360 SF | $1.00 | $25.56 | 0.04x | -$8,842 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 56 DAY | $1.00 | $87.82 | 0.01x | -$4,862 |
GHB EQUIPMENT COMPANY, L.L.C.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 432-7047 RIPRAP (STONE PROTECTION)(30 IN) | 451 CY | $295.00 | $160.54 | 1.84x | $60,641 |
| 403-7001 TEMPORARY SPL SHORING | 360 SF | $85.00 | $25.56 | 3.33x | $21,398 |
| 420-7060 CL C CONC (PILE ENCASEMENT) | 9 CY | $2,500.00 | $827.85 | 3.02x | $15,049 |
| 5013-7001 STONE MASONRY REPAIR | 40 SF | $400.00 | $39.63 | 10.09x | $14,415 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 4 EA | $6,000.00 | $3,190.07 | 1.88x | $11,240 |
| 400-7010 CEM STABIL BKFL | 80 CY | $275.00 | $138.14 | 1.99x | $10,949 |
| 540-7027 MTL BM GD FEN (LONG SPAN SYSTEM) | 2 EA | $6,000.00 | $821.07 | 7.31x | $10,358 |
| 132-7017 EMBANK (VEH)(OC)(TY C) | 160 CY | $100.00 | $37.09 | 2.70x | $10,066 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 210 LF | $40.00 | $15.92 | 2.51x | $5,057 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $4,000.00 | $11,585.04 | 0.35x | -$60,680 |
ODUM SERVICES, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 785-7002 BRIDGE JOINT REPAIR (HEADER) | 475 LF | $400.00 | $199.12 | 2.01x | $95,420 |
| 432-7047 RIPRAP (STONE PROTECTION)(30 IN) | 451 CY | $350.00 | $160.54 | 2.18x | $85,446 |
| 403-7001 TEMPORARY SPL SHORING | 360 SF | $150.00 | $25.56 | 5.87x | $44,798 |
| 438-7008 CLEANING EXISTING JOINTS | 1,050 LF | $50.00 | $16.75 | 2.98x | $34,911 |
| 5013-7001 STONE MASONRY REPAIR | 40 SF | $500.00 | $39.63 | 12.62x | $18,415 |
| 400-7010 CEM STABIL BKFL | 80 CY | $300.00 | $138.14 | 2.17x | $12,949 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 210 LF | $75.00 | $15.92 | 4.71x | $12,407 |
| 432-7002 RIPRAP (CONC)(5 IN) | 12 CY | $1,500.00 | $585.15 | 2.56x | $10,978 |
| 420-7060 CL C CONC (PILE ENCASEMENT) | 9 CY | $2,000.00 | $827.85 | 2.42x | $10,549 |
| 110-7002 EXCAV (CHANNEL) | 10 CY | $1,000.00 | $16.69 | 59.90x | $9,833 |
| 500-7001 MOBILIZATION | 1 LS | $60,000.00 | $523,850.32 | 0.11x | -$463,850 |