FY '27 Palo Pinto MMC Sodium Chloride
6503-53-001 · let Jul 15, 2026 · Palo Pinto, Fort Worth · Material Maintenance Project
$306,104Low bid: NSG LOGISTICS, LLC-1.2% vs estimate $309,874
$98,696Left on the table32.2% gap to the second bid
2BiddersSpread 32% low to high
4Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | NSG LOGISTICS, LLC | $306,104 | -1.2% | $98,696 | 2+$107,856 | 0 | |
| 2 | TOUCHSTONE RESOURCES, LLC | $404,800 | +32.2% | 30.6% | 2+$151,506 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
NSG LOGISTICS, LLC vs TOUCHSTONE RESOURCES, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8032-7002 CAT 4A SOD CHLORIDE (DEL)(SITE 1) | 220 TON | $333.79 | $460.00 | $416.88 | $27,766 |
| 8032-7003 CAT 4A SOD CHLORIDE (DEL)(SITE 2) | 220 TON | $336.00 | $460.00 | $381.54 | $27,280 |
| 8032-7078 CAT 4A SOD CHLORIDE (DEL)(SITE 1) | 220 BAG | $359.69 | $460.00 | $139.28 | $22,068 |
| 8032-7079 CAT 4A SOD CHLORIDE (DEL)(SITE 2) | 220 BAG | $361.90 | $460.00 | $92.06 | $21,582 |
Positive: the low bidder was cheaper on that item. These 4 items account for $98,696 of the $98,696 gap.