FY 27-28 ROW Mowing 02, 09,10
6501-11-001 · let Jul 2, 2026 · Donley, Childress · Routine Maintenance Project
$917,556Low bid: SILVER LAKE CONSTRUCTION LLC-8.0% vs estimate $997,344
$45,158Left on the table4.9% gap to the second bid
4BiddersSpread 36% low to high
1Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | SILVER LAKE CONSTRUCTION LLC | $917,556 | -8.0% | $45,158 | 0 | 0 | |
| 2 | TEXAS BLACKTOPS LLC | $962,714 | +4.9% | -3.5% | $142,399 | 0 | 0 |
| 3 | ABESCAPE LANDSCAPING, LLC | $1,105,113 | +20.4% | 10.8% | $141,290 | 0 | 0 |
| 4 | MARLANE CONSTRUCTION, LLC | $1,246,403 | +35.8% | 25.0% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
SILVER LAKE CONSTRUCTION LLC vs TEXAS BLACKTOPS LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 730-7022 FULL - WIDTH MOWING | 27,704 AC | $33.12 | $34.75 | $38.53 | $45,158 |
Positive: the low bidder was cheaper on that item. These 1 items account for $45,158 of the $45,158 gap.