US 84 Safety Lighting
0053-08-077 · let Jul 1, 2026 · Scurry, Abilene · Safety Improvement Projects
$814,950Low bid: WILLIS ELECTRIC CO., LP-21.0% vs estimate $1,032,036
$124,255Left on the table15.2% gap to the second bid
6BiddersSpread 31% low to high
27Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | WILLIS ELECTRIC CO., LP | $814,950 | -21.0% | $124,255 | 1+$20,216 | 2-$491,405 | |
| 2 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $939,205 | +15.2% | -9.0% | $23,597 | 1+$5,242 | 2-$456,430 |
| 3 | LIGHT IT UP ELECTRIC | $962,802 | +18.1% | -6.7% | $28,542 | 0 | 2-$446,605 |
| 4 | VACA UNDERGROUND UTILITIES INC | $991,344 | +21.6% | -3.9% | $5,476 | 0 | 2-$469,605 |
| 5 | DIGG COMMERCIAL, LLC | $996,820 | +22.3% | -3.4% | $71,523 | 1+$71,297 | 1-$423,850 |
| 6 | STRUCTURAL INTEGRITY GROUP LLC | $1,068,343 | +31.1% | 3.5% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
WILLIS ELECTRIC CO., LP vs HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 614-7001 LED HI MST IL ASM (6 FIXT) (TY S) | 3 EA | $33,160.00 | $44,177.10 | $39,091.70 | $33,051 |
| 500-7001 MOBILIZATION | 1 LS | $60,000.00 | $92,699.87 | $523,850.32 | $32,700 |
| 416-7010 DRILL SHAFT (60 IN) | 200 LF | $732.00 | $862.02 | $699.76 | $26,004 |
| 614-7002 LED HI MST IL ASM (6 FIXT) (TY A) | 2 EA | $31,285.00 | $44,177.10 | $37,981.53 | $25,784 |
| 432-7007 RIPRAP (CONC) (CL B) (4 IN) | 20 CY | $1,575.00 | $864.19 | $564.22 | -$14,216 |
| 618-7054 CONDT (PVC) (SCH 80) (2") | 1,240 LF | $10.75 | $17.97 | $12.03 | $8,953 |
| 613-7006 HI MST IL POLE (150 FT)(100 MPH) | 5 EA | $60,150.00 | $61,596.48 | $63,325.33 | $7,232 |
| 628-7035 ELC SRV TY A 240/480 060(NS)AL(E)SP(O) | 4 EA | $8,500.00 | $9,986.88 | $8,925.26 | $5,948 |
| 624-7006 GROUND BOX TY C (162911)W/APRON | 14 EA | $2,000.00 | $1,603.14 | $1,930.54 | -$5,556 |
| 618-7055 CONDT (PVC) (SCH 80) (2") (BORE) | 180 LF | $32.50 | $49.45 | $20.33 | $3,051 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $2,400.00 | $3,158.51 | $11,585.04 | $2,276 |
| 416-7004 DRILL SHAFT (24 IN) | 30 LF | $275.00 | $206.39 | $234.98 | -$2,058 |
| 505-7001 TMA (STATIONARY) | 40 DAY | $200.00 | $235.68 | $217.57 | $1,427 |
| 620-7007 ELEC CONDR (NO.8) BARE | 1,480 LF | $2.00 | $1.85 | $1.94 | -$222 |
| 620-7008 ELEC CONDR (NO.8) INSULATED | 2,960 LF | $2.25 | $2.21 | $2.11 | -$118 |
Positive: the low bidder was cheaper on that item. These 15 items account for $124,255 of the $124,255 gap.