Bid Tab X-ray: 6498-34-001

Jul 8, 2026 · Collin Sign up free
Set your company to personalize scores

Specialty Markings Handwork 07 0826

6498-34-001 · let Jul 8, 2026 · Collin, Dallas · Routine Maintenance Project - Sealed

$243,687Low bid: STRIPE-A-ZONE, LLC-17.1% vs estimate $293,913
$142,964Left on the table58.7% gap to the second bid
2BiddersSpread 59% low to high
16Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1STRIPE-A-ZONE, LLC $243,687-17.1% $142,964 0 3-$566,100
2TRP INFRASTRUCTURE SERVICES, LLC $386,651+58.7%31.6% 2+$68,842 3-$537,850

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

STRIPE-A-ZONE, LLC vs TRP INFRASTRUCTURE SERVICES, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
666-7244 RE PM TY III (W)(24")(SLD)8,961 LF $8.50$14.50$7.96 $53,766
500-7001 MOBILIZATION1 LS $2,500.00$30,000.00$523,850.32 $27,500
666-7254 RE PM TY III (W)(ARROW)205 EA $250.00$350.00$239.01 $20,500
666-7257 RE PM TY III (W)(WORD)203 EA $290.00$385.00$274.97 $19,285
677-7008 ELIM EXT PM & MRKS (24")2,070 LF $2.00$4.00$2.87 $4,140
677-7015 ELIM EXT PM & MRKS (WORD)203 EA $40.00$60.00$53.95 $4,060
666-7256 RE PM TY III (W)(U-TURN ARROW)38 EA $320.00$425.00$314.79 $3,990
677-7006 ELIM EXT PM & MRKS (12")8,701 LF $2.00$2.45$1.27 $3,915
677-7009 ELIM EXT PM & MRKS (ARROW)205 EA $40.00$55.00$50.50 $3,075
677-7012 ELIM EXT PM & MRKS (UTURN ARROW)38 EA $40.00$75.00$49.92 $1,330
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $250.00$500.00$11,585.04 $750
666-7238 RE PM TY III (W)(6")(DOT)820 LF $1.75$2.50$1.31 $615
677-7004 ELIM EXT PM & MRKS (8")76 LF $1.00$2.00$0.6468 $76
666-7241 RE PM TY III (W)(8")(DOT)76 LF $3.00$2.50$1.31 -$38
505-7003 TMA (MOBILE OPERATION)47 DAY $1.00$1.00$229.60 $0
677-7002 ELIM EXT PM & MRKS (6")820 LF $1.00$1.00$0.2755 $0

Positive: the low bidder was cheaper on that item. These 16 items account for $142,964 of the $142,964 gap.

STRIPE-A-ZONE, LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $2,500.00$523,850.320.00x-$521,350
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $250.00$11,585.040.02x-$34,005
505-7003 TMA (MOBILE OPERATION)47 DAY $1.00$229.600.00x-$10,744

TRP INFRASTRUCTURE SERVICES, LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
666-7244 RE PM TY III (W)(24")(SLD)8,961 LF $14.50$7.961.82x$58,609
677-7006 ELIM EXT PM & MRKS (12")8,701 LF $2.45$1.271.92x$10,232
500-7001 MOBILIZATION1 LS $30,000.00$523,850.320.06x-$493,850
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING3 MO $500.00$11,585.040.04x-$33,255
505-7003 TMA (MOBILE OPERATION)47 DAY $1.00$229.600.00x-$10,744