FM 123 from US 79 to FM 31S
0731-01-058 · let Jul 1, 2026 · Panola, Atlanta · Rehabilitation of Existing Road
$2,441,151Low bid: MADDEN CONTRACTING COMPANY, LLC.+23.7% vs estimate $1,973,068
$11,068Left on the table0.5% gap to the second bid
4BiddersSpread 11% low to high
49Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | MADDEN CONTRACTING COMPANY, LLC. | $2,441,151 | 23.7% | $11,068 | 4+$276,011 | 4-$840,571 | |
| 2 | THK CONSTRUCTION LLC | $2,452,219 | +0.5% | 24.3% | $243,771 | 3+$240,987 | 3-$918,243 |
| 3 | L. S. EQUIPMENT CO., INC. | $2,695,990 | +10.4% | 36.6% | $8,467 | 2+$327,253 | 2-$319,946 |
| 4 | EAST TEXAS BRIDGE, INC. | $2,704,457 | +10.8% | 37.1% | 3+$273,813 | 2-$379,946 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
MADDEN CONTRACTING COMPANY, LLC. vs THK CONSTRUCTION LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 5,548 TON | $160.00 | $183.56 | $138.38 | $130,711 |
| 100-7002 PREPARING ROW | 106.5 STA | $2,470.00 | $1,250.00 | $6,072.92 | -$129,930 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 9,403 SY | $10.00 | $2.20 | $2.13 | -$73,343 |
| 500-7001 MOBILIZATION | 1 LS | $160,000.00 | $190,000.00 | $523,850.32 | $30,000 |
| 316-7007 ASPH (AC-20-5TR) | 7,473 GAL | $7.25 | $10.00 | $3.27 | $20,551 |
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 8,543 SY | $37.04 | $39.04 | $18.50 | $17,086 |
| 132-7017 EMBANK (VEH)(OC)(TY C) | 1,428 CY | $16.00 | $25.00 | $37.09 | $12,852 |
| 160-7007 FURN & PLACE TOPSOIL (VEH) | 1,080 CY | $19.00 | $30.00 | $29.31 | $11,880 |
| 168-7001 VEGETATIVE WATERING | 1,312.7 TGL | $12.00 | $20.00 | $8.43 | $10,502 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $2,600.00 | $1,477.72 | $11,585.04 | -$7,856 |
| 4019-7001 INSTALL BRIDGE IDENTIFICATION NUMBERS | 4 EA | $2,000.00 | $500.00 | $496.17 | -$6,000 |
| 662-7100 WK ZN PAV MRK REMOV (Y)6"(SLD) | 7,015 LF | $1.85 | $1.07 | $0.8371 | -$5,472 |
| 316-7256 AGGR (TY-PB, GR-4) | 54 CY | $500.00 | $400.00 | $243.61 | -$5,400 |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 1,950 LF | $23.50 | $26.13 | $25.60 | $5,129 |
| 112-7001 SUBGR WIDEN (OC) | 109.52 STA | $255.00 | $300.00 | $458.34 | $4,928 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 86 CY | $855.00 | $800.00 | $616.83 | -$4,730 |
| 668-7002 PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE) | 3,118 LF | $5.00 | $3.58 | $2.80 | -$4,428 |
| 666-7309 ALL-WTHER PM TY I (W)6"(SLD)(100MIL) | 31,176 LF | $0.8000 | $0.6600 | $0.6917 | -$4,365 |
| 310-7004 PRIME COAT (MC-30) | 1,689 GAL | $7.50 | $10.00 | $5.35 | $4,223 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 1,000 LF | $3.50 | $7.00 | $3.92 | $3,500 |
Positive: the low bidder was cheaper on that item. These 20 items account for $9,837 of the $11,068 gap.
MADDEN CONTRACTING COMPANY, LLC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 8,543 SY | $37.04 | $18.50 | 2.00x | $158,415 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 9,403 SY | $10.00 | $2.13 | 4.69x | $74,000 |
| 316-7007 ASPH (AC-20-5TR) | 7,473 GAL | $7.25 | $3.27 | 2.22x | $29,752 |
| 316-7256 AGGR (TY-PB, GR-4) | 54 CY | $500.00 | $243.61 | 2.05x | $13,845 |
| 100-7002 PREPARING ROW | 106.5 STA | $2,470.00 | $6,072.92 | 0.41x | -$383,711 |
| 500-7001 MOBILIZATION | 1 LS | $160,000.00 | $523,850.32 | 0.31x | -$363,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $2,600.00 | $11,585.04 | 0.22x | -$62,895 |
| 132-7017 EMBANK (VEH)(OC)(TY C) | 1,428 CY | $16.00 | $37.09 | 0.43x | -$30,114 |
THK CONSTRUCTION LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 8,543 SY | $39.04 | $18.50 | 2.11x | $175,501 |
| 316-7007 ASPH (AC-20-5TR) | 7,473 GAL | $10.00 | $3.27 | 3.06x | $50,303 |
| 168-7001 VEGETATIVE WATERING | 1,312.7 TGL | $20.00 | $8.43 | 2.37x | $15,183 |
| 100-7002 PREPARING ROW | 106.5 STA | $1,250.00 | $6,072.92 | 0.21x | -$513,641 |
| 500-7001 MOBILIZATION | 1 LS | $190,000.00 | $523,850.32 | 0.36x | -$333,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $1,477.72 | $11,585.04 | 0.13x | -$70,751 |
L. S. EQUIPMENT CO., INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 8,543 SY | $52.50 | $18.50 | 2.84x | $290,489 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 9,403 SY | $6.04 | $2.13 | 2.84x | $36,764 |
| 500-7001 MOBILIZATION | 1 LS | $250,000.00 | $523,850.32 | 0.48x | -$273,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $5,000.00 | $11,585.04 | 0.43x | -$46,095 |
EAST TEXAS BRIDGE, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 8,543 SY | $45.00 | $18.50 | 2.43x | $226,417 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 9,403 SY | $5.00 | $2.13 | 2.35x | $26,985 |
| 316-7007 ASPH (AC-20-5TR) | 7,473 GAL | $6.00 | $3.27 | 1.84x | $20,411 |
| 500-7001 MOBILIZATION | 1 LS | $190,000.00 | $523,850.32 | 0.36x | -$333,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $5,000.00 | $11,585.04 | 0.43x | -$46,095 |