FY 26 GR-FM 156/S Blue Mound Rd & IH 820
0718-02-079 · let Jul 2, 2026 · Tarrant, Fort Worth · Landscape & Scenic Enhancement
$159,000Low bid: CENTRAL NORTH CONSTRUCTION, LLC-50.0% vs estimate $318,034
$31,213Left on the table19.6% gap to the second bid
7BiddersSpread 103% low to high
17Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | CENTRAL NORTH CONSTRUCTION, LLC | $159,000 | -50.0% | $31,213 | 1+$35,780 | 8-$682,595 | |
| 2 | C. GREEN SCAPING, L.P. | $190,213 | +19.6% | -40.2% | $24,877 | 2+$35,921 | 5-$627,059 |
| 3 | APEX LANDSCAPE & IRRIGATION, LLC | $215,090 | +35.3% | -32.4% | $36,441 | 0 | 6-$585,857 |
| 4 | TEXAS ROAD CONSTRUCTION, LLC | $251,531 | +58.2% | -20.9% | $17,473 | 2+$19,001 | 6-$603,718 |
| 5 | TIGHT LINE CONSTRUCTION, LLC | $269,004 | +69.2% | -15.4% | $20,336 | 4+$52,932 | 5-$575,134 |
| 6 | GREEN SAGE SERVICES LLC | $289,340 | +82.0% | -9.0% | $34,142 | ||
| 7 | ABESCAPE LANDSCAPING, LLC | $323,482 | +103.4% | 1.7% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
CENTRAL NORTH CONSTRUCTION, LLC vs C. GREEN SCAPING, L.P., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 192-7009 PLANT BED PREP | 590 SY | $3.00 | $28.00 | $4.57 | $14,750 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 19 CY | $2,500.00 | $1,780.00 | $616.83 | -$13,680 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $100.00 | $6,000.00 | $9,253.78 | $11,800 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $500.00 | $4,335.00 | $11,585.04 | $11,505 |
| 432-7053 RIPRAP (SPECIAL) | 65 CY | $250.00 | $358.00 | $567.00 | $7,020 |
| 192-7029 PLANT MATERIAL (5 GAL) | 385 EA | $26.00 | $10.00 | $35.80 | -$6,160 |
| 100-7002 PREPARING ROW | 4.6 STA | $4,500.00 | $3,220.00 | $6,072.92 | -$5,888 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 990 LF | $0.1000 | $6.00 | $4.63 | $5,841 |
| 193-7001 LANDSCAPE ESTABLISH | 12 MO | $1,500.00 | $1,100.00 | $3,715.47 | -$4,800 |
| 193-7007 IRRIG SYS OPER AND MAINT | 12 MO | $500.00 | $900.00 | $1,763.22 | $4,800 |
| 506-7046 BIODEG EROSN CONT LOGS (REMOVE) | 990 LF | $0.1000 | $2.00 | $1.29 | $1,881 |
| 618-7041 CONDT (PVC) (SCH 40) (4") (BORE) | 100 LF | $29.00 | $46.00 | $37.56 | $1,700 |
| 168-7001 VEGETATIVE WATERING | 24 TGL | $18.00 | $84.00 | $8.43 | $1,584 |
| 170-7001 IRRIGATION SYSTEM | 1 LS | $25,690.00 | $26,400.00 | $73,741.57 | $710 |
| 500-7001 MOBILIZATION | 1 LS | $7,700.00 | $7,200.00 | $523,850.32 | -$500 |
| 166-7001 FERTILIZER | 0.5 AC | $100.00 | $900.00 | $717.14 | $400 |
| 620-7007 ELEC CONDR (NO.8) BARE | 100 LF | $1.00 | $3.50 | $1.94 | $250 |
Positive: the low bidder was cheaper on that item. These 17 items account for $31,213 of the $31,213 gap.
CENTRAL NORTH CONSTRUCTION, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 19 CY | $2,500.00 | $616.83 | 4.05x | $35,780 |
| 500-7001 MOBILIZATION | 1 LS | $7,700.00 | $523,850.32 | 0.01x | -$516,150 |
| 170-7001 IRRIGATION SYSTEM | 1 LS | $25,690.00 | $73,741.57 | 0.35x | -$48,052 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $500.00 | $11,585.04 | 0.04x | -$33,255 |
| 193-7001 LANDSCAPE ESTABLISH | 12 MO | $1,500.00 | $3,715.47 | 0.40x | -$26,586 |
| 432-7053 RIPRAP (SPECIAL) | 65 CY | $250.00 | $567.00 | 0.44x | -$20,605 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $100.00 | $9,253.78 | 0.01x | -$18,308 |
| 193-7007 IRRIG SYS OPER AND MAINT | 12 MO | $500.00 | $1,763.22 | 0.28x | -$15,159 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 990 LF | $0.1000 | $4.63 | 0.02x | -$4,482 |
C. GREEN SCAPING, L.P.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 19 CY | $1,780.00 | $616.83 | 2.89x | $22,100 |
| 192-7009 PLANT BED PREP | 590 SY | $28.00 | $4.57 | 6.12x | $13,821 |
| 500-7001 MOBILIZATION | 1 LS | $7,200.00 | $523,850.32 | 0.01x | -$516,650 |
| 170-7001 IRRIGATION SYSTEM | 1 LS | $26,400.00 | $73,741.57 | 0.36x | -$47,342 |
| 193-7001 LANDSCAPE ESTABLISH | 12 MO | $1,100.00 | $3,715.47 | 0.30x | -$31,386 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $4,335.00 | $11,585.04 | 0.37x | -$21,750 |
| 192-7029 PLANT MATERIAL (5 GAL) | 385 EA | $10.00 | $35.80 | 0.28x | -$9,931 |
APEX LANDSCAPE & IRRIGATION, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $20,500.00 | $523,850.32 | 0.04x | -$503,350 |
| 193-7001 LANDSCAPE ESTABLISH | 12 MO | $1,300.00 | $3,715.47 | 0.35x | -$28,986 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $5,000.00 | $11,585.04 | 0.43x | -$19,755 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $100.00 | $9,253.78 | 0.01x | -$18,308 |
| 193-7007 IRRIG SYS OPER AND MAINT | 12 MO | $700.00 | $1,763.22 | 0.40x | -$12,759 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 990 LF | $1.90 | $4.63 | 0.41x | -$2,700 |
TEXAS ROAD CONSTRUCTION, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 19 CY | $1,200.00 | $616.83 | 1.95x | $11,080 |
| 192-7009 PLANT BED PREP | 590 SY | $18.00 | $4.57 | 3.93x | $7,921 |
| 500-7001 MOBILIZATION | 1 LS | $27,000.00 | $523,850.32 | 0.05x | -$496,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $1,500.00 | $11,585.04 | 0.13x | -$30,255 |
| 100-7002 PREPARING ROW | 4.6 STA | $1.00 | $6,072.92 | 0.00x | -$27,931 |
| 193-7001 LANDSCAPE ESTABLISH | 12 MO | $1,500.00 | $3,715.47 | 0.40x | -$26,586 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $1.00 | $9,253.78 | 0.00x | -$18,506 |
| 506-7043 BIODEG EROSN CONT LOGS (INSTL) (8") | 990 LF | $1.00 | $4.63 | 0.22x | -$3,591 |
TIGHT LINE CONSTRUCTION, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 432-7053 RIPRAP (SPECIAL) | 65 CY | $1,000.00 | $567.00 | 1.76x | $28,145 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 19 CY | $1,500.00 | $616.83 | 2.43x | $16,780 |
| 620-7007 ELEC CONDR (NO.8) BARE | 100 LF | $50.00 | $1.94 | 25.72x | $4,806 |
| 192-7009 PLANT BED PREP | 590 SY | $10.00 | $4.57 | 2.19x | $3,201 |
| 500-7001 MOBILIZATION | 1 LS | $30,000.00 | $523,850.32 | 0.06x | -$493,850 |
| 193-7001 LANDSCAPE ESTABLISH | 12 MO | $1,250.00 | $3,715.47 | 0.34x | -$29,586 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $4,000.00 | $11,585.04 | 0.35x | -$22,755 |
| 100-7002 PREPARING ROW | 4.6 STA | $2,500.00 | $6,072.92 | 0.41x | -$16,435 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $3,000.00 | $9,253.78 | 0.32x | -$12,508 |