US 281 SB over SH 79 SB FM 369 Connector
0249-01-053 · let Jul 2, 2026 · Wichita, Wichita Falls · Bridge Maintenance
$1,719,201Low bid: ICOS MANAGEMENT, LLC-16.6% vs estimate $2,062,358
$125,846Left on the table7.3% gap to the second bid
10BiddersSpread 36% low to high
244Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ICOS MANAGEMENT, LLC | $1,719,201 | -16.6% | $125,846 | 3+$69,672 | 3-$569,669 | |
| 2 | GHB EQUIPMENT COMPANY, L.L.C. | $1,845,048 | +7.3% | -10.5% | $117,421 | 5+$169,654 | 1-$398,850 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $1,962,469 | +14.2% | -4.8% | $15,271 | 3+$47,715 | 2-$433,116 |
| 4 | SCR CIVIL CONSTRUCTION, LLC | $1,977,740 | +15.0% | -4.1% | $33,248 | 7+$294,695 | 2-$430,691 |
| 5 | BLACKSMITH VENTURES LLC | $2,010,989 | +17.0% | -2.5% | $5,011 | 6+$441,833 | 3-$457,015 |
| 6 | TI-ZACK CONCRETE, LLC | $2,016,000 | +17.3% | -2.2% | $102,149 | ||
| 7 | ALTUS CONSTRUCTION LLC | $2,118,149 | +23.2% | 2.7% | $146,817 | ||
| 8 | THK CONSTRUCTION LLC | $2,264,967 | +31.7% | 9.8% | $12,990 | ||
| 9 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $2,277,957 | +32.5% | 10.5% | $57,467 | ||
| 10 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $2,335,424 | +35.8% | 13.2% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
ICOS MANAGEMENT, LLC vs GHB EQUIPMENT COMPANY, L.L.C., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 1,825 SF | $136.50 | $84.00 | $95.74 | -$95,813 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 MO | $1.10 | $7,500.00 | $11,585.04 | $67,490 |
| 500-7001 MOBILIZATION | 1 LS | $72,500.00 | $125,000.00 | $523,850.32 | $52,500 |
| 428-7001 PENETRATING CONCRETE SURFACE TREATMENT | 1,838 SY | $10.50 | $38.95 | $10.07 | $52,291 |
| 429-7005 CONC STR REPAIR(DECK REP (FULL DEPTH)) | 1,000 SF | $157.50 | $195.00 | $192.68 | $37,500 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 1,005 SF | $94.50 | $120.00 | $150.68 | $25,628 |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,280 LF | $47.25 | $28.00 | $38.57 | -$24,640 |
| 505-7001 TMA (STATIONARY) | 80 DAY | $262.50 | $550.00 | $217.57 | $23,000 |
| 512-7029 PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,500 LF | $31.50 | $40.00 | $9.04 | $12,750 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 30 DAY | $210.00 | $550.00 | $87.82 | $10,200 |
| 778-7001 CONCRETE RAIL REPAIR (IN-KIND) | 80 LF | $525.00 | $400.00 | $380.94 | -$10,000 |
| 104-7004 REMOV CONC (MOWSTRIP) | 238 CY | $21.00 | $60.00 | $80.09 | $9,282 |
| 442-7017 MISC NON-BRIDGE (NBIS) | 40 LB | $262.50 | $70.00 | $47.98 | -$7,700 |
| 540-7005 MTL BEAM GD FEN TRANS (THRIE-BEAM) | 19 EA | $2,100.00 | $1,708.00 | $2,218.70 | -$7,448 |
| 785-7009 BRIDGE JOINT REPLACEMENT (CONCRETE) | 640 LF | $210.00 | $200.00 | $319.55 | -$6,400 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 19 EA | $3,780.00 | $3,472.00 | $3,190.07 | -$5,852 |
| 432-7012 RIPRAP (CONC)(FLUME) | 40 CY | $735.00 | $600.00 | $674.93 | -$5,400 |
| 544-7003 GUARDRAIL END TREATMENT (REMOVE) | 17 EA | $525.00 | $224.00 | $284.94 | -$5,117 |
| 545-7002 CRASH CUSH ATTEN (MOVE & RESET) | 3 EA | $1,575.00 | $2,800.00 | $1,471.00 | $3,675 |
| 432-7055 RIPRAP (CONC)(CL B)(RR8&RR9) | 10 CY | $945.00 | $600.00 | $725.38 | -$3,450 |
Positive: the low bidder was cheaper on that item. These 20 items account for $122,496 of the $125,846 gap.
ICOS MANAGEMENT, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 512-7029 PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,500 LF | $31.50 | $9.04 | 3.48x | $33,691 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 500 LF | $94.50 | $40.65 | 2.32x | $26,926 |
| 512-7053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 500 LF | $31.50 | $13.39 | 2.35x | $9,055 |
| 500-7001 MOBILIZATION | 1 LS | $72,500.00 | $523,850.32 | 0.14x | -$451,350 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 MO | $1.10 | $11,585.04 | 0.00x | -$104,255 |
| 104-7004 REMOV CONC (MOWSTRIP) | 238 CY | $21.00 | $80.09 | 0.26x | -$14,064 |
GHB EQUIPMENT COMPANY, L.L.C.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 428-7001 PENETRATING CONCRETE SURFACE TREATMENT | 1,838 SY | $38.95 | $10.07 | 3.87x | $53,077 |
| 512-7029 PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,500 LF | $40.00 | $9.04 | 4.43x | $46,441 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 500 LF | $100.00 | $40.65 | 2.46x | $29,676 |
| 505-7001 TMA (STATIONARY) | 80 DAY | $550.00 | $217.57 | 2.53x | $26,594 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 30 DAY | $550.00 | $87.82 | 6.26x | $13,865 |
| 500-7001 MOBILIZATION | 1 LS | $125,000.00 | $523,850.32 | 0.24x | -$398,850 |
GARRET SHIELDS INFRASTRUCTURE: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 500 LF | $80.00 | $40.65 | 1.97x | $19,676 |
| 512-7029 PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,500 LF | $20.00 | $9.04 | 2.21x | $16,441 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 5,377 LF | $5.00 | $2.84 | 1.76x | $11,598 |
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $523,850.32 | 0.29x | -$373,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 MO | $5,000.00 | $11,585.04 | 0.43x | -$59,265 |
SCR CIVIL CONSTRUCTION, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 428-7001 PENETRATING CONCRETE SURFACE TREATMENT | 1,838 SY | $78.00 | $10.07 | 7.74x | $124,851 |
| 104-7004 REMOV CONC (MOWSTRIP) | 238 CY | $302.00 | $80.09 | 3.77x | $52,814 |
| 512-7053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 500 LF | $65.00 | $13.39 | 4.85x | $25,805 |
| 432-7012 RIPRAP (CONC)(FLUME) | 40 CY | $1,295.00 | $674.93 | 1.92x | $24,803 |
| 512-7029 PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,500 LF | $24.25 | $9.04 | 2.68x | $22,816 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 500 LF | $86.00 | $40.65 | 2.12x | $22,676 |
| 401-7001 FLOWABLE BACKFILL | 40 CY | $822.00 | $298.77 | 2.75x | $20,929 |
| 500-7001 MOBILIZATION | 1 LS | $163,900.00 | $523,850.32 | 0.31x | -$359,950 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 MO | $3,725.00 | $11,585.04 | 0.32x | -$70,740 |
BLACKSMITH VENTURES LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 451-7024 RETROFIT RAIL (TY SSTR) | 768 LF | $557.22 | $175.01 | 3.18x | $293,537 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 500 LF | $205.00 | $40.65 | 5.04x | $82,176 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 30 DAY | $1,000.00 | $87.82 | 11.39x | $27,365 |
| 505-7001 TMA (STATIONARY) | 80 DAY | $425.00 | $217.57 | 1.95x | $16,594 |
| 512-7029 PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,500 LF | $17.00 | $9.04 | 1.88x | $11,941 |
| 545-7014 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 EA | $19,000.00 | $8,780.51 | 2.16x | $10,219 |
| 500-7001 MOBILIZATION | 1 LS | $181,000.00 | $523,850.32 | 0.35x | -$342,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 MO | $300.00 | $11,585.04 | 0.03x | -$101,565 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 5,377 LF | $0.5000 | $2.84 | 0.18x | -$12,599 |