Districtwide Concrete Repair FY 26
6484-37-001 · let Jul 2, 2026 · Travis, Austin · Routine Maintenance Project - Sealed
$756,200Low bid: ROY JORGENSEN ASSOCIATES, INC.-35.9% vs estimate $1,178,810
$431,480Left on the table57.1% gap to the second bid
3BiddersSpread 69% low to high
26Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ROY JORGENSEN ASSOCIATES, INC. | $756,200 | -35.9% | $431,480 | 5+$184,204 | 4-$601,666 | |
| 2 | DIGG COMMERCIAL, LLC | $1,187,680 | +57.1% | 0.8% | $87,320 | 2+$276,231 | 2-$78,264 |
| 3 | TAYLOR BRIDGE LLC | $1,275,000 | +68.6% | 8.2% | 9+$327,561 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
ROY JORGENSEN ASSOCIATES, INC. vs DIGG COMMERCIAL, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 361-7008 FULL - DEPTH REPAIR CRCP (13") | 500 CY | $250.00 | $700.00 | $1,085.51 | $225,000 |
| 505-7001 TMA (STATIONARY) | 150 DAY | $1,100.00 | $2,000.00 | $217.57 | $135,000 |
| 361-7009 FULL - DEPTH REPAIR CRCP (14") | 100 CY | $250.00 | $750.00 | $895.70 | $50,000 |
| 429-7008 CONC STR REPR(RAPID VERT AND OVERHEAD) | 800 SF | $250.00 | $200.00 | $198.67 | -$40,000 |
| 500-7002 MOBILIZATION (CALLOUT) | 30 EA | $1,200.00 | $1.00 | $600.85 | -$35,970 |
| 361-7005 FULL - DEPTH REPAIR CRCP (10") | 100 CY | $250.00 | $600.00 | $1,202.68 | $35,000 |
| 361-7006 FULL - DEPTH REPAIR CRCP (11") | 50 CY | $250.00 | $650.00 | $731.43 | $20,000 |
| 720-7003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID) | 250 GAL | $50.00 | $100.00 | $72.23 | $12,500 |
| 778-7001 CONCRETE RAIL REPAIR (IN-KIND) | 100 LF | $450.00 | $560.00 | $380.94 | $11,000 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $20,000.00 | $15,000.00 | $9,253.78 | -$10,000 |
| 713-7005 LONGT CRACK CLEANING AND SEALING (CRCP) | 250 LF | $20.00 | $50.00 | $14.53 | $7,500 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 20 CY | $650.00 | $1,000.00 | $616.83 | $7,000 |
| 104-7029 REMOV CONC (HEADWALL) | 5 CY | $2,000.00 | $1,000.00 | $433.45 | -$5,000 |
| 104-7006 REMOV CONC (RIPRAP) | 100 SY | $20.00 | $50.00 | $14.32 | $3,000 |
| 104-7017 REMOV CONC (CURB & GUTTER) | 100 LF | $20.00 | $50.00 | $8.04 | $3,000 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 150 LF | $1.00 | $20.00 | $3.92 | $2,850 |
| 429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT)) | 50 SF | $150.00 | $200.00 | $153.06 | $2,500 |
| 110-7001 EXCAV (ROADWAY) | 30 CY | $20.00 | $100.00 | $11.68 | $2,400 |
| 529-7008 CONC CURB & GUTTER (TY I) | 100 LF | $20.00 | $35.00 | $25.20 | $1,500 |
| 529-7009 CONC CURB & GUTTER (TY II) | 50 LF | $20.00 | $50.00 | $32.57 | $1,500 |
Positive: the low bidder was cheaper on that item. These 20 items account for $428,780 of the $431,480 gap.
ROY JORGENSEN ASSOCIATES, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 150 DAY | $1,100.00 | $217.57 | 5.06x | $132,364 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $20,000.00 | $9,253.78 | 2.16x | $21,492 |
| 500-7002 MOBILIZATION (CALLOUT) | 30 EA | $1,200.00 | $600.85 | 2.00x | $17,975 |
| 104-7029 REMOV CONC (HEADWALL) | 5 CY | $2,000.00 | $433.45 | 4.61x | $7,833 |
| 422-7003 REINF CONC SLAB (EXTEND SLAB) | 200 SF | $50.00 | $27.30 | 1.83x | $4,540 |
| 361-7008 FULL - DEPTH REPAIR CRCP (13") | 500 CY | $250.00 | $1,085.51 | 0.23x | -$417,756 |
| 361-7005 FULL - DEPTH REPAIR CRCP (10") | 100 CY | $250.00 | $1,202.68 | 0.21x | -$95,268 |
| 361-7009 FULL - DEPTH REPAIR CRCP (14") | 100 CY | $250.00 | $895.70 | 0.28x | -$64,570 |
| 361-7006 FULL - DEPTH REPAIR CRCP (11") | 50 CY | $250.00 | $731.43 | 0.34x | -$24,072 |
DIGG COMMERCIAL, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 150 DAY | $2,000.00 | $217.57 | 9.19x | $267,364 |
| 713-7005 LONGT CRACK CLEANING AND SEALING (CRCP) | 250 LF | $50.00 | $14.53 | 3.44x | $8,867 |
| 361-7005 FULL - DEPTH REPAIR CRCP (10") | 100 CY | $600.00 | $1,202.68 | 0.50x | -$60,268 |
| 500-7002 MOBILIZATION (CALLOUT) | 30 EA | $1.00 | $600.85 | 0.00x | -$17,995 |
TAYLOR BRIDGE LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 150 DAY | $1,000.00 | $217.57 | 4.60x | $117,364 |
| 500-7002 MOBILIZATION (CALLOUT) | 30 EA | $2,500.00 | $600.85 | 4.16x | $56,975 |
| 720-7003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID) | 250 GAL | $250.00 | $72.23 | 3.46x | $44,442 |
| 778-7001 CONCRETE RAIL REPAIR (IN-KIND) | 100 LF | $750.00 | $380.94 | 1.97x | $36,906 |
| 713-7005 LONGT CRACK CLEANING AND SEALING (CRCP) | 250 LF | $100.00 | $14.53 | 6.88x | $21,367 |
| 429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT)) | 50 SF | $500.00 | $153.06 | 3.27x | $17,347 |
| 422-7003 REINF CONC SLAB (EXTEND SLAB) | 200 SF | $100.00 | $27.30 | 3.66x | $14,540 |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 100 SF | $200.00 | $85.28 | 2.35x | $11,472 |
| 110-7001 EXCAV (ROADWAY) | 30 CY | $250.00 | $11.68 | 21.40x | $7,150 |