IH 45 E of US 287 to Ellis County Line
0092-06-111 · let Aug 5, 2026 · Navarro, Dallas · Rehabilitation of Existing Road
$5,407,398Low bid: ROY JORGENSEN ASSOCIATES, INC.-18.7% vs estimate $6,654,791
$591,241Left on the table10.9% gap to the second bid
6BiddersSpread 47% low to high
111Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ROY JORGENSEN ASSOCIATES, INC. | $5,407,398 | -18.7% | $591,241 | 2+$308,020 | 1-$40,261 | |
| 2 | WINDING ROAD CONSTRUCTION, INC. | $5,998,639 | +10.9% | -9.9% | $249,739 | 1+$231,546 | 1-$40,261 |
| 3 | O. TREVINO CONSTRUCTION, LLC | $6,248,378 | +15.6% | -6.1% | $651,340 | 2+$531,217 | 1-$48,976 |
| 4 | DIGG COMMERCIAL, LLC | $6,899,718 | +27.6% | 3.7% | $286,213 | 2+$534,164 | 1-$48,976 |
| 5 | STRUCTURAL INTEGRITY GROUP LLC | $7,185,931 | +32.9% | 8.0% | $742,788 | 2+$338,591 | 1-$48,976 |
| 6 | GARRET SHIELDS INFRASTRUCTURE | $7,928,719 | +46.6% | 19.1% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
ROY JORGENSEN ASSOCIATES, INC. vs WINDING ROAD CONSTRUCTION, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 361-7073 FULL-DEPTH REPAIR CRCP(12"-14") | 3,508 SY | $250.00 | $384.00 | $250.00 | $470,072 |
| 361-7074 FULL-DEPTH REPAIR CPCD(12"-14") | 1,812 SY | $225.00 | $364.00 | $225.00 | $251,868 |
| 505-7001 TMA (STATIONARY) | 160 DAY | $750.00 | $75.00 | $217.57 | -$108,000 |
| 721-7001 FIBER REINFORCED POLYMER PATCHING MATLS | 633,600 LB | $3.30 | $3.18 | $4.41 | -$76,032 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $12,000.00 | $17,000.00 | $11,585.04 | $35,000 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $6,500.00 | $17,000.00 | $9,253.78 | $21,000 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 1,625 EA | $1.25 | $10.00 | $1.03 | $14,219 |
| 666-7236 RE PM TY III (W)(6")(SLD) | 353,563 LF | $0.5900 | $0.5600 | $0.6919 | -$10,607 |
| 677-7001 ELIM EXT PM & MRKS (4") | 871,458 LF | $0.5200 | $0.5300 | $0.2643 | $8,715 |
| 666-7248 RE PM TY III (Y)(6")(SLD) | 353,356 LF | $0.5900 | $0.5700 | $0.7409 | -$7,067 |
| 500-7001 MOBILIZATION | 1 LS | $540,000.00 | $535,000.00 | $523,850.32 | -$5,000 |
| 666-7237 RE PM TY III (W)(6")(BRK) | 162,199 LF | $0.6600 | $0.6300 | $0.7099 | -$4,866 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 800 LF | $5.00 | $10.00 | $5.23 | $4,000 |
| 666-7242 RE PM TY III (W)(12")(SLD) | 18,074 LF | $3.91 | $3.73 | $2.62 | -$3,253 |
| 506-7041 TEMP SEDMT CONT FENCE (REMOVE) | 800 LF | $1.00 | $5.00 | $1.02 | $3,200 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 800 LF | $4.00 | $7.50 | $3.92 | $2,800 |
| 672-7006 REFL PAV MRKR TY II-C-R | 12,085 EA | $4.95 | $4.73 | $4.19 | -$2,659 |
| 662-7113 WK ZN PAV MRK SHT TERM (TAB)TY Y | 300 EA | $1.25 | $10.00 | $1.11 | $2,625 |
| 666-7239 RE PM TY III (W)(8")(SLD) | 51,814 LF | $1.03 | $0.9800 | $1.06 | -$2,591 |
| 677-7004 ELIM EXT PM & MRKS (8") | 51,814 LF | $0.7200 | $0.6800 | $0.6468 | -$2,073 |
Positive: the low bidder was cheaper on that item. These 20 items account for $591,351 of the $591,241 gap.