Bid Tab X-ray: 6507-01-001

Aug 18, 2026 · San Patricio Sign up free
Set your company to personalize scores

6507-01-001 LRA Sinton Maint.

6507-01-001 · let Aug 18, 2026 · San Patricio, Corpus Christi · Material Maintenance Project

$364,080Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+4.6% vs estimate $348,000
$8,850Left on the table2.4% gap to the second bid
2BiddersSpread 2% low to high
1Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1VULCAN CONSTRUCTION MATERIALS, LLC $364,0804.6% $8,850 0 0
2MARTIN MARIETTA MATERIALS, INC. $372,930+2.4%7.2% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8001-7107 LRA (TY II GR DS) (DEL) (ST1)3,000 TON $121.36$124.31$125.06 $8,850

Positive: the low bidder was cheaper on that item. These 1 items account for $8,850 of the $8,850 gap.