BPM- Districtwide
6506-40-001 · let Aug 20, 2026 · Houston, Lufkin · Bridge Preventative Maintenance
$582,580Low bid: BLACKSMITH VENTURES LLC-37.9% vs estimate $938,493
$49,770Left on the table8.5% gap to the second bid
10BiddersSpread 98% low to high
22Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BLACKSMITH VENTURES LLC | $582,580 | -37.9% | $49,770 | 8+$110,468 | 7-$648,722 | |
| 2 | GARRET SHIELDS INFRASTRUCTURE | $632,350 | +8.5% | -32.6% | $66,224 | 2+$67,101 | 2-$500,190 |
| 3 | MACIAS SPECIALTY CONTRACTING LLC | $698,574 | +19.9% | -25.6% | $37,746 | 8+$61,653 | 1-$443,850 |
| 4 | C & W SOUTHERN LLC | $736,320 | +26.4% | -21.5% | $54,119 | 6+$110,599 | 2-$491,190 |
| 5 | REAR CONTRACTORS LLC | $790,439 | +35.7% | -15.8% | $14,580 | 7+$162,339 | 2-$500,186 |
| 6 | ACE CONTRACTORS, INC. | $805,019 | +38.2% | -14.2% | $75,051 | ||
| 7 | THK CONSTRUCTION LLC | $880,070 | +51.1% | -6.2% | $18,445 | ||
| 8 | CROSS PLUS CONSTRUCTION, LLC | $898,515 | +54.2% | -4.3% | $99,911 | ||
| 9 | STRUCTURAL INTEGRITY GROUP LLC | $998,426 | +71.4% | 6.4% | $152,658 | ||
| 10 | PREMIER CONTRACTORS LLC | $1,151,084 | +97.6% | 22.7% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
BLACKSMITH VENTURES LLC vs GARRET SHIELDS INFRASTRUCTURE, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1.00 | $50,000.00 | $523,850.32 | $49,999 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 1,583 LF | $20.00 | $50.00 | $15.92 | $47,490 |
| 480-7001 CLEAN EXIST CULVERTS | 4 EA | $15,000.00 | $5,000.00 | $1,712.97 | -$40,000 |
| 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT) | 450 LF | $0.7500 | $50.00 | $76.83 | $22,163 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1.00 | $5,000.00 | $11,585.04 | $19,996 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 367 SF | $250.00 | $200.00 | $150.68 | -$18,350 |
| 505-7001 TMA (STATIONARY) | 60 DAY | $108.00 | $300.00 | $217.57 | $11,520 |
| 432-7034 RIPRAP (STONE COMMON)(DRY)(24 IN) | 1,430 CY | $208.00 | $200.00 | $209.53 | -$11,440 |
| 401-7001 FLOWABLE BACKFILL | 15 CY | $1,000.00 | $300.00 | $298.77 | -$10,500 |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 20 SF | $675.00 | $150.00 | $95.74 | -$10,500 |
| 735-7061 DRIFTWOOD REMOVAL | 10 LS | $1,000.00 | $2,000.00 | $3,574.63 | $10,000 |
| 785-7008 BRIDGE JOINT REPAIR (PARTIAL DEPTH) | 30 LF | $475.00 | $150.00 | $254.54 | -$9,750 |
| 104-7006 REMOV CONC (RIPRAP) | 80 SY | $125.00 | $20.00 | $14.32 | -$8,400 |
| 786-7001 CARBON FIBER REINF POLYMER PROTECTION | 10 SF | $1,000.00 | $200.00 | $72.02 | -$8,000 |
| 780-7003 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) | 200 LF | $0.7500 | $40.00 | $46.07 | $7,850 |
| 132-7017 EMBANK (VEH)(OC)(TY C) | 100 CY | $105.00 | $30.00 | $37.09 | -$7,500 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 1,000 LF | $1.00 | $5.00 | $3.92 | $4,000 |
| 162-7002 BLOCK SODDING | 500 SY | $5.00 | $10.00 | $4.39 | $2,500 |
| 778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND) | 10 LF | $750.00 | $500.00 | $382.36 | -$2,500 |
| 506-7041 TEMP SEDMT CONT FENCE (REMOVE) | 1,000 LF | $0.2500 | $1.00 | $1.02 | $750 |
Positive: the low bidder was cheaper on that item. These 20 items account for $49,328 of the $49,770 gap.
BLACKSMITH VENTURES LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 480-7001 CLEAN EXIST CULVERTS | 4 EA | $15,000.00 | $1,712.97 | 8.76x | $53,148 |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 20 SF | $675.00 | $95.74 | 7.05x | $11,585 |
| 401-7001 FLOWABLE BACKFILL | 15 CY | $1,000.00 | $298.77 | 3.35x | $10,519 |
| 786-7001 CARBON FIBER REINF POLYMER PROTECTION | 10 SF | $1,000.00 | $72.02 | 13.89x | $9,280 |
| 104-7006 REMOV CONC (RIPRAP) | 80 SY | $125.00 | $14.32 | 8.73x | $8,855 |
| 132-7017 EMBANK (VEH)(OC)(TY C) | 100 CY | $105.00 | $37.09 | 2.83x | $6,791 |
| 785-7008 BRIDGE JOINT REPAIR (PARTIAL DEPTH) | 30 LF | $475.00 | $254.54 | 1.87x | $6,614 |
| 778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND) | 10 LF | $750.00 | $382.36 | 1.96x | $3,676 |
| 500-7001 MOBILIZATION | 1 LS | $1.00 | $523,850.32 | 0.00x | -$523,849 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1.00 | $11,585.04 | 0.00x | -$46,336 |
| 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT) | 450 LF | $0.7500 | $76.83 | 0.01x | -$34,236 |
| 735-7061 DRIFTWOOD REMOVAL | 10 LS | $1,000.00 | $3,574.63 | 0.28x | -$25,746 |
| 780-7003 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) | 200 LF | $0.7500 | $46.07 | 0.02x | -$9,064 |
| 505-7001 TMA (STATIONARY) | 60 DAY | $108.00 | $217.57 | 0.50x | -$6,574 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 1,000 LF | $1.00 | $3.92 | 0.26x | -$2,916 |
GARRET SHIELDS INFRASTRUCTURE: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 1,583 LF | $50.00 | $15.92 | 3.14x | $53,953 |
| 480-7001 CLEAN EXIST CULVERTS | 4 EA | $5,000.00 | $1,712.97 | 2.92x | $13,148 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $5,000.00 | $11,585.04 | 0.43x | -$26,340 |
MACIAS SPECIALTY CONTRACTING LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 1,583 LF | $28.00 | $15.92 | 1.76x | $19,127 |
| 786-7001 CARBON FIBER REINF POLYMER PROTECTION | 10 SF | $950.00 | $72.02 | 13.19x | $8,780 |
| 785-7008 BRIDGE JOINT REPAIR (PARTIAL DEPTH) | 30 LF | $500.00 | $254.54 | 1.96x | $7,364 |
| 480-7001 CLEAN EXIST CULVERTS | 4 EA | $3,500.00 | $1,712.97 | 2.04x | $7,148 |
| 162-7002 BLOCK SODDING | 500 SY | $15.00 | $4.39 | 3.42x | $5,306 |
| 104-7006 REMOV CONC (RIPRAP) | 80 SY | $80.00 | $14.32 | 5.59x | $5,255 |
| 778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND) | 10 LF | $900.00 | $382.36 | 2.35x | $5,176 |
| 168-7001 VEGETATIVE WATERING | 30 TGL | $125.00 | $8.43 | 14.82x | $3,497 |
| 500-7001 MOBILIZATION | 1 LS | $80,000.00 | $523,850.32 | 0.15x | -$443,850 |
C & W SOUTHERN LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 1,583 LF | $40.00 | $15.92 | 2.51x | $38,123 |
| 480-7001 CLEAN EXIST CULVERTS | 4 EA | $10,000.00 | $1,712.97 | 5.84x | $33,148 |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 20 SF | $750.00 | $95.74 | 7.83x | $13,085 |
| 780-7003 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) | 200 LF | $100.00 | $46.07 | 2.17x | $10,786 |
| 786-7001 CARBON FIBER REINF POLYMER PROTECTION | 10 SF | $1,000.00 | $72.02 | 13.89x | $9,280 |
| 778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND) | 10 LF | $1,000.00 | $382.36 | 2.62x | $6,176 |
| 500-7001 MOBILIZATION | 1 LS | $65,000.00 | $523,850.32 | 0.12x | -$458,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $3,500.00 | $11,585.04 | 0.30x | -$32,340 |
REAR CONTRACTORS LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 367 SF | $300.00 | $150.68 | 1.99x | $54,800 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 1,583 LF | $45.00 | $15.92 | 2.83x | $46,038 |
| 480-7001 CLEAN EXIST CULVERTS | 4 EA | $10,000.00 | $1,712.97 | 5.84x | $33,148 |
| 780-7003 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) | 200 LF | $100.00 | $46.07 | 2.17x | $10,786 |
| 778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND) | 10 LF | $1,000.00 | $382.36 | 2.62x | $6,176 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 1,000 LF | $10.00 | $3.92 | 2.55x | $6,084 |
| 162-7002 BLOCK SODDING | 500 SY | $15.00 | $4.39 | 3.42x | $5,306 |
| 500-7001 MOBILIZATION | 1 LS | $70,000.00 | $523,850.32 | 0.13x | -$453,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1.00 | $11,585.04 | 0.00x | -$46,336 |