Picnic Area Maint-Lamar FY27
6504-88-001 · let Aug 20, 2026 · Lamar, Paris · Routine Maintenance Project - Sealed
$115,686Low bid: KJRM GENERAL CONTRACTORS, LLC-11.8% vs estimate $131,125
$1,764Left on the table1.5% gap to the second bid
2BiddersSpread 2% low to high
7Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | KJRM GENERAL CONTRACTORS, LLC | $115,686 | -11.8% | $1,764 | 1+$27,851 | 2-$529,721 | |
| 2 | ADVANCED BARRICADES OF AMERICA, LLC | $117,450 | +1.5% | -10.4% | 2+$59,441 | 3-$566,071 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
KJRM GENERAL CONTRACTORS, LLC vs ADVANCED BARRICADES OF AMERICA, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 745-7040 JANITORIAL MAINT (PICNIC AREAS) | 107 CYC | $475.00 | $150.00 | $534.11 | -$34,775 |
| 751-7028 MOWING, TRIMMING, AND EDGING | 16 CYC | $700.00 | $2,250.00 | $575.58 | $24,800 |
| 745-7017 GROUNDS MAINT (MOWING / TRIMMING) | 16 CYC | $1,950.00 | $2,250.00 | $209.33 | $4,800 |
| 500-7001 MOBILIZATION | 1 LS | $250.00 | $3,500.00 | $523,850.32 | $3,250 |
| 751-7019 LITTER PICKUP | 24 CYC | $800.46 | $900.00 | $609.09 | $2,389 |
| 751-7008 PRUNING | 1 CYC | $1,000.00 | $2,500.00 | $7,121.14 | $1,500 |
| 751-7011 LEAF REMOVAL | 2 CYC | $1,000.00 | $900.00 | $69.30 | -$200 |
Positive: the low bidder was cheaper on that item. These 7 items account for $1,764 of the $1,764 gap.
KJRM GENERAL CONTRACTORS, LLC: unbalanced items
Placed 1ADVANCED BARRICADES OF AMERICA, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 745-7017 GROUNDS MAINT (MOWING / TRIMMING) | 16 CYC | $2,250.00 | $209.33 | 10.75x | $32,651 |
| 751-7028 MOWING, TRIMMING, AND EDGING | 16 CYC | $2,250.00 | $575.58 | 3.91x | $26,791 |
| 500-7001 MOBILIZATION | 1 LS | $3,500.00 | $523,850.32 | 0.01x | -$520,350 |
| 745-7040 JANITORIAL MAINT (PICNIC AREAS) | 107 CYC | $150.00 | $534.11 | 0.28x | -$41,100 |
| 751-7008 PRUNING | 1 CYC | $2,500.00 | $7,121.14 | 0.35x | -$4,621 |