On Call Ditch and Culvert FY27 GAO
6502-67-001 · let Aug 20, 2026 · Hunt, Paris · Routine Maintenance Project - Sealed
$380,291Low bid: TEXAS DRAINAGE INC.-42.2% vs estimate $658,000
$276,749Left on the table72.8% gap to the second bid
3BiddersSpread 94% low to high
4Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS DRAINAGE INC. | $380,291 | -42.2% | $276,749 | 0 | 3-$451,254 | |
| 2 | ADVANCED BARRICADES OF AMERICA, LLC | $657,040 | +72.8% | -0.1% | $80,160 | 1+$22,790 | 2-$425,296 |
| 3 | CATOCON, INC. | $737,200 | +93.9% | 12.0% | 1+$71,297 | 2-$429,643 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
TEXAS DRAINAGE INC. vs ADVANCED BARRICADES OF AMERICA, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 760-7001 DITCH CLEANING AND RESHAPING (FOOT) | 200,000 LF | $1.68 | $2.82 | $1.96 | $228,000 |
| 500-7002 MOBILIZATION (CALLOUT) | 12 EA | $0.9900 | $2,500.00 | $600.85 | $29,988 |
| 480-7001 CLEAN EXIST CULVERTS | 280 EA | $158.00 | $225.00 | $1,712.97 | $18,760 |
| 505-7001 TMA (STATIONARY) | 40 DAY | $0.9900 | $1.00 | $217.57 | $0 |
Positive: the low bidder was cheaper on that item. These 4 items account for $276,749 of the $276,749 gap.