US 80 at Big Brushy Creek
0095-04-079 · let Aug 5, 2026 · Kaufman, Dallas · Bridge Maintenance
$799,617Low bid: SHALOM SERVICES CORPORATION-38.0% vs estimate $1,290,273
$34,326Left on the table4.3% gap to the second bid
10BiddersSpread 125% low to high
29Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | SHALOM SERVICES CORPORATION | $799,617 | -38.0% | $34,326 | 0 | 7-$624,093 | |
| 2 | JACKSON EXCAVATION, LLC | $833,943 | +4.3% | -35.4% | $198,692 | 3+$31,867 | 7-$626,983 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $1,032,635 | +29.1% | -20.0% | $42,685 | 2+$12,548 | 4-$471,409 |
| 4 | ICOS MANAGEMENT, LLC | $1,075,320 | +34.5% | -16.7% | $40,235 | 2+$14,085 | 6-$475,926 |
| 5 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $1,115,555 | +39.5% | -13.5% | $36,498 | 4+$99,311 | 3-$456,882 |
| 6 | TUCAN CONTRACTING, LLC | $1,152,052 | +44.1% | -10.7% | $26,618 | ||
| 7 | HIGHWAY 19 CONSTRUCTION LLC | $1,178,670 | +47.4% | -8.6% | $99,554 | ||
| 8 | ROAD DOCTORS LLC | $1,278,224 | +59.9% | -0.9% | $9,526 | ||
| 9 | PMCO CONSTRUCTION LLC | $1,287,749 | +61.0% | -0.2% | $508,186 | ||
| 10 | SCOUT 5 CONSTRUCTION LLC | $1,795,936 | +124.6% | 39.2% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
SHALOM SERVICES CORPORATION vs JACKSON EXCAVATION, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 3,995 CY | $142.00 | $155.00 | $184.74 | $51,935 |
| 500-7001 MOBILIZATION | 1 LS | $30,000.00 | $1,000.00 | $523,850.32 | -$29,000 |
| 459-7010 GABIONS (3' X 3')(GALV) | 160 CY | $400.00 | $240.00 | $319.83 | -$25,600 |
| 168-7001 VEGETATIVE WATERING | 174 TGL | $1.00 | $100.00 | $8.43 | $17,226 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 4 EA | $3,000.00 | $6,000.00 | $3,190.07 | $12,000 |
| 110-7002 EXCAV (CHANNEL) | 4,695 CY | $8.00 | $10.00 | $16.69 | $9,390 |
| 496-7055 REMOVING ROCK RIPRAP | 620 CY | $35.00 | $20.00 | $51.02 | -$9,300 |
| 505-7001 TMA (STATIONARY) | 6 DAY | $1.00 | $1,000.00 | $217.57 | $5,994 |
| 104-7006 REMOV CONC (RIPRAP) | 380 SY | $22.00 | $10.00 | $14.32 | -$4,560 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 440 SY | $1.00 | $10.00 | $30.47 | $3,960 |
| 506-7024 CONSTRUCTION EXITS (REMOVE) | 440 SY | $1.00 | $10.00 | $8.93 | $3,960 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $1,500.00 | $2,500.00 | $11,585.04 | $3,000 |
| 459-7009 GABION MATTRESSES (GALV) (24 IN) | 68 SY | $250.00 | $220.00 | $275.94 | -$2,040 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $1,000.00 | $10.00 | $9,253.78 | -$1,980 |
| 100-7002 PREPARING ROW | 3.11 STA | $1,500.00 | $1,000.00 | $6,072.92 | -$1,555 |
| 162-7002 BLOCK SODDING | 1,174 SY | $3.00 | $2.00 | $4.39 | -$1,174 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 220 LF | $1.00 | $6.00 | $71.34 | $1,100 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 220 LF | $1.00 | $3.00 | $5.23 | $440 |
| 132-7009 EMBANK (FNL)(OC)(TY C2) | 9 CY | $20.00 | $50.00 | $8.97 | $270 |
| 506-7046 BIODEG EROSN CONT LOGS (REMOVE) | 220 LF | $1.00 | $2.00 | $1.29 | $220 |
Positive: the low bidder was cheaper on that item. These 20 items account for $34,286 of the $34,326 gap.
SHALOM SERVICES CORPORATION: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $30,000.00 | $523,850.32 | 0.06x | -$493,850 |
| 110-7002 EXCAV (CHANNEL) | 4,695 CY | $8.00 | $16.69 | 0.48x | -$40,818 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $1,500.00 | $11,585.04 | 0.13x | -$30,255 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $1,000.00 | $9,253.78 | 0.11x | -$16,508 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 220 LF | $1.00 | $71.34 | 0.01x | -$15,476 |
| 100-7002 PREPARING ROW | 3.11 STA | $1,500.00 | $6,072.92 | 0.25x | -$14,222 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 440 SY | $1.00 | $30.47 | 0.03x | -$12,965 |
JACKSON EXCAVATION, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 168-7001 VEGETATIVE WATERING | 174 TGL | $100.00 | $8.43 | 11.86x | $15,933 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 4 EA | $6,000.00 | $3,190.07 | 1.88x | $11,240 |
| 505-7001 TMA (STATIONARY) | 6 DAY | $1,000.00 | $217.57 | 4.60x | $4,695 |
| 500-7001 MOBILIZATION | 1 LS | $1,000.00 | $523,850.32 | 0.00x | -$522,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $2,500.00 | $11,585.04 | 0.22x | -$27,255 |
| 496-7055 REMOVING ROCK RIPRAP | 620 CY | $20.00 | $51.02 | 0.39x | -$19,233 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $10.00 | $9,253.78 | 0.00x | -$18,488 |
| 100-7002 PREPARING ROW | 3.11 STA | $1,000.00 | $6,072.92 | 0.16x | -$15,777 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 220 LF | $6.00 | $71.34 | 0.08x | -$14,376 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 440 SY | $10.00 | $30.47 | 0.33x | -$9,005 |
GARRET SHIELDS INFRASTRUCTURE: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 162-7002 BLOCK SODDING | 1,174 SY | $10.00 | $4.39 | 2.28x | $6,589 |
| 104-7006 REMOV CONC (RIPRAP) | 380 SY | $30.00 | $14.32 | 2.10x | $5,959 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $523,850.32 | 0.19x | -$423,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $5,000.00 | $11,585.04 | 0.43x | -$19,755 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $1,000.00 | $9,253.78 | 0.11x | -$16,508 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 220 LF | $20.00 | $71.34 | 0.28x | -$11,296 |
ICOS MANAGEMENT, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 162-7002 BLOCK SODDING | 1,174 SY | $10.50 | $4.39 | 2.39x | $7,176 |
| 104-7006 REMOV CONC (RIPRAP) | 380 SY | $32.50 | $14.32 | 2.27x | $6,909 |
| 500-7001 MOBILIZATION | 1 LS | $125,000.00 | $523,850.32 | 0.24x | -$398,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $1.10 | $11,585.04 | 0.00x | -$34,752 |
| 100-7002 PREPARING ROW | 3.11 STA | $2,100.00 | $6,072.92 | 0.35x | -$12,356 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 220 LF | $21.00 | $71.34 | 0.29x | -$11,076 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $4,200.00 | $9,253.78 | 0.45x | -$10,108 |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 440 SY | $10.50 | $30.47 | 0.34x | -$8,785 |
TEXAS STEEL INDUSTRIAL PLACING, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 496-7055 REMOVING ROCK RIPRAP | 620 CY | $123.00 | $51.02 | 2.41x | $44,627 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $30,000.00 | $9,253.78 | 3.24x | $41,492 |
| 168-7001 VEGETATIVE WATERING | 174 TGL | $50.00 | $8.43 | 5.93x | $7,233 |
| 104-7006 REMOV CONC (RIPRAP) | 380 SY | $30.00 | $14.32 | 2.10x | $5,959 |
| 500-7001 MOBILIZATION | 1 LS | $110,000.00 | $523,850.32 | 0.21x | -$413,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $2,500.00 | $11,585.04 | 0.22x | -$27,255 |
| 100-7002 PREPARING ROW | 3.11 STA | $1,000.00 | $6,072.92 | 0.16x | -$15,777 |