Interchange@Uniroyal Dr&SH 84
0018-05-089 · let Aug 6, 2026 · Webb, Laredo · Interchange (New or Reconstructed)
$205,813,981Low bid: PULICE CONSTRUCTION, INC.-9.3% vs estimate $226,858,176
$11,241,868Left on the table5.5% gap to the second bid
4BiddersSpread 34% low to high
443Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | PULICE CONSTRUCTION, INC. | $205,813,981 | -9.3% | $11,241,868 | 3+$39,213,510 | 0 | |
| 2 | WEBBER, LLC | $217,055,849 | +5.5% | -4.3% | $6,471,426 | 3+$43,527,394 | 1-$3,489,201 |
| 3 | JAMES CONSTRUCTION GROUP, LLC | $223,527,275 | +8.6% | -1.5% | $51,340,251 | 2+$26,131,400 | 0 |
| 4 | ZACHRY CONSTRUCTION CORPORATION | $274,867,526 | +33.6% | 21.2% | 4+$56,474,781 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
PULICE CONSTRUCTION, INC. vs WEBBER, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 45 MO | $50,000.00 | $225,000.00 | $11,585.04 | $7,875,000 |
| 360-7007 CONC PVMT (CRCP) (13") | 493,206 SY | $87.20 | $97.15 | $97.71 | $4,907,400 |
| 100-7002 PREPARING ROW | 232.59 STA | $81,000.00 | $61,739.85 | $6,072.92 | -$4,479,718 |
| 508-7001 CONSTRUCTING DETOURS | 71,533 SY | $78.00 | $108.22 | $83.58 | $2,161,727 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 473,311 CY | $10.00 | $5.82 | $13.19 | -$1,978,440 |
| 423-7001 RETAINING WALL (MSE) | 152,871 SF | $85.00 | $97.71 | $74.07 | $1,942,990 |
| 505-7001 TMA (STATIONARY) | 3,500 DAY | $275.00 | $1.00 | $217.57 | -$959,000 |
| 500-7001 MOBILIZATION | 1 LS | $20,581,398.08 | $21,500,000.00 | $523,850.32 | $918,602 |
| 276-7345 CEM TRT(PLNT MX)(CL N)(TYE)(GR1-2)(8") | 293,683 SY | $21.60 | $24.46 | $21.60 | $839,933 |
| 512-7001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 35,860 LF | $60.00 | $36.85 | $52.29 | -$830,159 |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 23,220 LF | $60.00 | $28.32 | $43.56 | -$735,610 |
| 276-7421 CEM TRT(PLNT MX)(CL N)(TYE)(GR1-2)(9") | 253,529 SY | $24.78 | $21.96 | $24.78 | -$714,952 |
| 450-7075 RAIL(TY T80SS)(MOD) | 24,693.6 LF | $65.00 | $92.27 | $65.50 | $673,394 |
| 403-7001 TEMPORARY SPL SHORING | 113,586 SF | $14.00 | $19.18 | $25.56 | $588,375 |
| 514-7004 PERM CTB (SGL SLOPE)(42)(MOD) | 15,903 LF | $45.00 | $81.09 | $63.00 | $573,939 |
| 422-7001 REINF CONC SLAB | 260,504 SF | $21.00 | $22.99 | $24.45 | $518,403 |
| 425-7005 PRESTR CONC GIRDER (TX54) | 27,590.46 LF | $210.00 | $191.99 | $215.33 | -$496,904 |
| 512-7049 PORT CTB (REMOVE)(SGL SLP)(TY 1) | 35,860 LF | $8.50 | $22.30 | $12.08 | $494,868 |
| 512-7057 PORT CTB (REMOVE)(LOW PROF)(TY 1) | 23,220 LF | $5.20 | $24.32 | $11.18 | $443,966 |
| 529-7002 CONC CURB (TY II) | 23,982 LF | $25.00 | $7.73 | $26.45 | -$414,169 |
Positive: the low bidder was cheaper on that item. These 20 items account for $11,329,647 of the $11,241,868 gap.
PULICE CONSTRUCTION, INC.: unbalanced items
Placed 1WEBBER, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $21,500,000.00 | $523,850.32 | 41.04x | $20,976,150 |
| 100-7002 PREPARING ROW | 232.59 STA | $61,739.85 | $6,072.92 | 10.17x | $12,947,571 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 45 MO | $225,000.00 | $11,585.04 | 19.42x | $9,603,673 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 473,311 CY | $5.82 | $13.19 | 0.44x | -$3,489,201 |
JAMES CONSTRUCTION GROUP, LLC: unbalanced items
Placed 3ZACHRY CONSTRUCTION CORPORATION: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $27,400,000.00 | $523,850.32 | 52.31x | $26,876,150 |
| 100-7002 PREPARING ROW | 232.59 STA | $117,803.86 | $6,072.92 | 19.40x | $25,987,499 |
| 105-7019 RMV (19"-23") TRT/UNTRT BASE & ASPH PAV | 308,036 SY | $13.19 | $6.35 | 2.08x | $2,107,459 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 45 MO | $45,000.00 | $11,585.04 | 3.88x | $1,503,673 |