HSIP Systemic Median Barrier
0013-08-154 · let Aug 5, 2026 · Wise, Fort Worth · Safety Improvement Projects
$1,237,814Low bid: GRATIOT CONSTRUCTION, LTD.+1.3% vs estimate $1,221,714
$13,063Left on the table1.1% gap to the second bid
5BiddersSpread 24% low to high
13Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | GRATIOT CONSTRUCTION, LTD. | $1,237,814 | 1.3% | $13,063 | 0 | 8-$3,187,951 | |
| 2 | ROADWAY SPECIALTIES, INC. | $1,250,877 | +1.1% | 2.4% | $59,945 | 2+$140,416 | 6-$3,101,494 |
| 3 | HJC FARMS, INC. | $1,310,822 | +5.9% | 7.3% | $38,170 | 1+$44,961 | 6-$3,103,002 |
| 4 | SCR CIVIL CONSTRUCTION, LLC | $1,348,993 | +9.0% | 10.4% | $190,480 | 2+$36,694 | 7-$3,167,938 |
| 5 | SILVER CREEK CONSTRUCTION, INC. | $1,539,472 | +24.4% | 26.0% | 2+$57,046 | 3-$2,839,206 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
GRATIOT CONSTRUCTION, LTD. vs ROADWAY SPECIALTIES, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 432-7014 RIPRAP (MOW STRIP)(5 IN) | 1,814.47 CY | $470.00 | $343.34 | $480.77 | -$229,821 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 182 DAY | $1.00 | $533.87 | $87.82 | $96,982 |
| 505-7001 TMA (STATIONARY) | 364 DAY | $1.00 | $250.00 | $217.57 | $90,636 |
| 168-7001 VEGETATIVE WATERING | 892.68 TGL | $1.00 | $74.79 | $8.43 | $65,871 |
| 500-7001 MOBILIZATION | 1 LS | $255,000.00 | $192,734.78 | $523,850.32 | -$62,265 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $1.00 | $3,617.05 | $11,585.04 | $39,777 |
| 100-7002 PREPARING ROW | 367.33 STA | $15.00 | $45.12 | $6,072.92 | $11,064 |
| 543-7018 CABLE BARRIER TERM SEC (INSTL)(TL-4) | 32 EA | $700.00 | $1,023.68 | $2,822.11 | $10,358 |
| 505-7003 TMA (MOBILE OPERATION) | 20 DAY | $1.00 | $350.00 | $229.60 | $6,980 |
| 164-7017 HYDRO MULCH SEED (PERM_RURAL_SANDY) | 25,547.75 SY | $0.4800 | $0.2300 | $0.5289 | -$6,387 |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 38,183.23 LF | $2.00 | $1.84 | $12.40 | -$6,109 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 1,590 LF | $6.25 | $4.44 | $5.23 | -$2,878 |
| 506-7046 BIODEG EROSN CONT LOGS (REMOVE) | 1,590 LF | $1.30 | $0.5800 | $1.29 | -$1,145 |
Positive: the low bidder was cheaper on that item. These 13 items account for $13,063 of the $13,063 gap.
GRATIOT CONSTRUCTION, LTD.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 100-7002 PREPARING ROW | 367.33 STA | $15.00 | $6,072.92 | 0.00x | -$2,225,256 |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 38,183.23 LF | $2.00 | $12.40 | 0.16x | -$397,243 |
| 500-7001 MOBILIZATION | 1 LS | $255,000.00 | $523,850.32 | 0.49x | -$268,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $1.00 | $11,585.04 | 0.00x | -$127,424 |
| 505-7001 TMA (STATIONARY) | 364 DAY | $1.00 | $217.57 | 0.00x | -$78,832 |
| 543-7018 CABLE BARRIER TERM SEC (INSTL)(TL-4) | 32 EA | $700.00 | $2,822.11 | 0.25x | -$67,908 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 182 DAY | $1.00 | $87.82 | 0.01x | -$15,801 |
| 168-7001 VEGETATIVE WATERING | 892.68 TGL | $1.00 | $8.43 | 0.12x | -$6,636 |
ROADWAY SPECIALTIES, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 182 DAY | $533.87 | $87.82 | 6.08x | $81,182 |
| 168-7001 VEGETATIVE WATERING | 892.68 TGL | $74.79 | $8.43 | 8.87x | $59,235 |
| 100-7002 PREPARING ROW | 367.33 STA | $45.12 | $6,072.92 | 0.01x | -$2,214,192 |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 38,183.23 LF | $1.84 | $12.40 | 0.15x | -$403,352 |
| 500-7001 MOBILIZATION | 1 LS | $192,734.78 | $523,850.32 | 0.37x | -$331,116 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $3,617.05 | $11,585.04 | 0.31x | -$87,648 |
| 543-7018 CABLE BARRIER TERM SEC (INSTL)(TL-4) | 32 EA | $1,023.68 | $2,822.11 | 0.36x | -$57,550 |
| 164-7017 HYDRO MULCH SEED (PERM_RURAL_SANDY) | 25,547.75 SY | $0.2300 | $0.5289 | 0.43x | -$7,636 |
HJC FARMS, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 168-7001 VEGETATIVE WATERING | 892.68 TGL | $58.80 | $8.43 | 6.97x | $44,961 |
| 100-7002 PREPARING ROW | 367.33 STA | $40.00 | $6,072.92 | 0.01x | -$2,216,073 |
| 500-7001 MOBILIZATION | 1 LS | $98,000.00 | $523,850.32 | 0.19x | -$425,850 |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 38,183.23 LF | $6.00 | $12.40 | 0.48x | -$244,510 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $500.00 | $11,585.04 | 0.04x | -$121,935 |
| 505-7001 TMA (STATIONARY) | 364 DAY | $1.00 | $217.57 | 0.00x | -$78,832 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 182 DAY | $1.00 | $87.82 | 0.01x | -$15,801 |
SCR CIVIL CONSTRUCTION, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 168-7001 VEGETATIVE WATERING | 892.68 TGL | $39.00 | $8.43 | 4.62x | $27,286 |
| 505-7003 TMA (MOBILE OPERATION) | 20 DAY | $700.00 | $229.60 | 3.05x | $9,408 |
| 100-7002 PREPARING ROW | 367.33 STA | $51.10 | $6,072.92 | 0.01x | -$2,211,996 |
| 500-7001 MOBILIZATION | 1 LS | $95,900.00 | $523,850.32 | 0.18x | -$427,950 |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 38,183.23 LF | $3.60 | $12.40 | 0.29x | -$336,150 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $5,450.00 | $11,585.04 | 0.47x | -$67,485 |
| 543-7018 CABLE BARRIER TERM SEC (INSTL)(TL-4) | 32 EA | $915.00 | $2,822.11 | 0.32x | -$61,028 |
| 505-7001 TMA (STATIONARY) | 364 DAY | $75.00 | $217.57 | 0.34x | -$51,896 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 182 DAY | $25.00 | $87.82 | 0.28x | -$11,433 |
SILVER CREEK CONSTRUCTION, INC.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 168-7001 VEGETATIVE WATERING | 892.68 TGL | $60.00 | $8.43 | 7.11x | $46,032 |
| 164-7017 HYDRO MULCH SEED (PERM_RURAL_SANDY) | 25,547.75 SY | $0.9600 | $0.5289 | 1.82x | $11,014 |
| 100-7002 PREPARING ROW | 367.33 STA | $250.00 | $6,072.92 | 0.04x | -$2,138,934 |
| 500-7001 MOBILIZATION | 1 LS | $154,000.00 | $523,850.32 | 0.29x | -$369,850 |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 38,183.23 LF | $3.75 | $12.40 | 0.30x | -$330,422 |