SH 6 - Memorial Dr to Westpark Dr
1685-05-140 · let Aug 5, 2026 · Harris, Houston · Safety Improvement Projects
$1,834,898Low bid: STRUCTURAL INTEGRITY GROUP LLC-16.7% vs estimate $2,203,493
$2,695Left on the table0.1% gap to the second bid
13BiddersSpread 58% low to high
13Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | STRUCTURAL INTEGRITY GROUP LLC | $1,834,898 | -16.7% | $2,695 | 0 | 1-$375,672 | |
| 2 | ALBATROSS CONSTRUCTION LLC | $1,837,593 | +0.1% | -16.6% | $13,447 | 0 | 2-$498,945 |
| 3 | DECO CONTRACTORS, INC. | $1,851,040 | +0.9% | -16.0% | $3,807 | 0 | 2-$422,531 |
| 4 | SICE, INC. | $1,854,848 | +1.1% | -15.8% | $15,484 | 0 | 4-$507,877 |
| 5 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | $1,870,331 | +1.9% | -15.1% | $82,296 | 1+$33,891 | 2-$539,531 |
| 6 | VACA UNDERGROUND UTILITIES INC | $1,952,627 | +6.4% | -11.4% | $14,630 | ||
| 7 | THIRD COAST SERVICES LLC | $1,967,257 | +7.2% | -10.7% | $31,175 | ||
| 8 | JASCO | $1,998,432 | +8.9% | -9.3% | $14,320 | ||
| 9 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $2,012,752 | +9.7% | -8.7% | $54,199 | ||
| 10 | CREACOM, INC. | $2,066,951 | +12.6% | -6.2% | $90,867 | ||
| 11 | TRAF-TEX, INC. | $2,157,818 | +17.6% | -2.1% | $81,157 | ||
| 12 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | $2,238,975 | +22.0% | 1.6% | $664,290 | ||
| 13 | ROAD SOLUTIONS L.L.C. | $2,903,265 | +58.2% | 31.8% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
STRUCTURAL INTEGRITY GROUP LLC vs ALBATROSS CONSTRUCTION LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 618-7055 CONDT (PVC) (SCH 80) (2") (BORE) | 6,666 LF | $23.30 | $10.61 | $20.33 | -$84,592 |
| 618-7054 CONDT (PVC) (SCH 80) (2") | 32,814 LF | $6.15 | $8.63 | $12.03 | $81,379 |
| 500-7001 MOBILIZATION | 1 LS | $148,178.00 | $76,635.65 | $523,850.32 | -$71,542 |
| 610-7198 IN RD IL (TY SA) 50T-10 (400W EQ) LED | 158 EA | $4,470.00 | $4,747.93 | $5,165.17 | $43,913 |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 1,580 LF | $151.00 | $175.97 | $270.84 | $39,453 |
| 620-7010 ELEC CONDR (NO.6) INSULATED | 81,906 LF | $1.67 | $1.98 | $2.58 | $25,391 |
| 432-7007 RIPRAP (CONC) (CL B) (4 IN) | 56.5 CY | $870.00 | $532.59 | $564.22 | -$19,064 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $7,056.00 | $5,118.75 | $11,585.04 | -$15,498 |
| 620-7009 ELEC CONDR (NO.6) BARE | 40,889 LF | $1.38 | $1.62 | $2.23 | $9,813 |
| 628-7055 ELC SRV TY A 240/480 060(SS)SS(E)GC(U) | 3 EA | $6,620.00 | $9,755.20 | $7,162.06 | $9,406 |
| 505-7001 TMA (STATIONARY) | 120 DAY | $280.00 | $222.55 | $217.57 | -$6,894 |
| 618-7078 CONDT (RM) (2") | 449 LF | $44.15 | $30.74 | $49.01 | -$6,021 |
| 624-7008 GROUND BOX TY D (162922)W/APRON | 10 EA | $1,266.00 | $961.19 | $1,715.49 | -$3,048 |
Positive: the low bidder was cheaper on that item. These 13 items account for $2,695 of the $2,695 gap.
STRUCTURAL INTEGRITY GROUP LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $148,178.00 | $523,850.32 | 0.28x | -$375,672 |
ALBATROSS CONSTRUCTION LLC: unbalanced items
Placed 2DECO CONTRACTORS, INC.: unbalanced items
Placed 3SICE, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $171,783.00 | $523,850.32 | 0.33x | -$352,067 |
| 618-7055 CONDT (PVC) (SCH 80) (2") (BORE) | 6,666 LF | $8.66 | $20.33 | 0.43x | -$77,774 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $3,282.44 | $11,585.04 | 0.28x | -$66,421 |
| 618-7078 CONDT (RM) (2") | 449 LF | $23.14 | $49.01 | 0.47x | -$11,615 |