Bid Tab X-ray: 6511-40-001

Nov 17, 2026 · Walker Sign up free
Set your company to personalize scores

FY27 - Walker/Madison LRA - 11

6511-40-001 · let Nov 17, 2026 · Walker, Bryan · Material Maintenance Project

$221,348Low bid: MARTIN MARIETTA MATERIALS, INC.+5.4% vs estimate $210,000
$8,310Left on the table3.8% gap to the second bid
2BiddersSpread 4% low to high
2Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1MARTIN MARIETTA MATERIALS, INC. $221,3485.4% $8,310 0 0
2VULCAN CONSTRUCTION MATERIALS, LLC $229,658+3.8%9.4% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

MARTIN MARIETTA MATERIALS, INC. vs VULCAN CONSTRUCTION MATERIALS, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8001-7107 LRA (TY II GR DS) (DEL) (ST1)750 TON $148.89$154.83$125.06 $4,455
8001-7108 LRA (TY II GR DS) (DEL) (ST2)750 TON $146.24$151.38$141.87 $3,855

Positive: the low bidder was cheaper on that item. These 2 items account for $8,310 of the $8,310 gap.