FY27 - Walker/Madison LRA - 11
6511-40-001 · let Nov 17, 2026 · Walker, Bryan · Material Maintenance Project
$221,348Low bid: MARTIN MARIETTA MATERIALS, INC.+5.4% vs estimate $210,000
$8,310Left on the table3.8% gap to the second bid
2BiddersSpread 4% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | MARTIN MARIETTA MATERIALS, INC. | $221,348 | 5.4% | $8,310 | 0 | 0 | |
| 2 | VULCAN CONSTRUCTION MATERIALS, LLC | $229,658 | +3.8% | 9.4% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
MARTIN MARIETTA MATERIALS, INC. vs VULCAN CONSTRUCTION MATERIALS, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7107 LRA (TY II GR DS) (DEL) (ST1) | 750 TON | $148.89 | $154.83 | $125.06 | $4,455 |
| 8001-7108 LRA (TY II GR DS) (DEL) (ST2) | 750 TON | $146.24 | $151.38 | $141.87 | $3,855 |
Positive: the low bidder was cheaper on that item. These 2 items account for $8,310 of the $8,310 gap.