Bid Tab X-ray: 6511-39-001

Nov 18, 2026 · Brazos Sign up free
Set your company to personalize scores

FY27 - Bryan AO LRA - 11

6511-39-001 · let Nov 18, 2026 · Brazos, Bryan · Material Maintenance Project

$325,253Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+3.3% vs estimate $315,000
$5,250Left on the table1.6% gap to the second bid
2BiddersSpread 2% low to high
3Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1VULCAN CONSTRUCTION MATERIALS, LLC $325,2533.3% $5,250 0 0
2MARTIN MARIETTA MATERIALS, INC. $330,503+1.6%4.9% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8001-7108 LRA (TY II GR DS) (DEL) (ST2)750 TON $145.17$148.09$141.87 $2,190
8001-7109 LRA (TY II GR DS) (DEL) (ST3)750 TON $145.40$147.45$132.08 $1,537
8001-7107 LRA (TY II GR DS) (DEL) (ST1)750 TON $143.10$145.13$125.06 $1,523

Positive: the low bidder was cheaper on that item. These 3 items account for $5,250 of the $5,250 gap.