FY27 - Bryan AO LRA - 11
6511-39-001 · let Nov 18, 2026 · Brazos, Bryan · Material Maintenance Project
$325,253Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+3.3% vs estimate $315,000
$5,250Left on the table1.6% gap to the second bid
2BiddersSpread 2% low to high
3Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | VULCAN CONSTRUCTION MATERIALS, LLC | $325,253 | 3.3% | $5,250 | 0 | 0 | |
| 2 | MARTIN MARIETTA MATERIALS, INC. | $330,503 | +1.6% | 4.9% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7108 LRA (TY II GR DS) (DEL) (ST2) | 750 TON | $145.17 | $148.09 | $141.87 | $2,190 |
| 8001-7109 LRA (TY II GR DS) (DEL) (ST3) | 750 TON | $145.40 | $147.45 | $132.08 | $1,537 |
| 8001-7107 LRA (TY II GR DS) (DEL) (ST1) | 750 TON | $143.10 | $145.13 | $125.06 | $1,523 |
Positive: the low bidder was cheaper on that item. These 3 items account for $5,250 of the $5,250 gap.