6509-22-001 Hot Mix George West
6509-22-001 · let Nov 17, 2026 · Live Oak, Corpus Christi · Material Maintenance Project
$370,000Low bid: CK NEWBERRY, LLC0.0% vs estimate $370,000
$10,000Left on the table2.7% gap to the second bid
3BiddersSpread 11% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | CK NEWBERRY, LLC | $370,000 | 0.0% | $10,000 | 0 | 0 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $380,000 | +2.7% | 2.7% | $30,400 | 0 | 0 |
| 3 | COLORADO MATERIALS, LTD. | $410,400 | +10.9% | 10.9% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
CK NEWBERRY, LLC vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7055 D-GR HMA TY D PG 64-22 (PICKUP) | 2,000 TON | $85.00 | $92.00 | $89.12 | $14,000 |
| 8011-7056 D-GR HMA TY D PG 64-22 (DEL) SITE 1 | 2,000 TON | $100.00 | $98.00 | $99.54 | -$4,000 |
Positive: the low bidder was cheaper on that item. These 2 items account for $10,000 of the $10,000 gap.