Bid Tab X-ray: 6506-44-001

Nov 12, 2026 · Collin Sign up free
Set your company to personalize scores

Hot Mix FY2027

6506-44-001 · let Nov 12, 2026 · Collin, Dallas · Material Maintenance Project

$530,400Low bid: AUSTIN ASPHALT, INC.-6.4% vs estimate $566,650
$17,600Left on the table3.3% gap to the second bid
4BiddersSpread 29% low to high
4Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1AUSTIN ASPHALT, INC. $530,400-6.4% $17,600 0 0
2ROADXCHANGE MELISSA LLC $548,000+3.3%-3.3% $34,770 0 0
3SOUTHERN SOURCING SOLUTIONS, LLC $582,770+9.9%2.8% $101,530 0 0
4TOUCHSTONE RESOURCES, LLC $684,300+29.0%20.8% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

AUSTIN ASPHALT, INC. vs ROADXCHANGE MELISSA LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8017-7019 SP MIXTURES SP-D PG64-22 (PICKUP)4,500 TON $87.00$90.00$96.97 $13,500
8017-7010 SP MIXTURES SP-C PG70-22 (PICKUP)900 TON $96.00$99.00$104.70 $2,700
8011-7055 D-GR HMA TY D PG 64-22 (PICKUP)500 TON $86.00$88.00$89.12 $1,000
8011-7127 D-GR HMA TY C PG 70-22 (PICKUP)100 TON $95.00$99.00$120.25 $400

Positive: the low bidder was cheaper on that item. These 4 items account for $17,600 of the $17,600 gap.