0035-05-062 US 83 SEAL COAT
0035-05-062 · let Dec 4, 2024 · Menard, San Angelo · Seal Coat
$11,252,314Low bid: RONALD R. WAGNER & CO., LP-1.7% vs estimate $11,446,359
$240,910Left on the table2.1% gap to the second bid
3BiddersSpread 13% low to high
295Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | RONALD R. WAGNER & CO., LP | $11,252,314 | -1.7% | $240,910 | 1+$565,536 | 1-$335,209 | |
| 2 | CLARK CONSTRUCTION OF TEXAS, INC. | $11,493,224 | +2.1% | 0.4% | $1,192,899 | 2+$904,810 | 0 |
| 3 | CK NEWBERRY, LLC | $12,686,122 | +12.7% | 10.8% | 1+$676,150 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
RONALD R. WAGNER & CO., LP vs CLARK CONSTRUCTION OF TEXAS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 316-7067 ASPH (AC-20-5TR OR AC-20XP) | 1,614,572 GAL | $3.61 | $3.07 | $3.44 | -$875,098 |
| 316-7222 AGGR (TY-PD, GR-3)(SAC-B) | 29,131 CY | $102.43 | $123.08 | $103.76 | $601,555 |
| 677-7030 ELIM EXT PM & MRKS (RUMBLE STRIP) | 2,884,755 LF | $0.0100 | $0.1400 | $0.1262 | $375,018 |
| 500-7001 MOBILIZATION | 1 LS | $1,089,386.45 | $1,325,000.00 | $523,850.32 | $235,614 |
| 666-7175 RE PM TY II (W) 6" (SLD) | 2,031,036 LF | $0.2500 | $0.1700 | $0.1701 | -$162,483 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $0.0100 | $37,500.00 | $11,585.04 | $150,000 |
| 666-7213 RE PM TY II (Y) 6" (SLD) | 665,737 LF | $0.2700 | $0.1700 | $0.1749 | -$66,574 |
| 672-7004 REFL PAV MRKR TY II-A-A | 31,649 EA | $5.00 | $4.00 | $3.97 | -$31,649 |
| 316-7148 AGGR (TY-PD, GR-4)(SAC-A) | 3,374 CY | $106.16 | $115.43 | $145.44 | $31,277 |
| 666-7211 RE PM TY II (Y) 6" (BRK) | 221,330 LF | $0.2700 | $0.1700 | $0.1759 | -$22,133 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 52 DAY | $0.0100 | $200.00 | $87.82 | $10,399 |
| 672-7002 REFL PAV MRKR TY I-C | 4,367 EA | $5.00 | $4.00 | $4.04 | -$4,367 |
| 666-7172 RE PM TY II (W) 6" (BRK) | 11,590 LF | $0.2500 | $0.1700 | $0.2347 | -$927 |
| 668-7113 PREFAB PM TY C (W)(BIKE ARROW) | 10 EA | $200.00 | $250.00 | $126.73 | $500 |
| 668-7115 PREFAB PM TY C (W)(BIKE SYMBOL) | 10 EA | $200.00 | $250.00 | $196.81 | $500 |
| 666-7214 RE PM TY II (Y) 8" (SLD) | 5,785 LF | $0.4000 | $0.3500 | $0.2184 | -$289 |
| 668-7091 PREFAB PM TY C (W)(ARROW) | 14 EA | $220.00 | $200.00 | $201.69 | -$280 |
| 666-7179 RE PM TY II (W) 8" (SLD) | 2,831 LF | $0.4000 | $0.3500 | $0.4127 | -$142 |
| 668-7111 PREFAB PM TY C (W)(36")(YLD TRI) | 43 EA | $30.00 | $28.00 | $38.96 | -$86 |
| 505-7003 TMA (MOBILE OPERATION) | 52 DAY | $0.0100 | $1.00 | $229.60 | $51 |
Positive: the low bidder was cheaper on that item. These 20 items account for $240,887 of the $240,910 gap.
RONALD R. WAGNER & CO., LP: unbalanced items
Placed 1CLARK CONSTRUCTION OF TEXAS, INC.: unbalanced items
Placed 2CK NEWBERRY, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,200,000.00 | $523,850.32 | 2.29x | $676,150 |