Bid Tab X-ray: 0047-01-075

Jan 7, 2025 · Grayson Sign up free
Set your company to personalize scores

US 75 Heavy Overlay 2b

0047-01-075 · let Jan 7, 2025 · Grayson, Paris · Overlay

$14,667,932Low bid: RK HALL, LLC-8.0% vs estimate $15,941,259
$676,573Left on the table4.6% gap to the second bid
4BiddersSpread 36% low to high
200Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1RK HALL, LLC $14,667,932-8.0% $676,573 4+$545,347 1-$1,421,220
2OVERLAND CORPORATION $15,344,505+4.6%-3.7% $2,394,748 5+$1,722,563 1-$1,574,745
3JAGOE-PUBLIC COMPANY $17,739,252+20.9%11.3% $2,144,658 5+$2,451,537 1-$1,554,720
4FNH CONSTRUCTION, LLC $19,883,911+35.6%24.7% 2+$1,482,966 1-$425,099

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

RK HALL, LLC vs OVERLAND CORPORATION, biggest item swings
ItemQtyLow2ndMarket2nd minus low
500-7001 MOBILIZATION1 LS $300,000.00$1,340,000.00$523,850.32 $1,040,000
134-7001 BACKFILL (TY A)656 STA $475.00$1,200.00$224.26 $475,600
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING8 MO $33,750.17$5,000.00$11,585.04 -$230,001
100-7002 PREPARING ROW267 STA $750.00$175.00$6,072.92 -$153,525
341-7002 D-GR HMA TY-B SAC-B PG64-2244,078 TON $117.10$114.00$109.80 -$136,642
344-7010 SP MIXES SP-C SAC-A PG64-2242,648 TON $122.00$119.00$123.74 -$127,944
3019-7001 COMPOSITE GEOGRID FOR ASPHALT OVERLAY156,275 SY $3.52$3.95$3.97 $67,198
344-7077 TACK COAT25,250 GAL $5.48$3.00$3.25 -$62,620
351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")450 SY $166.32$300.00$98.88 $60,156
432-7013 RIPRAP (MOW STRIP)(4 IN)303 CY $783.00$600.00$616.83 -$55,449
647-7002 RELOCATE LRSA9 EA $1,620.00$6,000.00$2,343.24 $39,420
104-7005 REMOV CONC (MOWSTRIP)3,000 LF $19.00$7.00$9.49 -$36,000
105-7023 RMV (3") TRT/UNTRT BASE & ASPH PAV2,000 SY $27.00$9.00$3.93 -$36,000
505-7001 TMA (STATIONARY)128 DAY $568.29$300.00$217.57 -$34,341
361-7044 FULL-DEPTH REPAIR CRCP (VAR DEPTH)275 CY $1,890.00$1,800.00$1,211.78 -$24,750
354-7066 PLANE CONC PAV(0" TO 2")8,861 SY $6.91$4.50$4.21 -$21,355
505-7003 TMA (MOBILE OPERATION)128 DAY $1,078.81$925.00$229.60 -$19,688
503-7002 PORTABLE CHANGEABLE MESSAGE SIGN6 EA $9,629.57$6,500.00$9,253.78 -$18,777
662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W16,304 EA $2.64$1.50$1.03 -$18,587
540-7004 MTL THRIE-BEAM GD FEN (STEEL POST)24 LF $2,257.20$3,000.00$331.74 $17,827

Positive: the low bidder was cheaper on that item. These 20 items account for $724,523 of the $676,573 gap.

RK HALL, LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING8 MO $33,750.17$11,585.042.91x$177,321
134-7001 BACKFILL (TY A)656 STA $475.00$224.262.12x$164,483
505-7003 TMA (MOBILE OPERATION)128 DAY $1,078.81$229.604.70x$108,699
361-7045 FULL-DEPTH REPAIR CPCD (VAR DEPTH)100 CY $1,880.28$931.832.02x$94,845
100-7002 PREPARING ROW267 STA $750.00$6,072.920.12x-$1,421,220

OVERLAND CORPORATION: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $1,340,000.00$523,850.322.56x$816,150
134-7001 BACKFILL (TY A)656 STA $1,200.00$224.265.35x$640,083
351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")450 SY $300.00$98.883.03x$90,502
505-7003 TMA (MOBILE OPERATION)128 DAY $925.00$229.604.03x$89,012
361-7045 FULL-DEPTH REPAIR CPCD (VAR DEPTH)100 CY $1,800.00$931.831.93x$86,817
100-7002 PREPARING ROW267 STA $175.00$6,072.920.03x-$1,574,745

JAGOE-PUBLIC COMPANY: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $1,965,000.00$523,850.323.75x$1,441,150
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING8 MO $77,500.00$11,585.046.69x$527,320
134-7001 BACKFILL (TY A)656 STA $650.00$224.262.90x$279,283
361-7045 FULL-DEPTH REPAIR CPCD (VAR DEPTH)100 CY $2,000.00$931.832.15x$106,817
168-7001 VEGETATIVE WATERING1,059 TGL $100.00$8.4311.86x$96,969
100-7002 PREPARING ROW267 STA $250.00$6,072.920.04x-$1,554,720

FNH CONSTRUCTION, LLC: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
500-7001 MOBILIZATION1 LS $1,900,000.00$523,850.323.63x$1,376,150
361-7045 FULL-DEPTH REPAIR CPCD (VAR DEPTH)100 CY $2,000.00$931.832.15x$106,817
3019-7001 COMPOSITE GEOGRID FOR ASPHALT OVERLAY156,275 SY $1.25$3.970.31x-$425,099