Traffic Signal Maintenance Districtwide
6481-08-001 · let Apr 22, 2025 · Webb, Laredo · Routine Maintenance Project - Sealed
$435,261Low bid: TRIPLE H FIELD SERVICES, LLC+6.5% vs estimate $408,646
—Left on the tableOnly one bidder
1Bidders
149Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TRIPLE H FIELD SERVICES, LLC | $435,261 | 6.5% | 6+$45,530 | 5-$145,119 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 1 bidders.
TRIPLE H FIELD SERVICES, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7003 MOBILIZATION (CALLOUT 1) | 10 EA | $3,500.00 | $599.93 | 5.83x | $29,001 |
| 680-7004 REMOVING TRAFFIC SIGNALS | 1 EA | $10,000.00 | $5,086.47 | 1.97x | $4,914 |
| 500-7033 MOBILIZATION (EMERGENCY) | 1 EA | $4,500.00 | $844.81 | 5.33x | $3,655 |
| 531-7010 CURB RAMPS (TY 7) | 1 EA | $5,500.00 | $2,829.94 | 1.94x | $2,670 |
| 531-7003 CONC SIDEWALKS (6") | 10 SY | $355.00 | $88.84 | 4.00x | $2,662 |
| 677-7002 ELIM EXT PM & MRKS (6") | 2,000 LF | $1.59 | $0.2755 | 5.77x | $2,629 |
| 500-7004 MOBILIZATION (CALLOUT 2) | 10 EA | $8,000.00 | $18,951.60 | 0.42x | -$109,516 |
| 666-7132 REFL PAV MRK TY I(Y)(MED NOSE)(100MIL) | 100 EA | $22.00 | $253.29 | 0.09x | -$23,129 |
| 690-7131 INSTALL BBU SYSTEM | 1 EA | $750.00 | $5,893.34 | 0.13x | -$5,143 |
| 690-7040 INSTALL OF CONTROL CABINET(GRND MNT) | 1 EA | $1,500.00 | $5,516.10 | 0.27x | -$4,016 |
| 505-7002 TMA (MOBILE OPERATION) | 85 HR | $25.00 | $64.00 | 0.39x | -$3,315 |