IH37 DMS Live Oak San Pat
0916-00-248 · let May 1, 2025 · Nueces, Corpus Christi · Traffic Control Devices
$2,925,020Low bid: TRAF-TEX, INC.-12.8% vs estimate $3,356,297
$36,530Left on the table1.2% gap to the second bid
6BiddersSpread 21% low to high
28Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TRAF-TEX, INC. | $2,925,020 | -12.8% | $36,530 | 1+$83,255 | 3-$475,760 | |
| 2 | THIRD COAST SERVICES LLC | $2,961,551 | +1.2% | -11.8% | $17,671 | 3+$486,290 | 5-$297,180 |
| 3 | THE LEVY COMPANY, LLC | $2,979,222 | +1.9% | -11.2% | $197,392 | 3+$222,817 | 5-$246,097 |
| 4 | LIGHT IT UP ELECTRIC | $3,176,614 | +8.6% | -5.4% | $80,516 | 2+$223,255 | 3-$329,314 |
| 5 | E-Z BEL CONSTRUCTION, LLC | $3,257,130 | +11.4% | -3.0% | $275,129 | 2+$161,168 | 3-$179,789 |
| 6 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | $3,532,259 | +20.8% | 5.2% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
TRAF-TEX, INC. vs THIRD COAST SERVICES LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 244 DAY | $251.00 | $1,687.46 | $217.57 | $350,496 |
| 620-7018 ELEC CONDR (NO.1) INSULATED | 27,870 LF | $11.70 | $5.53 | $8.95 | -$171,958 |
| 500-7001 MOBILIZATION | 1 LS | $189,104.00 | $296,155.07 | $523,850.32 | $107,051 |
| 416-7007 DRILL SHAFT (42 IN) | 288 LF | $608.00 | $313.09 | $318.92 | -$84,934 |
| 6004-7002 INSTALL DMS (FOUNDATION MTD CABINET) | 8 EA | $15,563.00 | $5,462.17 | $15,728.94 | -$80,807 |
| 628-7152 ELC SRV TY D 120/240 060(NS)SS(N)GC(O) | 13 EA | $11,691.00 | $6,609.16 | $10,217.60 | -$66,064 |
| 416-7033 DRILL SHAFT (SIGN MTS) (54 IN) | 280 LF | $871.00 | $1,013.97 | $761.42 | $40,032 |
| 247-7113 FL BS (CMP IN PLC)(TY A GR 1-2) (12") | 3,432.11 SY | $50.00 | $61.63 | $34.64 | $39,915 |
| 6011-7002 ITS POLE MNT CAB (TY 2)(CONF 2) | 12 EA | $8,660.00 | $5,538.85 | $7,542.01 | -$37,454 |
| 6037-7001 ITS SYSTEM SUPPORT EQUIPMENT | 1 LS | $40,312.00 | $3,147.99 | $46,994.26 | -$37,164 |
| 6009-7001 SYSTEM INTEGRATION | 1 LS | $28,710.00 | $1,311.65 | $28,495.88 | -$27,398 |
| 618-7030 CONDT (PVC) (SCH 40) (2") | 7,805 LF | $17.60 | $14.22 | $13.17 | -$26,381 |
| 505-7003 TMA (MOBILE OPERATION) | 24 DAY | $663.00 | $1,687.46 | $229.60 | $24,587 |
| 650-7028 INS OH SN SUP(30 FT BAL TEE) | 8 EA | $41,809.00 | $44,552.27 | $50,215.84 | $21,946 |
| 620-7016 ELEC CONDR (NO.2) INSULATED | 8,700 LF | $5.94 | $4.55 | $4.79 | -$12,093 |
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 20 EA | $755.00 | $314.80 | $2,173.48 | -$8,804 |
| 624-7008 GROUND BOX TY D (162922)W/APRON | 51 EA | $1,272.00 | $1,134.19 | $1,715.49 | -$7,028 |
| 432-7003 RIPRAP (CONC)(6 IN) | 319.28 CY | $557.00 | $538.05 | $580.25 | -$6,050 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $3,539.00 | $3,953.47 | $11,585.04 | $5,803 |
| 6011-7007 ITS POLE (55 FT)(130 MPH) | 12 EA | $21,439.00 | $21,918.80 | $21,669.00 | $5,758 |
Positive: the low bidder was cheaper on that item. These 20 items account for $29,452 of the $36,530 gap.
TRAF-TEX, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 416-7007 DRILL SHAFT (42 IN) | 288 LF | $608.00 | $318.92 | 1.91x | $83,255 |
| 500-7001 MOBILIZATION | 1 LS | $189,104.00 | $523,850.32 | 0.36x | -$334,746 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $3,539.00 | $11,585.04 | 0.31x | -$112,645 |
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 20 EA | $755.00 | $2,173.48 | 0.35x | -$28,370 |
THIRD COAST SERVICES LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 244 DAY | $1,687.46 | $217.57 | 7.76x | $358,653 |
| 247-7113 FL BS (CMP IN PLC)(TY A GR 1-2) (12") | 3,432.11 SY | $61.63 | $34.64 | 1.78x | $92,649 |
| 505-7003 TMA (MOBILE OPERATION) | 24 DAY | $1,687.46 | $229.60 | 7.35x | $34,989 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $3,953.47 | $11,585.04 | 0.34x | -$106,842 |
| 6004-7002 INSTALL DMS (FOUNDATION MTD CABINET) | 8 EA | $5,462.17 | $15,728.94 | 0.35x | -$82,134 |
| 6037-7001 ITS SYSTEM SUPPORT EQUIPMENT | 1 LS | $3,147.99 | $46,994.26 | 0.07x | -$43,846 |
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 20 EA | $314.80 | $2,173.48 | 0.14x | -$37,174 |
| 6009-7001 SYSTEM INTEGRATION | 1 LS | $1,311.65 | $28,495.88 | 0.05x | -$27,184 |
THE LEVY COMPANY, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7113 FL BS (CMP IN PLC)(TY A GR 1-2) (12") | 3,432.11 SY | $74.00 | $34.64 | 2.14x | $135,104 |
| 416-7007 DRILL SHAFT (42 IN) | 288 LF | $570.00 | $318.92 | 1.79x | $72,311 |
| 432-7001 RIPRAP (CONC)(4 IN) | 15 CY | $1,600.00 | $573.24 | 2.79x | $15,401 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $4,500.00 | $11,585.04 | 0.39x | -$99,191 |
| 6037-7001 ITS SYSTEM SUPPORT EQUIPMENT | 1 LS | $1.00 | $46,994.26 | 0.00x | -$46,993 |
| 505-7001 TMA (STATIONARY) | 244 DAY | $60.00 | $217.57 | 0.28x | -$38,447 |
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 20 EA | $360.00 | $2,173.48 | 0.17x | -$36,270 |
| 6009-7001 SYSTEM INTEGRATION | 1 LS | $3,300.00 | $28,495.88 | 0.12x | -$25,196 |
LIGHT IT UP ELECTRIC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 247-7113 FL BS (CMP IN PLC)(TY A GR 1-2) (12") | 3,432.11 SY | $74.00 | $34.64 | 2.14x | $135,104 |
| 416-7007 DRILL SHAFT (42 IN) | 288 LF | $625.00 | $318.92 | 1.96x | $88,151 |
| 500-7001 MOBILIZATION | 1 LS | $260,000.00 | $523,850.32 | 0.50x | -$263,850 |
| 6037-7001 ITS SYSTEM SUPPORT EQUIPMENT | 1 LS | $10,000.00 | $46,994.26 | 0.21x | -$36,994 |
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 20 EA | $750.00 | $2,173.48 | 0.35x | -$28,470 |
E-Z BEL CONSTRUCTION, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 416-7007 DRILL SHAFT (42 IN) | 288 LF | $730.00 | $318.92 | 2.29x | $118,391 |
| 432-7001 RIPRAP (CONC)(4 IN) | 15 CY | $3,425.00 | $573.24 | 5.97x | $42,776 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $3,660.00 | $11,585.04 | 0.32x | -$110,951 |
| 6052-7002 INSTALLATION OF CELLULAR ROUTER | 20 EA | $100.00 | $2,173.48 | 0.05x | -$41,470 |
| 6037-7001 ITS SYSTEM SUPPORT EQUIPMENT | 1 LS | $19,625.00 | $46,994.26 | 0.42x | -$27,369 |