LRA Valverde
6483-87-001 · let May 22, 2025 · Val Verde, Laredo · Material Maintenance Project - Sealed
$816,620Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+0.3% vs estimate $814,400
$10,760Left on the table1.3% gap to the second bid
2BiddersSpread 1% low to high
3Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | VULCAN CONSTRUCTION MATERIALS, LLC | $816,620 | 0.3% | $10,760 | 0 | 0 | |
| 2 | MARTIN MARIETTA MATERIALS, INC. | $827,380 | +1.3% | 1.6% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7010 LRA (TY I GR AA) (DEL) (ST2) | 3,000 TON | $93.89 | $96.11 | $124.75 | $6,660 |
| 8001-7007 LRA (TY II GR CS) (PICKUP) | 750 TON | $74.00 | $78.00 | $74.00 | $3,000 |
| 8001-7093 LRA (TY II GR CS) (DEL) (ST1) | 5,000 TON | $95.89 | $96.11 | $104.61 | $1,100 |
Positive: the low bidder was cheaper on that item. These 3 items account for $10,760 of the $10,760 gap.