Bid Tab X-ray: 6483-87-001

May 22, 2025 · Val Verde Sign up free
Set your company to personalize scores

LRA Valverde

6483-87-001 · let May 22, 2025 · Val Verde, Laredo · Material Maintenance Project - Sealed

$816,620Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+0.3% vs estimate $814,400
$10,760Left on the table1.3% gap to the second bid
2BiddersSpread 1% low to high
3Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1VULCAN CONSTRUCTION MATERIALS, LLC $816,6200.3% $10,760 0 0
2MARTIN MARIETTA MATERIALS, INC. $827,380+1.3%1.6% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8001-7010 LRA (TY I GR AA) (DEL) (ST2)3,000 TON $93.89$96.11$124.75 $6,660
8001-7007 LRA (TY II GR CS) (PICKUP)750 TON $74.00$78.00$74.00 $3,000
8001-7093 LRA (TY II GR CS) (DEL) (ST1)5,000 TON $95.89$96.11$104.61 $1,100

Positive: the low bidder was cheaper on that item. These 3 items account for $10,760 of the $10,760 gap.