Jackson St. Safe Routes Sidewalk Project
0913-09-132 · let Jun 5, 2025 · Wharton, Yoakum · Pedestrian, Sidewalks & Curb Ramps
$2,130,273Low bid: TI-ZACK CONCRETE, LLC-16.7% vs estimate $2,558,831
$12,431Left on the table0.6% gap to the second bid
6BiddersSpread 49% low to high
83Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TI-ZACK CONCRETE, LLC | $2,130,273 | -16.7% | $12,431 | 4+$311,276 | 4-$464,286 | |
| 2 | STX CIVIL | $2,142,704 | +0.6% | -16.3% | $62,771 | 6+$191,766 | 4-$511,643 |
| 3 | ENCINO LANDSCAPE, INC. | $2,205,475 | +3.5% | -13.8% | $368,339 | 5+$267,046 | 5-$283,185 |
| 4 | C. E. BARKER, LTD. | $2,573,814 | +20.8% | 0.6% | $163,808 | 11+$868,729 | 5-$529,514 |
| 5 | GREY SKY CONSTRUCTION LLC | $2,737,622 | +28.5% | 7.0% | $445,284 | 12+$559,954 | 1-$273,850 |
| 6 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $3,182,905 | +49.4% | 24.4% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
TI-ZACK CONCRETE, LLC vs STX CIVIL, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 531-7002 CONC SIDEWALKS (5") | 3,025 SY | $127.79 | $96.00 | $68.80 | -$96,165 |
| 100-7002 PREPARING ROW | 19 STA | $110.00 | $4,976.00 | $6,072.92 | $92,454 |
| 530-7006 DRIVEWAYS (CONC) | 2,290 SY | $134.12 | $101.00 | $109.20 | -$75,845 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $9,000.00 | $2,260.00 | $11,585.04 | -$74,140 |
| 7045-7004 FIRE HYDRANT ASSEMBLY | 3 EA | $9,290.13 | $30,500.00 | $9,290.13 | $63,630 |
| 7045-7003 WATER MAIN PIPE (PVC)(C900)(8 IN) | 897 LF | $99.81 | $170.00 | $99.81 | $62,960 |
| 500-7001 MOBILIZATION | 1 LS | $221,097.60 | $160,000.00 | $523,850.32 | -$61,098 |
| 7045-7005 WATERLINE REMOVAL (ALL SIZES/MATERIALS) | 902 LF | $34.08 | $80.00 | $34.08 | $41,420 |
| 402-7001 TRENCH EXCAVATION PROTECTION | 940 LF | $0.0100 | $36.00 | $5.96 | $33,831 |
| 620-7007 ELEC CONDR (NO.8) BARE | 105 LF | $2.51 | $250.00 | $1.94 | $25,986 |
| 466-7178 WINGWALL (PW - 1) (HW=8 FT) | 1 EA | $57,297.58 | $32,650.00 | $42,198.45 | -$24,648 |
| 450-7059 RAIL (HANDRAIL)(TY B) | 233 LF | $123.00 | $225.00 | $137.31 | $23,766 |
| 529-7009 CONC CURB & GUTTER (TY II) | 3,011 LF | $61.79 | $54.00 | $32.57 | -$23,456 |
| 450-7032 RAIL (TY C221) | 53 LF | $500.00 | $227.00 | $133.93 | -$14,469 |
| 531-7020 CURB RAMPS (TY 7) | 204 SY | $143.39 | $204.00 | $201.04 | $12,364 |
| 7045-7009 CONNECT TO EXISTING WATER LINE (6 IN) | 3 EA | $3,134.65 | $7,000.00 | $3,134.65 | $11,596 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 1,489 SY | $24.99 | $18.00 | $19.70 | -$10,408 |
| 529-7017 CONC CURB (TY F1) | 77 LF | $302.07 | $176.00 | $168.53 | -$9,707 |
| 7045-7008 CONNECT TO EXISTING WATER LINE (2 IN) | 3 EA | $2,350.99 | $5,200.00 | $2,350.99 | $8,547 |
| 400-7006 CUT & RESTORING PAV | 109 SY | $110.00 | $188.00 | $171.81 | $8,502 |
Positive: the low bidder was cheaper on that item. These 20 items account for -$4,878 of the $12,431 gap.
TI-ZACK CONCRETE, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 531-7002 CONC SIDEWALKS (5") | 3,025 SY | $127.79 | $68.80 | 1.86x | $178,438 |
| 529-7009 CONC CURB & GUTTER (TY II) | 3,011 LF | $61.79 | $32.57 | 1.90x | $87,987 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 1,214 SY | $27.80 | $6.84 | 4.07x | $25,449 |
| 450-7032 RAIL (TY C221) | 53 LF | $500.00 | $133.93 | 3.73x | $19,402 |
| 500-7001 MOBILIZATION | 1 LS | $221,097.60 | $523,850.32 | 0.42x | -$302,753 |
| 100-7002 PREPARING ROW | 19 STA | $110.00 | $6,072.92 | 0.02x | -$113,296 |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 1 EA | $10,418.17 | $34,944.96 | 0.30x | -$24,527 |
| 479-7002 ADJUSTING INLETS | 8 EA | $775.20 | $3,739.05 | 0.21x | -$23,711 |
STX CIVIL: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 7045-7004 FIRE HYDRANT ASSEMBLY | 3 EA | $30,500.00 | $9,290.13 | 3.28x | $63,630 |
| 7045-7005 WATERLINE REMOVAL (ALL SIZES/MATERIALS) | 902 LF | $80.00 | $34.08 | 2.35x | $41,420 |
| 402-7001 TRENCH EXCAVATION PROTECTION | 940 LF | $36.00 | $5.96 | 6.04x | $28,238 |
| 620-7007 ELEC CONDR (NO.8) BARE | 105 LF | $250.00 | $1.94 | 128.61x | $26,046 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 1,214 SY | $24.00 | $6.84 | 3.51x | $20,836 |
| 7045-7009 CONNECT TO EXISTING WATER LINE (6 IN) | 3 EA | $7,000.00 | $3,134.65 | 2.23x | $11,596 |
| 500-7001 MOBILIZATION | 1 LS | $160,000.00 | $523,850.32 | 0.31x | -$363,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $2,260.00 | $11,585.04 | 0.20x | -$102,575 |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 1 EA | $10,200.00 | $34,944.96 | 0.29x | -$24,745 |
| 479-7002 ADJUSTING INLETS | 8 EA | $1,180.00 | $3,739.05 | 0.32x | -$20,472 |
ENCINO LANDSCAPE, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 7045-7003 WATER MAIN PIPE (PVC)(C900)(8 IN) | 897 LF | $250.00 | $99.81 | 2.50x | $134,720 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 400 SY | $300.00 | $98.88 | 3.03x | $80,446 |
| 752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL | 95 LF | $200.00 | $1.20 | 166.82x | $18,886 |
| 462-7068 CONC BOX CULV (6 FT X 5 FT)(EXTEND) | 9 LF | $3,000.00 | $1,109.67 | 2.70x | $17,013 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 1,214 SY | $20.00 | $6.84 | 2.93x | $15,980 |
| 100-7002 PREPARING ROW | 19 STA | $500.00 | $6,072.92 | 0.08x | -$105,886 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $3,000.00 | $11,585.04 | 0.26x | -$94,435 |
| 466-7178 WINGWALL (PW - 1) (HW=8 FT) | 1 EA | $5,000.00 | $42,198.45 | 0.12x | -$37,198 |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 1 EA | $11,000.00 | $34,944.96 | 0.31x | -$23,945 |
| 7045-7005 WATERLINE REMOVAL (ALL SIZES/MATERIALS) | 902 LF | $10.00 | $34.08 | 0.29x | -$21,720 |
C. E. BARKER, LTD.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 7045-7017 REMOV(ABATEMENT)OF ASBESTOS-CEMENT PIPE | 926 LF | $212.13 | $30.00 | 7.07x | $168,652 |
| 432-7001 RIPRAP (CONC)(4 IN) | 60 CY | $2,872.50 | $573.24 | 5.01x | $137,956 |
| 100-7002 PREPARING ROW | 19 STA | $13,000.00 | $6,072.92 | 2.14x | $131,614 |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 400 SY | $417.31 | $98.88 | 4.22x | $127,370 |
| 104-7018 REMOV CONC (CURB OR CURB & GUTTER) | 2,734 LF | $49.38 | $11.27 | 4.38x | $104,203 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 1,489 SY | $71.29 | $19.70 | 3.62x | $76,814 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 1,214 SY | $35.51 | $6.84 | 5.19x | $34,809 |
| 432-7008 RIPRAP (CONC)(CL B)(5 IN) | 11 CY | $2,872.50 | $579.27 | 4.96x | $25,225 |
| 104-7013 REMOV CONC (SIDEWALK, RAMP OR SUP) | 799 SY | $49.38 | $17.88 | 2.76x | $25,169 |
| 505-7001 TMA (STATIONARY) | 20 DAY | $1,219.64 | $217.57 | 5.61x | $20,041 |
| 500-7001 MOBILIZATION | 1 LS | $225,000.00 | $523,850.32 | 0.43x | -$298,850 |
| 530-7006 DRIVEWAYS (CONC) | 2,290 SY | $36.51 | $109.20 | 0.33x | -$166,456 |
| 531-7020 CURB RAMPS (TY 7) | 204 SY | $77.38 | $201.04 | 0.38x | -$25,228 |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 1 EA | $13,174.62 | $34,944.96 | 0.38x | -$21,770 |
| 7045-7005 WATERLINE REMOVAL (ALL SIZES/MATERIALS) | 902 LF | $15.00 | $34.08 | 0.44x | -$17,210 |
GREY SKY CONSTRUCTION LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 100-7002 PREPARING ROW | 19 STA | $12,500.00 | $6,072.92 | 2.06x | $122,114 |
| 529-7009 CONC CURB & GUTTER (TY II) | 3,011 LF | $65.00 | $32.57 | 2.00x | $97,652 |
| 531-7020 CURB RAMPS (TY 7) | 204 SY | $650.00 | $201.04 | 3.23x | $91,587 |
| 7045-7017 REMOV(ABATEMENT)OF ASBESTOS-CEMENT PIPE | 926 LF | $100.00 | $30.00 | 3.33x | $64,820 |
| 104-7018 REMOV CONC (CURB OR CURB & GUTTER) | 2,734 LF | $30.00 | $11.27 | 2.66x | $51,218 |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 1,214 SY | $30.00 | $6.84 | 4.39x | $28,120 |
| 403-7001 TEMPORARY SPL SHORING | 384 SF | $85.00 | $25.56 | 3.33x | $22,825 |
| 531-7021 CURB RAMPS (TY 10) | 54 SY | $650.00 | $266.68 | 2.44x | $20,699 |
| 7045-7006 CASING (STEEL)(18 IN)(OPEN CUT) | 72 LF | $450.00 | $217.68 | 2.07x | $16,727 |
| 7045-7012 GATE VALVE W BOX (8 IN) | 4 EA | $8,500.00 | $4,687.10 | 1.81x | $15,252 |
| 500-7001 MOBILIZATION | 1 LS | $250,000.00 | $523,850.32 | 0.48x | -$273,850 |