FM 2790: 1741-01-013
1741-01-013 · let Jun 4, 2025 · Atascosa, San Antonio · Pedestrian, Sidewalks & Curb Ramps
$1,236,296Low bid: ACEE CONSTRUCTION LLC.-35.1% vs estimate $1,904,135
$488,450Left on the table39.5% gap to the second bid
7BiddersSpread 99% low to high
63Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ACEE CONSTRUCTION LLC. | $1,236,296 | -35.1% | $488,450 | 2+$20,868 | 8-$589,325 | |
| 2 | TI-ZACK CONCRETE, LLC | $1,724,746 | +39.5% | -9.4% | $23,947 | 5+$123,771 | 5-$447,691 |
| 3 | STX CIVIL | $1,748,694 | +41.4% | -8.2% | $23,429 | 7+$240,575 | 4-$478,912 |
| 4 | GARRET SHIELDS INFRASTRUCTURE | $1,772,123 | +43.3% | -6.9% | $132,108 | 6+$153,038 | 3-$436,754 |
| 5 | PRESIDIO CONTRACTING, LLC | $1,904,230 | +54.0% | 0.0% | $272,771 | 6+$312,771 | 3-$377,469 |
| 6 | E-Z BEL CONSTRUCTION, LLC | $2,177,001 | +76.1% | 14.3% | $283,337 | ||
| 7 | GREY SKY CONSTRUCTION LLC | $2,460,338 | +99.0% | 29.2% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
ACEE CONSTRUCTION LLC. vs TI-ZACK CONCRETE, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 531-7001 CONC SIDEWALKS (4") | 4,194 SY | $62.45 | $98.29 | $70.57 | $150,313 |
| 471-7003 GRATE & FRAME | 48 EA | $3,250.00 | $1,093.50 | $1,899.77 | -$103,512 |
| 529-7002 CONC CURB (TY II) | 1,921 LF | $12.40 | $62.11 | $26.45 | $95,493 |
| 530-7006 DRIVEWAYS (CONC) | 2,921 SY | $94.85 | $124.60 | $109.20 | $86,900 |
| 500-7001 MOBILIZATION | 1 LS | $105,000.00 | $190,803.60 | $523,850.32 | $85,804 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 2,841 SY | $5.15 | $28.09 | $19.70 | $65,173 |
| 531-7025 CONC SIDEWALKS (SPECIAL) | 488 SY | $61.55 | $147.95 | $117.04 | $42,163 |
| 505-7001 TMA (STATIONARY) | 108 DAY | $210.00 | $1.10 | $217.57 | -$22,561 |
| 110-7002 EXCAV (CHANNEL) | 256 CY | $15.00 | $93.52 | $16.69 | $20,101 |
| 466-7130 HEADWALL (CH - PW - A - 0) (DES= 4) | 1 EA | $5,093.20 | $22,000.00 | $11,704.56 | $16,907 |
| 432-7003 RIPRAP (CONC)(6 IN) | 34.1 CY | $515.00 | $924.48 | $580.25 | $13,963 |
| 132-7001 EMBANK (FNL)(OC)(TY A) | 146 CY | $15.00 | $109.32 | $22.62 | $13,771 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 216 DAY | $60.00 | $1.10 | $87.82 | -$12,722 |
| 104-7018 REMOV CONC (CURB OR CURB & GUTTER) | 1,244 LF | $2.75 | $12.83 | $11.27 | $12,540 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 2,089 LF | $4.75 | $0.1100 | $5.23 | -$9,693 |
| 100-7001 PREPARING ROW | 1 AC | $2,500.00 | $11,000.00 | $3,995.94 | $8,500 |
| 460-7003 CMP (GAL STL 18 IN) | 97 LF | $50.70 | $137.50 | $70.97 | $8,420 |
| 450-7059 RAIL (HANDRAIL)(TY B) | 517 LF | $114.75 | $129.80 | $137.31 | $7,781 |
| 529-7018 CONC CURB & GUTTER (ARMOR CURB) | 28 LF | $528.10 | $287.07 | $296.58 | -$6,749 |
| 420-7067 CL C CONC (MISC) | 16.1 CY | $520.00 | $924.48 | $1,569.38 | $6,512 |
Positive: the low bidder was cheaper on that item. These 20 items account for $479,102 of the $488,450 gap.
ACEE CONSTRUCTION LLC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 160-7002 FURN & PLACE TOPSOIL (4") | 7,901 SY | $3.25 | $1.43 | 2.27x | $14,385 |
| 529-7018 CONC CURB & GUTTER (ARMOR CURB) | 28 LF | $528.10 | $296.58 | 1.78x | $6,482 |
| 500-7001 MOBILIZATION | 1 LS | $105,000.00 | $523,850.32 | 0.20x | -$418,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $2,750.00 | $11,585.04 | 0.24x | -$61,845 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 2,841 SY | $5.15 | $19.70 | 0.26x | -$41,343 |
| 529-7002 CONC CURB (TY II) | 1,921 LF | $12.40 | $26.45 | 0.47x | -$26,990 |
| 420-7067 CL C CONC (MISC) | 16.1 CY | $520.00 | $1,569.38 | 0.33x | -$16,895 |
| 104-7018 REMOV CONC (CURB OR CURB & GUTTER) | 1,244 LF | $2.75 | $11.27 | 0.24x | -$10,594 |
| 466-7130 HEADWALL (CH - PW - A - 0) (DES= 4) | 1 EA | $5,093.20 | $11,704.56 | 0.44x | -$6,611 |
| 644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG | 19 EA | $316.95 | $643.01 | 0.49x | -$6,195 |
TI-ZACK CONCRETE, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 529-7002 CONC CURB (TY II) | 1,921 LF | $62.11 | $26.45 | 2.35x | $68,502 |
| 110-7002 EXCAV (CHANNEL) | 256 CY | $93.52 | $16.69 | 5.60x | $19,667 |
| 132-7001 EMBANK (FNL)(OC)(TY A) | 146 CY | $109.32 | $22.62 | 4.83x | $12,659 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 7,901 SY | $3.03 | $1.43 | 2.12x | $12,647 |
| 466-7130 HEADWALL (CH - PW - A - 0) (DES= 4) | 1 EA | $22,000.00 | $11,704.56 | 1.88x | $10,295 |
| 500-7001 MOBILIZATION | 1 LS | $190,803.60 | $523,850.32 | 0.36x | -$333,047 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $2,750.00 | $11,585.04 | 0.24x | -$61,845 |
| 505-7001 TMA (STATIONARY) | 108 DAY | $1.10 | $217.57 | 0.01x | -$23,379 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 216 DAY | $1.10 | $87.82 | 0.01x | -$18,731 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 2,089 LF | $0.1100 | $5.23 | 0.02x | -$10,689 |
STX CIVIL: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 531-7025 CONC SIDEWALKS (SPECIAL) | 488 SY | $320.00 | $117.04 | 2.73x | $99,046 |
| 450-7059 RAIL (HANDRAIL)(TY B) | 517 LF | $285.00 | $137.31 | 2.08x | $76,357 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 7,901 SY | $4.00 | $1.43 | 2.80x | $20,311 |
| 100-7001 PREPARING ROW | 1 AC | $17,500.00 | $3,995.94 | 4.38x | $13,504 |
| 351-7009 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | 170 SY | $150.00 | $77.78 | 1.93x | $12,278 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 2,089 LF | $10.00 | $5.23 | 1.91x | $9,971 |
| 132-7001 EMBANK (FNL)(OC)(TY A) | 146 CY | $85.00 | $22.62 | 3.76x | $9,108 |
| 500-7001 MOBILIZATION | 1 LS | $145,000.00 | $523,850.32 | 0.28x | -$378,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $2,200.00 | $11,585.04 | 0.19x | -$65,695 |
| 505-7001 TMA (STATIONARY) | 108 DAY | $25.00 | $217.57 | 0.11x | -$20,798 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 216 DAY | $25.00 | $87.82 | 0.28x | -$13,569 |
GARRET SHIELDS INFRASTRUCTURE: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 529-7002 CONC CURB (TY II) | 1,921 LF | $50.00 | $26.45 | 1.89x | $45,239 |
| 162-7002 BLOCK SODDING | 7,901 SY | $10.00 | $4.39 | 2.28x | $44,343 |
| 531-7020 CURB RAMPS (TY 7) | 72 SY | $500.00 | $201.04 | 2.49x | $21,525 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 7,901 SY | $4.00 | $1.43 | 2.80x | $20,311 |
| 132-7001 EMBANK (FNL)(OC)(TY A) | 146 CY | $100.00 | $22.62 | 4.42x | $11,298 |
| 531-7015 CURB RAMPS (TY 1) | 36 SY | $500.00 | $213.28 | 2.34x | $10,322 |
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $523,850.32 | 0.29x | -$373,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $5,000.00 | $11,585.04 | 0.43x | -$46,095 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 216 DAY | $10.00 | $87.82 | 0.11x | -$16,809 |
PRESIDIO CONTRACTING, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 531-7025 CONC SIDEWALKS (SPECIAL) | 488 SY | $430.00 | $117.04 | 3.67x | $152,726 |
| 471-7003 GRATE & FRAME | 48 EA | $3,550.00 | $1,899.77 | 1.87x | $79,211 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 7,901 SY | $5.00 | $1.43 | 3.50x | $28,212 |
| 505-7001 TMA (STATIONARY) | 108 DAY | $385.00 | $217.57 | 1.77x | $18,082 |
| 132-7001 EMBANK (FNL)(OC)(TY A) | 146 CY | $145.00 | $22.62 | 6.41x | $17,868 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 216 DAY | $165.00 | $87.82 | 1.88x | $16,671 |
| 500-7001 MOBILIZATION | 1 LS | $190,000.00 | $523,850.32 | 0.36x | -$333,850 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 2,841 SY | $8.10 | $19.70 | 0.41x | -$32,962 |
| 104-7018 REMOV CONC (CURB OR CURB & GUTTER) | 1,244 LF | $2.70 | $11.27 | 0.24x | -$10,656 |