2026 ORANGE AREA MBGF
6475-25-001 · let Jun 4, 2025 · Jasper, Beaumont · Routine Maintenance Project - Sealed
$671,470Low bid: ROSS SA ENTERPRISE LLC-52.6% vs estimate $1,415,278
$109,341Left on the table16.3% gap to the second bid
4BiddersSpread 33% low to high
73Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ROSS SA ENTERPRISE LLC | $671,470 | -52.6% | $109,341 | 6+$420,541 | 9-$209,928 | |
| 2 | ISI CONTRACTING, INC. | $780,811 | +16.3% | -44.8% | $15,659 | 5+$400,767 | 6-$58,758 |
| 3 | T&L CLEANING SERVICES LLC | $796,470 | +18.6% | -43.7% | $99,326 | 10+$297,134 | 7-$101,437 |
| 4 | ACE CONTRACTORS, INC. | $895,796 | +33.4% | -36.7% | 12+$375,280 | 5-$77,927 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
ROSS SA ENTERPRISE LLC vs ISI CONTRACTING, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 15 EA | $7,468.00 | $2,371.00 | $2,869.78 | -$76,455 |
| 451-7049 RETROFIT RAIL (TY T131RC) | 150 LF | $40.00 | $276.00 | $228.58 | $35,400 |
| 774-7005 REPLACE (SMTC) WIDE | 1 EA | $5,000.00 | $37,677.00 | $25,508.81 | $32,677 |
| 770-7015 REPL SINGLE GDRAIL TERM IMPACT HEAD | 30 EA | $1.00 | $1,049.00 | $975.38 | $31,440 |
| 500-7002 MOBILIZATION (CALLOUT) | 60 EA | $1.00 | $355.00 | $600.85 | $21,240 |
| 770-7018 REPLACE BLOCKOUT | 200 EA | $50.00 | $150.00 | $44.95 | $20,000 |
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 5,000 LF | $8.00 | $12.00 | $22.03 | $20,000 |
| 770-7016 REPLACE SINGLE GDRAIL TERMINAL RAIL | 1,000 LF | $25.00 | $7.00 | $31.82 | -$18,000 |
| 774-7020 REPLACE (TAU II-R) NARROW | 1 EA | $25,000.00 | $37,677.00 | $8,529.41 | $12,677 |
| 774-7026 REPLACE (NARROW QUAD) | 1 EA | $25,000.00 | $37,677.00 | $9,579.42 | $12,677 |
| 774-7002 REPLACE (SMTC) NARROW | 1 EA | $25,000.00 | $31,354.00 | $24,419.83 | $6,354 |
| 505-7001 TMA (STATIONARY) | 62 DAY | $5,000.00 | $5,100.00 | $217.57 | $6,200 |
| 774-7029 REPAIR (NARROW QUAD BAY) | 5 EA | $1,500.00 | $527.00 | $1,490.11 | -$4,865 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 1 DAY | $4,800.00 | $211.00 | $87.82 | -$4,589 |
| 540-7041 TERMINAL ANCHOR SECTION | 5 EA | $1.00 | $896.00 | $630.09 | $4,475 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 10 CY | $100.00 | $533.00 | $616.83 | $4,330 |
| 770-7023 REPLACE SGT CABLE ASSEMBLY | 30 EA | $1.00 | $117.00 | $98.88 | $3,480 |
| 770-7017 REPLACE SINGLE GDRAIL TERMINAL POST | 175 EA | $50.00 | $31.00 | $67.59 | -$3,325 |
| 770-7019 REPAIR STEEL POST WITH BASE PLATE | 10 EA | $50.00 | $376.00 | $137.68 | $3,260 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $500.00 | $709.00 | $844.81 | $2,508 |
Positive: the low bidder was cheaper on that item. These 20 items account for $109,484 of the $109,341 gap.
ROSS SA ENTERPRISE LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 62 DAY | $5,000.00 | $217.57 | 22.98x | $296,511 |
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 15 EA | $7,468.00 | $2,869.78 | 2.60x | $68,973 |
| 774-7008 REPLACE (QUAD - ELITE) NARROW | 1 EA | $25,000.00 | $6,545.91 | 3.82x | $18,454 |
| 774-7020 REPLACE (TAU II-R) NARROW | 1 EA | $25,000.00 | $8,529.41 | 2.93x | $16,471 |
| 774-7026 REPLACE (NARROW QUAD) | 1 EA | $25,000.00 | $9,579.42 | 2.61x | $15,421 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 1 DAY | $4,800.00 | $87.82 | 54.66x | $4,712 |
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 5,000 LF | $8.00 | $22.03 | 0.36x | -$70,138 |
| 500-7002 MOBILIZATION (CALLOUT) | 60 EA | $1.00 | $600.85 | 0.00x | -$35,991 |
| 770-7015 REPL SINGLE GDRAIL TERM IMPACT HEAD | 30 EA | $1.00 | $975.38 | 0.00x | -$29,232 |
| 451-7049 RETROFIT RAIL (TY T131RC) | 150 LF | $40.00 | $228.58 | 0.17x | -$28,287 |
| 774-7005 REPLACE (SMTC) WIDE | 1 EA | $5,000.00 | $25,508.81 | 0.20x | -$20,509 |
| 774-7021 REPAIR (TAU II-R) NARROW | 50 LF | $100.00 | $272.67 | 0.37x | -$8,633 |
| 770-7004 REPLACE SHORT RADIUS SYS (TL-2) | 25 EA | $1.00 | $339.20 | 0.00x | -$8,455 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 10 CY | $100.00 | $616.83 | 0.16x | -$5,168 |
| 774-7007 REMOVE (QUAD - ELITE) NARROW | 10 EA | $25.00 | $376.57 | 0.07x | -$3,516 |
ISI CONTRACTING, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 62 DAY | $5,100.00 | $217.57 | 23.44x | $302,711 |
| 774-7020 REPLACE (TAU II-R) NARROW | 1 EA | $37,677.00 | $8,529.41 | 4.42x | $29,148 |
| 774-7026 REPLACE (NARROW QUAD) | 1 EA | $37,677.00 | $9,579.42 | 3.93x | $28,098 |
| 770-7018 REPLACE BLOCKOUT | 200 EA | $150.00 | $44.95 | 3.34x | $21,009 |
| 774-7008 REPLACE (QUAD - ELITE) NARROW | 1 EA | $26,348.00 | $6,545.91 | 4.03x | $19,802 |
| 770-7016 REPLACE SINGLE GDRAIL TERMINAL RAIL | 1,000 LF | $7.00 | $31.82 | 0.22x | -$24,818 |
| 774-7021 REPAIR (TAU II-R) NARROW | 50 LF | $105.00 | $272.67 | 0.39x | -$8,383 |
| 770-7004 REPLACE SHORT RADIUS SYS (TL-2) | 25 EA | $21.00 | $339.20 | 0.06x | -$7,955 |
| 770-7017 REPLACE SINGLE GDRAIL TERMINAL POST | 175 EA | $31.00 | $67.59 | 0.46x | -$6,404 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 100 EA | $26.00 | $89.82 | 0.29x | -$6,382 |
| 774-7029 REPAIR (NARROW QUAD BAY) | 5 EA | $527.00 | $1,490.11 | 0.35x | -$4,816 |
T&L CLEANING SERVICES LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 770-7004 REPLACE SHORT RADIUS SYS (TL-2) | 25 EA | $5,000.00 | $339.20 | 14.74x | $116,520 |
| 770-7016 REPLACE SINGLE GDRAIL TERMINAL RAIL | 1,000 LF | $100.00 | $31.82 | 3.14x | $68,182 |
| 774-7005 REPLACE (SMTC) WIDE | 1 EA | $51,000.00 | $25,508.81 | 2.00x | $25,491 |
| 774-7008 REPLACE (QUAD - ELITE) NARROW | 1 EA | $30,000.00 | $6,545.91 | 4.58x | $23,454 |
| 774-7026 REPLACE (NARROW QUAD) | 1 EA | $26,000.00 | $9,579.42 | 2.71x | $16,421 |
| 540-7003 MTL THRIE-BEAM GD FEN (TIM POST) | 10 LF | $1,500.00 | $25.79 | 58.16x | $14,742 |
| 774-7020 REPLACE (TAU II-R) NARROW | 1 EA | $20,000.00 | $8,529.41 | 2.34x | $11,471 |
| 545-7001 CRASH CUSH ATTEN (DES SOURCE) | 1 EA | $10,000.00 | $1,747.21 | 5.72x | $8,253 |
| 429-7009 CONC STR REPAIR (STANDARD) | 18 SF | $500.00 | $146.35 | 3.42x | $6,366 |
| 774-7007 REMOVE (QUAD - ELITE) NARROW | 10 EA | $1,000.00 | $376.57 | 2.66x | $6,234 |
| 500-7002 MOBILIZATION (CALLOUT) | 60 EA | $1.00 | $600.85 | 0.00x | -$35,991 |
| 451-7049 RETROFIT RAIL (TY T131RC) | 150 LF | $100.00 | $228.58 | 0.44x | -$19,287 |
| 505-7001 TMA (STATIONARY) | 62 DAY | $1.00 | $217.57 | 0.00x | -$13,427 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $1.00 | $844.81 | 0.00x | -$10,126 |
| 774-7021 REPAIR (TAU II-R) NARROW | 50 LF | $100.00 | $272.67 | 0.37x | -$8,633 |
| 770-7018 REPLACE BLOCKOUT | 200 EA | $10.00 | $44.95 | 0.22x | -$6,991 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 100 EA | $20.00 | $89.82 | 0.22x | -$6,982 |
ACE CONTRACTORS, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 62 DAY | $3,000.00 | $217.57 | 13.79x | $172,511 |
| 774-7020 REPLACE (TAU II-R) NARROW | 1 EA | $35,000.00 | $8,529.41 | 4.10x | $26,471 |
| 770-7017 REPLACE SINGLE GDRAIL TERMINAL POST | 175 EA | $200.00 | $67.59 | 2.96x | $23,171 |
| 774-7003 REPAIR (SMTC) NARROW | 10 LF | $2,500.00 | $202.80 | 12.33x | $22,972 |
| 774-7005 REPLACE (SMTC) WIDE | 1 EA | $47,500.00 | $25,508.81 | 1.86x | $21,991 |
| 774-7009 REPAIR (QUAD - ELITE) NARROW | 10 LF | $2,000.00 | $136.65 | 14.64x | $18,634 |
| 774-7027 REPAIR (NARROW QUAD) | 10 LF | $2,000.00 | $153.69 | 13.01x | $18,463 |
| 774-7008 REPLACE (QUAD - ELITE) NARROW | 1 EA | $25,000.00 | $6,545.91 | 3.82x | $18,454 |
| 774-7006 REPAIR (SMTC) WIDE | 10 LF | $2,000.00 | $172.25 | 11.61x | $18,278 |
| 774-7026 REPLACE (NARROW QUAD) | 1 EA | $25,000.00 | $9,579.42 | 2.61x | $15,421 |
| 500-7002 MOBILIZATION (CALLOUT) | 60 EA | $1.00 | $600.85 | 0.00x | -$35,991 |
| 451-7049 RETROFIT RAIL (TY T131RC) | 150 LF | $100.00 | $228.58 | 0.44x | -$19,287 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $1.00 | $844.81 | 0.00x | -$10,126 |
| 770-7004 REPLACE SHORT RADIUS SYS (TL-2) | 25 EA | $25.00 | $339.20 | 0.07x | -$7,855 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 10 CY | $150.00 | $616.83 | 0.24x | -$4,668 |